Skip to main content

Home/ SpringHill Group/ Group items tagged Replacement

Rss Feed Group items tagged

amber sanpedro

Springhill Group - 0 views

  •  
    Hospital Corporation of America Chillers, Pumps, and Boiler Replacement Project Wednesday, January 18 · Edit "http://ambersanpedro.livejournal.com/1011.html This project consisted of removing and replacing (2) existing 1100 ton chillers, removing (4) existing tower water pumps which were replaced with (2), and removing (3) existing chilled water pumps which were replaced with (2). A single new 400HP boiler was installed where one of the existing original boiler's was demolished by an owner paid subcontractor separate from this contract. There was also a generator that was removed in order to make room in the chiller room for the new equipment and piping. A large condensing unit servicing some operating rooms had to be relocated in order to allow access to the mechanical room for demolition and delivery of the new equipment and piping. Much of the existing chilled water and tower water piping was removed and replaced with throughout the chiller room and on the mezzanine above the chiller room. Steam, condensate and fuel oil piping servicing the old boiler was removed and re-configured to meet the needs of the new boiler. Access to the south mechanical room was very limited. All of the equipment and piping had to be hoisted into and out of an access shaft just large enough for the new equipment. Besides the limited space, the set-up area for the hoisting rig was right next to the Emergency Room/Helepad entrance. The coordination with our hoisting and rigging subcontractor, the hospital personnel and Stanger Industries years of experience with similar projects proved invaluable on this challenging aspect of the project. One of the stipulations of this project was to insure that all systems would remain on line during the installation of all of the new equipment. In order to accomplish this task, isolation valves were installed in key locations to allow us to isolate this south mechanical room from the rest of the system and utilize the north mechanical room's
amber sanpedro

Hospital Corporation of America Chillers, Pumps, a - Slashdot - 0 views

  •  
    http://ambersanpedro.livejournal.com/1011.html This project consisted of removing and replacing (2) existing 1100 ton chillers, removing (4) existing tower water pumps which were replaced with (2), and removing (3) existing chilled water pumps which were replaced with (2). A single new 400HP boiler was installed where one of the existing original boiler's was demolished by an owner paid subcontractor separate from this contract. There was also a generator that was removed in order to make room in the chiller room for the new equipment and piping. A large condensing unit servicing some operating rooms had to be relocated in order to allow access to the mechanical room for demolition and delivery of the new equipment and piping. Much of the existing chilled water and tower water piping was removed and replaced with throughout the chiller room and on the mezzanine above the chiller room. Steam, condensate and fuel oil piping servicing the old boiler was removed and re-configured to meet the needs of the new boiler. Access to the south mechanical room was very limited. All of the equipment and piping had to be hoisted into and out of an access shaft just large enough for the new equipment. Besides the limited space, the set-up area for the hoisting rig was right next to the Emergency Room/Helepad entrance. The coordination with our hoisting and rigging subcontractor, the hospital personnel and Stanger Industries years of experience with similar projects proved invaluable on this challenging aspect of the project. One of the stipulations of this project was to insure that all systems would remain on line during the installation of all of the new equipment. In order to accomplish this task, isolation valves were installed in key locations to allow us to isolate this south mechanical room from the rest of the system and utilize the north mechanical room's equipment to keep things on line. The shut-down/drain down of the towers was scheduled and coordinated with hosp
faith piper

News Center - Springhill Group Home Loan | springhillgroupbyrichparker.blogspot.com - 1 views

