1. Transmission Developers would provide electricity transmission in underwater cables (previous story this week), that can be lain in aqueducts, riverbeds and lakes, or down ocean coastlines – clearing the one big hindrance to the development of renewable energy, which is the new transmission needed, and the NIMBYism that succeeds in prevents that from being built, because these would be out of sight.
2. The other, Riverbank Power – an equally innovative breakthrough, would provide a complete solution to storing wind power (previous story) effectively making it dispatchable base-load power.