The facility is being built in the UK for E.ON at Holford, Cheshire, UK, and will store gas in eight salt caverns deep underground. The processing plant consists of several gas compressors which optimise the pressure of gas stored and withdrawn from the caverns into the National Grid Transmission System. Designed to hold over 160 million cubic metres of gas, the plant will be controlled by ABB Extended Automation System 800xA and integrated with the telecoms systems providing a single point of access and control for operational personnel.
1More
Jababeka Business: Piezoelectric motors save power and downsize electronic access control - 0 views
Tagging & annotation - 159 views
1 - 10 of 10
Showing 20▼ items per page