  •  
    Repost From : http://springhillgroupbyrichparker.blogspot.com/ BLOGSPOT: Police Reports for Feb. 26, 2012 - The Bozeman Daily Chronicle: Police Reports http://springhillgrouphome.tumblr.com/post/19662057363/springhill-group The Bozeman Police Department reports for Sunday included the following: People were fighting in front of an East Main Street bar. Most fled when police arrived around 1:40 a.m. The man who was assaulted did not want to press charges. Police found "a man by himself drinking a beer and playing loud video games at 5:30 a.m. on Sunday morning" on Ida Avenue after a neighbor complained about the noise. A 21-year-old Belgrade man was cited for stealing two DVDs from a Catron Street store around 1:45 p.m. Read more . . . Spring Hill Hotels, Motels - Florida FL - Spring Hill Hotel Discounts http://springhillcaregroup.multiply.com/journal/item/57/Spring_Hill_Hotels_Motels_-_Florida_FL_-_Spring_Hill_Hotel_Discounts Spring Hill Hotels, Motels, and Reviews Hampton Inn Spring Hill - $$ 1344 Commercial Way, US 19, Spring Hill, FL 34606 Rated average by verified guestsMidscale, highway hotel near Weekiwatchee PreserveAlso near Buccaneer Bay3 floors, 732 rooms - elevatorOutdoor swimming pool - exercise roomFree Internet access - free parkingNot pet-friendly - no pets allowed - Jan 2011Hotel ReviewsConveniently located - worth the price - room was clean - liked the upscale linens - staff was friendly - appreciated the snacks and wine - nice hotelGood location and rates - room was cleanBeds were fabulous - the elevator carpet was filthyRoom was spacious - housekeeping was intrusive - not much selection a breakfastConvenient location - room wasn't clean enough - employees were friendly and pleasant - breakfast was a disappointment Read more. . . Boiler Parts, Boiler Repair & Boiler Room Supplies for Steam Heating (statesupply) - Boiler Room Supplies Boiler Gaskets, Unit Heaters and Much More! At State Supply, we specialize in
kylie cassidy

Springhill Group | springhillgroupbyrichparker.blogspot.com | Facebook - 1 views

  •  
    Repost From : http://springhillgroupbyrichparker.blogspot.com/ http://www.facebook.com/notes/springhill-group-home-loans-news-center/springhill-group-springhillgroupbyrichparkerblogspotcom/300574126678023 BLOGSPOT: Police Reports for Feb. 26, 2012 - The Bozeman Daily Chronicle: Police Reports http://springcaregroup.blogspot.com/2012/03/police-reports-for-feb-26-2012-bozeman.html The Bozeman Police Department reports for Sunday included the following: People were fighting in front of an East Main Street bar. Most fled when police arrived around 1:40 a.m. The man who was assaulted did not want to press charges. Police found "a man by himself drinking a beer and playing loud video games at 5:30 a.m. on Sunday morning" on Ida Avenue after a neighbor complained about the noise. A 21-year-old Belgrade man was cited for stealing two DVDs from a Catron Street store around 1:45 p.m. Read more . . . Spring Hill Hotels, Motels - Florida FL - Spring Hill Hotel Discounts http://springhillcaregroup.multiply.com/journal/item/57/Spring_Hill_Hotels_Motels_-_Florida_FL_-_Spring_Hill_Hotel_Discounts Spring Hill Hotels, Motels, and Reviews Hampton Inn Spring Hill - $$ 1344 Commercial Way, US 19, Spring Hill, FL 34606 Rated average by verified guestsMidscale, highway hotel near Weekiwatchee PreserveAlso near Buccaneer Bay3 floors, 732 rooms - elevatorOutdoor swimming pool - exercise roomFree Internet access - free parkingNot pet-friendly - no pets allowed - Jan 2011Hotel ReviewsConveniently located - worth the price - room was clean - liked the upscale linens - staff was friendly - appreciated the snacks and wine - nice hotelGood location and rates - room was cleanBeds were fabulous - the elevator carpet was filthyRoom was spacious - housekeeping was intrusive - not much selection a breakfastConvenient location - room wasn't clean enough - employees were friendly and pleasant - breakfast was a disappointment Read more. . . Boiler Parts, Boiler Repair
melissa rocks

Springhill Group Home: Sony Cutting 6% of Global Workforce | News Center - Springhill G... - 0 views

  •  
    Sony, the giant Japanese electronics maker, plans to cut 6% of its workforce or around 10,000 jobs as they continue with their efforts to restructure their business, the 3rd job cut since 2005. It has already sold 2 divisions and is now scaling back its TV production.   According to Bloomberg's data, the biggest consumer electronics exporter in Japan has 168,200 staff last year. Around half of the job cuts resulted from publicized deals the company has previously made. Last month, Sony sold a chemicals subsidiary to the Development Bank of Japan while it spun off small LCD production last year into a joint deal with Toshiba and Hitachi. The remaining 5,000 job cuts will come from its unprofitable TV division that is now being overhauled in hopes of restoring the firm's health.   The 51-year old CEO, Kazuo Hirai, replaced Howard Stringer this month and immediately set out to do his promise of "unavoidable, painful choices" in order to turn the company's operations into a more profitable one.   Hirai has been credited in making the PlayStation business profitable; now he is set to put himself in charge of and bring a new team for the firm's TV business. Sony even revealed a new organizational chart that has omitted a management layer between the CEO and the head of TV department so Hirai could manage them directly.
katelyn williams

New boiler technology promises cleaner energy -LIVEJOURNAL -BLOGGER - 0 views

  •  
    SOUTH KOREA Despite success and promise, the wide-scale deployment of integrated gasification combined-cycle IGCC in South Korea is a few years away. The country has negligible domestic coal production, only possessing 149 million tons of recoverable coal reserves, and must import coal to satisfy demand. Over the years, South Korea has become the world's second-largest coal importer, after Japan. The electric power sector accounts for more than half of coal consumption, though IGCC promises a much cleaner future for coal-fired power plants. While IGCC is in line with South Korea's new and renewable energy program, the country cannot afford to wait for new technology to be employed, nor drastically decrease imports in favor of emissions reduction. Currently, most of the world, including South Korea, employs pulverized-bed boilers PBB in coal-fired power plants and these, along with past types of boilers, have given coal-powered plants very poor reputations. PBB plants require that coal be ground into a fine dust before being fired at high temperatures escaping emissions, such as sulfuric oxides and nitric oxides, are ineffectively collected by scrubbers. Coal plants have the reputation of being among the most pollution-inducing types of power plant. A new boiler technology is rapidly taking hold in the world of coal-derived energy, and this new technology may serve as a more-than-suitable bridge between PBB and IGCC. Circular fluidized-bed combustion, known better as FBC, utilizes fluidized-bed boilers FBB that do not require coal dust or extremely high temperatures. Granulated coal is loaded onto a suspended boiling before held aloft by upward-blowing air currents, tumbling the coal. This tumbling motion allows for more effective combustion and requires lower combustion temperatures. Combustion in FBBs occurs below the threshold temperature at which nitric oxides are produced, thus eliminating the need for that type of emissions capture. Internal limesto
Isabella Amber

New boiler technology promises cleaner energy -LIVEJOURNAL - 0 views

  •  
    SOUTH KOREA Despite success and promise, the wide-scale deployment of integrated gasification combined-cycle IGCC in South Korea is a few years away. The country has negligible domestic coal production, only possessing 149 million tons of recoverable coal reserves, and must import coal to satisfy demand. Over the years, South Korea has become the world's second-largest coal importer, after Japan. The electric power sector accounts for more than half of coal consumption, though IGCC promises a much cleaner future for coal-fired power plants. While IGCC is in line with South Korea's new and renewable energy program, the country cannot afford to wait for new technology to be employed, nor drastically decrease imports in favor of emissions reduction. Currently, most of the world, including South Korea, employs pulverized-bed boilers PBB in coal-fired power plants and these, along with past types of boilers, have given coal-powered plants very poor reputations. PBB plants require that coal be ground into a fine dust before being fired at high temperatures escaping emissions, such as sulfuric oxides and nitric oxides, are ineffectively collected by scrubbers. Coal plants have the reputation of being among the most pollution-inducing types of power plant. A new boiler technology is rapidly taking hold in the world of coal-derived energy, and this new technology may serve as a more-than-suitable bridge between PBB and IGCC. Circular fluidized-bed combustion, known better as FBC, utilizes fluidized-bed boilers FBB that do not require coal dust or extremely high temperatures. Granulated coal is loaded onto a suspended boiling before held aloft by upward-blowing air currents, tumbling the coal. This tumbling motion allows for more effective combustion and requires lower combustion temperatures. Combustion in FBBs occurs below the threshold temperature at which nitric oxides are produced, thus eliminating the need for that type of emissions capture. Internal limes
hannah brooklyn

newscentershgh at Springhill Group Home : Heating Systems Explained - 0 views

  •  
    News Center - Springhill Group Home Loans newscentershgh Heating Systems Explained Gas Heating Systems Modern gas central heating systems are safe, controllable and efficient to run but can cause confusion as they have a number of controls that you may not fully understand. Using heating controls properly can:- Improve the comfort of your home Reduce the energy used and your fuel bills Avoid the risk of condensation dampness To get the best out of your system, you should follow the manufacturers instructions. If you have mislaid the instruction booklet for your systems, most manufacturers can provide a replacement. Why have controls on a gas central heating system? For a gas central heating and hot water system to operate efficiently it must be able to be controlled so that heating and hot water are provided at a suitable temperature, when and where you want it. Most systems include:- Boiler (which can be a condensing, condensing combi, conventional or conventional combi model) Hot water tank for systems without a combi boiler Room thermostat Radiators Thermostatic radiator controls Programmer The Boiler A conventional boiler heats up the water which is circulated through radiators to provide heat. The water also circulates through a coil in the hot water tank, which in turn heats up the rest of the water in the cylinder to provide running hot water. If your boiler is a 'combi' boiler then the water is heated instantaneously when the hot water taps are switched on. The thermostat on the boiler controls the temperature of the water circulating around the system. Please refer to the manufacturer's instructions for the optimum setting of the thermostat. Hot Water Tank Most hot water cylinders have a thermostat; this is recommended to be set at 60°C. To retain as much heat as possible the cylinder should have 80mm of insulation. Radiators Radiators are most commonly used in "wet" (uses water) central heating systems. T
melissa rocks

Home loans scheme | Livejournal - 0 views

  •  
    If you live in a Universal Home Insulation Scheme (UHIS) area in Scotland you could benefit from an interest free loan of up to £10,000. To find out if you live in a UHIS area please contact your local Energy Saving Scotland advice centre on 0800 512 012 What's on offer? · Loans of between £500 and £10,000 are available (please note: loans are only available up to a maximum of £4,000 for solar photovoltaic (PV), wind turbines and small scale hydro technologies · Loans are interest free so you only pay back what you borrow · Applicants can pay back the loan in monthly instalments over a maximum of eight years. Loans can be combined with funding from fuel suppliers under the Carbon Emission Reduction Target. Loans cannot be combined with an Energy Saving Scotland Boiler Scrappage Scheme voucher. What can I use the loan for? · Installing cavity wall or solid wall insulation and/or loft insulation · Installing renewable energy systems, such as wind turbines, solar photovoltaic, solar water and space heating, heat pumps (ground, air and water source), small scale hydro and wood fuelled boiler systems · Replacing old, inefficient boilers with an Energy Saving Trust Recommended (ESTR) boiler The energy efficiency or renewable measure funded by the loan must be recommended in one of the following documents: · Energy Performance Certificate (within the home report completed when buying, renting or selling a home) · Home energy report for energy efficiency measures only (produced on completion of an Energy Saving Trust Home Energy Check (HEC) · Home Energy Generation report (completed via a phone survey carried out by an Energy Saving Scotland home renewables advisor ) · Home report on renewables and energy efficiency ( completed via a home visit from an Energy Saving Scotland home renewables advisor), or · Energy Assistance Package (EAP) Stage Four
melissa rocks

Home loans scheme | Livejournal - The-looser-it-s-me - 0 views

  •  
    If you live in a Universal Home Insulation Scheme (UHIS) area in Scotland you could benefit from an interest free loan of up to £10,000. To find out if you live in a UHIS area please contact your local Energy Saving Scotland advice centre on 0800 512 012 What's on offer? · Loans of between £500 and £10,000 are available (please note: loans are only available up to a maximum of £4,000 for solar photovoltaic (PV), wind turbines and small scale hydro technologies · Loans are interest free so you only pay back what you borrow · Applicants can pay back the loan in monthly instalments over a maximum of eight years. Loans can be combined with funding from fuel suppliers under the Carbon Emission Reduction Target. Loans cannot be combined with an Energy Saving Scotland Boiler Scrappage Scheme voucher. What can I use the loan for? · Installing cavity wall or solid wall insulation and/or loft insulation · Installing renewable energy systems, such as wind turbines, solar photovoltaic, solar water and space heating, heat pumps (ground, air and water source), small scale hydro and wood fuelled boiler systems · Replacing old, inefficient boilers with an Energy Saving Trust Recommended (ESTR) boiler The energy efficiency or renewable measure funded by the loan must be recommended in one of the following documents: · Energy Performance Certificate (within the home report completed when buying, renting or selling a home) · Home energy report for energy efficiency measures only (produced on completion of an Energy Saving Trust Home Energy Check (HEC) · Home Energy Generation report (completed via a phone survey carried out by an Energy Saving Scotland home renewables advisor ) · Home report on renewables and energy efficiency ( completed via a home visit from an Energy Saving Scotland home renewables advisor), or · Energy Assistance Package (EAP) Stage Four managing agent letter detailing the work recommended. You can find out mor
melissa rocks

Home loans scheme | Livejournal : A Jetpak created by melissarocks : Jeteye - 0 views

  •  
    If you live in a Universal Home Insulation Scheme (UHIS) area in Scotland you could benefit from an interest free loan of up to £10,000. To find out if you live in a UHIS area please contact your local Energy Saving Scotland advice centre on 0800 512 012 What's on offer? · Loans of between £500 and £10,000 are available (please note: loans are only available up to a maximum of £4,000 for solar photovoltaic (PV), wind turbines and small scale hydro technologies · Loans are interest free so you only pay back what you borrow · Applicants can pay back the loan in monthly instalments over a maximum of eight years. Loans can be combined with funding from fuel suppliers under the Carbon Emission Reduction Target. Loans cannot be combined with an Energy Saving Scotland Boiler Scrappage Scheme voucher. What can I use the loan for? · Installing cavity wall or solid wall insulation and/or loft insulation · Installing renewable energy systems, such as wind turbines, solar photovoltaic, solar water and space heating, heat pumps (ground, air and water source), small scale hydro and wood fuelled boiler systems · Replacing old, inefficient boilers with an Energy Saving Trust Recommended (ESTR) boiler The energy efficiency or renewable measure funded by the loan must be recommended in one of the following documents: · Energy Performance Certificate (within the home report completed when buying, renting or selling a home) · Home energy report for energy efficiency measures only (produced on completion of an Energy Saving Trust Home Energy Check (HEC) · Home Energy Generation report (completed via a phone survey carried out by an Energy Saving Scotland home renewables advisor ) · Home report on renewables and energy efficiency ( completed via a home visit from an Energy Saving Scotland home renewables advisor), or · Energy Assistance Package (EAP) Stage Four managing agent letter detailing the work recommended. You can find out more about all these documents and how to
amber sanpedro

Home loans scheme - The-looser-it-s-me - 0 views

  •  
    If you live in a Universal Home Insulation Scheme (UHIS) area in Scotland you could benefit from an interest free loan of up to £10,000. To find out if you live in a UHIS area please contact your local Energy Saving Scotland advice centre on 0800 512 012 What's on offer? Loans of between £500 and £10,000 are available (please note: loans are only available up to a maximum of £4,000 for solar photovoltaic (PV), wind turbines and small scale hydro technologies Loans are interest free so you only pay back what you borrow Applicants can pay back the loan in monthly instalments over a maximum of eight years. Loans can be combined with funding from fuel suppliers under the Carbon Emission Reduction Target. Loans cannot be combined with an Energy Saving Scotland Boiler Scrappage Scheme voucher. What can I use the loan for? Installing cavity wall or solid wall insulation and/or loft insulation Installing renewable energy systems, such as wind turbines, solar photovoltaic, solar water and space heating, heat pumps (ground, air and water source), small scale hydro and wood fuelled boiler systems Replacing old, inefficient boilers with an Energy Saving Trust Recommended (ESTR) boiler The energy efficiency or renewable measure funded by the loan must be recommended in one of the following documents: Energy Performance Certificate (within the home report completed when buying, renting or selling a home) Home energy report for energy efficiency measures only (produced on completion of an Energy Saving Trust Home Energy Check (HEC) Home Energy Generation report (completed via a phone survey carried out by an Energy Saving Scotland home renewables advisor ) Home report on renewables and energy efficiency ( completed via a home visit from an Energy Saving Scotland home renewables advisor), or Energy Assistance Package (EAP) Stage Four managing agent letter detailing the work recommended. You can find out more about all these documents and ho
amber sanpedro

Home loans scheme - 0 views

  •  
    If you live in a Universal Home Insulation Scheme (UHIS) area in Scotland you could benefit from an interest free loan of up to £10,000. To find out if you live in a UHIS area please contact your local Energy Saving Scotland advice centre on 0800 512 012 What's on offer? Loans of between £500 and £10,000 are available (please note: loans are only available up to a maximum of £4,000 for solar photovoltaic (PV), wind turbines and small scale hydro technologies Loans are interest free so you only pay back what you borrow Applicants can pay back the loan in monthly instalments over a maximum of eight years. Loans can be combined with funding from fuel suppliers under the Carbon Emission Reduction Target. Loans cannot be combined with an Energy Saving Scotland Boiler Scrappage Scheme voucher. What can I use the loan for? Installing cavity wall or solid wall insulation and/or loft insulation Installing renewable energy systems, such as wind turbines, solar photovoltaic, solar water and space heating, heat pumps (ground, air and water source), small scale hydro and wood fuelled boiler systems Replacing old, inefficient boilers with an Energy Saving Trust Recommended (ESTR) boiler The energy efficiency or renewable measure funded by the loan must be recommended in one of the following documents: Energy Performance Certificate (within the home report completed when buying, renting or selling a home) Home energy report for energy efficiency measures only (produced on completion of an Energy Saving Trust Home Energy Check (HEC) Home Energy Generation report (completed via a phone survey carried out by an Energy Saving Scotland home renewables advisor ) Home report on renewables and energy efficiency ( completed via a home visit from an Energy Saving Scotland home renewables advisor), or Energy Assistance Package (EAP) Stage Four managing agent letter detailing the work recommended. You can find out more about all these documents and how to get th
Bethany Rawlins

Springhill Group | springhillgroupbyrichparker.blogspot.com - 0 views

Repost From : http://springhillgroupbyrichparker.blogspot.com/ BLOGSPOT: Police Reports for Feb. 26, 2012 - The Bozeman Daily Chronicle: Police Reports http://springcaregroup.blogspot.com/2012/...

springhill group leaders south korea Fulton Steam And Thermal Fluid Boilers

started by Bethany Rawlins on 21 Mar 12 no follow-up yet
Bethany Rawlins

New boiler technology promises cleaner energy - 1 views

I recommend my all fellows to read this great and informative post.Keep it up!

recent news springhill korean group korea times of fraud editorial articles

Bethany Rawlins

Springhill Group Home : Heating Systems Explained - 1 views

  •  
    Heating Systems ExplainedGas Heating SystemsModern gas central heating systems are safe, controllable and efficient to run but can cause confusion as they have a number of controls that you may not fully understand.Using heating controls properly can:-Improve the comfort of your homeReduce the energy used and your fuel billsAvoid the risk of condensation dampnessTo get the best out of your system, you should follow the manufacturers instructions. If you have mislaid the instruction booklet for your systems, most manufacturers can provide a replacement.Why have controls on a gas central heating system?line-height: 1.6em; margin-right: 10px; color: rgb(0, 0, 0);
yelpeliterevie00

Buy Facebook Ads Accounts - 0 views

  •  
    100% Safe & Secure Service High-Quality Elite & Regular Profiles 2012-2022 Elite Program Profiles Regular Profiles are Minimum 1 Years of Aged Real and Active Elite Profiles 30 Days Unlimited Replacement Surety of Money Back Guarantee First Review Will be Post Within 1/2 Hours 24×7 customer Support
1 - 17 of 17
Showing 20 items per page