Report: Peaches in Los Angeles-area found with radiation at more than double site backg... - 0 views

  • Radiation Station Stats, EnviroReporter, July 8, 2011: 10:05 pm 10-minute INTERIOR average: 39.9 CPM 9:50 pm 10-minute EXTERIOR average: 45.6 CPM NORMAL 4:00 pm INTERIOR spot reading in Santa Monica market with approximate background of 39 CPM – Two peaches sustained 81 CPM and above or over two times background (208% of site background). 3:40 pm 10-minute INTERIOR average: 39.6 CPM 3:25 pm 10-minute EXTERIOR average: 47.0 CPM 1:05 pm 10-minute INTERIOR average: 39.6 CPM 12:45 pm 10-minute EXTERIOR average: 45.8 CPM [...] h/t ChasAha via Two Peaches in Greater Los Angeles found high in radiation
D'coda Dcoda

All 10 children tested in large city 60 km from Fukushima meltdown have radioactive uri... - 0 views

  • Radioactive substances detected in children’s urine in Fukushima, DPA, June 30, 2011:
  • A small amount of radioactive substances was found from urine samples of all of 10 children in Fukushima surveyed [...] David Boilley, president of the Acro radioactivity measuring body, told a news conference in Tokyo that the survey on 10 boys and girls aged between 6 and 16 in Fukushima city suggested there was a high possibility that children in and near the city had been exposed to radiation internally, Kyodo News reported. [...] The city is located 60 kilometres north-west of the Fukushima Daiichi nuclear power station [...]
D'coda Dcoda

Entire area of major city 60km from Fukushima meltdown to be decontaminated - Officials... - 0 views

  • Entire area of major city 60km from Fukushima meltdown to be decontaminated — Officials expect process may take 20 years
  • Fukushima to decontaminate entire city, Yomiuri Shimbun, July 14, 2011
  • he Fukushima municipal government likely will decontaminate the city’s entire area in response to the ongoing crisis at the Fukushima No. 1 nuclear power plant, according to city government sources. [...] Fear of radioactive contamination is widespread among the city’s residents as radiation levels in some areas of the city have been confirmed as higher than those within the 20-kilometer-radius no-entry zone surrounding the nuclear power plant. [...] The city government expects it will take at least several years–and possibly close to 20–to decontaminate the whole city. [...] Wikipedia: As of 2003, the city has an estimated population of 290,866 [...] Fukushima City is about 63 kilometres (39 miles) north-west of Fukushima I Nuclear Power Plant.
Dan R.D.

No Meltdowns or Bombs with Thorium Electrical Power Generation [09Jul11] - 0 views

  • After Fukushima, the Chinese governement have decided to finance the development of the much safer Thorium Fuelled Molten Salt Reactor - this way of producing energy is far safer than Pressure Water Reactor - it does not need pressure and there is no meltdown possibility at all. Further Thorium reactors cannot be used to make nuclear bombs.
  • Thorium is as common as lead, and should have been chosen after the war.At the end of the 2nd World War war plutonium was needed to make nuclear bombs, and this was the main reason for taking the PWR route, because Thorium reactors cannot. Edward Teller - the designer of the atomic bomb - on his death bed - said that a Thorium Fuelled Molten Salt Reactor was a safer design and that the basic Thorium fuel more available than Uranium. He was working on a paper for this type of reactor at his death (see below).
  • It would cost about 1 billion to design a Thorium reactor (Twitter is valued at 7 billion).
Dan R.D.

Renewable energy tops nuclear power in the US [09Jul11] - 0 views

  • A report produced on behalf of Bloomberg says that investments in renewable energy have gone up by roughly a third over the last year, to $211 billion. Led by China's renewable push, the world is now on a trajectory that will see its investments in renewable electricity surpass those in fossil fuels within a year or two. As a result of these investments, the US is now producing more renewable energy than nuclear power.
  • Any way you look at things, the numbers make it clear just how significant renewables have become. Excluding hydropower, renewables made up about 35 percent of the power capacity added worldwide last year, and produced over five percent of the total power. Investments directed toward this new capacity (excluding things like mergers) hit $187 billion, and are closing in fast on the spending on fossil fuel power plants, cutting the gap in spending to $31 billion, down from $74 billion. At that pace, we'll be investing more in renewables either this year or next.
  • Part of the reason is cost. Although wind turbines are very mature technology now, their cost per MW still fell by 18 percent over the last two years; photovoltaics have dropped a staggering 60 percent in that time.
  • ...4 more annotations...
  • That will be a major transition, but another one took place already this past year: more financing went to utility-scale projects in the developing economies than in the industrialized ones. That change is driven by China, where investments were up by about 30 percent, reaching $49 billion.
  • The US, despite seeing a jump of 60 percent, still trailed far behind, with only about $25 billion in these investments.
  • Renewables are also becoming a major factor outside of the BrIC countries (Brazil, India, China). Latin American investments tripled to clear $6 billion, and other Asian nations saw 30 percent growth to $4 billion. But the big story is Africa, led by Egypt and Kenya, where investments were up nearly five-fold, reaching $3.6 billion.
  • Electricity generated by nuclear plants has held steady at about 8,400 quadrillion BTUs for the last several years, while renewables have experienced strong growth, reaching just over 8,000 Quads last year.
Dan R.D.

Lessons Learned from Fukushima - the Corporate [01Jul11] - 0 views

  •      Crisis Communication
  • TEPCO seemed to have been surprised by the international attention paid to the events going on at Fukushima. In the early days, their press releases and press conferences were too infrequent and did not provide enough information. The lack of transparency drove a significant amount of speculation and fueled many rumors that are still reverberating in the media. Given the similar issues seen by BP in the aftermath of the Gulf spill, it was disappointing that TEPCO did not have a stronger crisis communication plan in place.
  • I do not see US utilities managing this any better. Utilities still seem to loathe talking to journalists or providing them with access and information to help educate them PRIOR to an event.
  • ...4 more annotations...
  • 2)   Risk Management
  • It was clear that both BP and TEPCO failed to consider risk adequately. This issue is a tough one for public companies to manage. In many ways, they are driven by the need to be immediately responsive to the stockholder. Thus, understanding and responding to longer term risks is harder to justify.
  • 3)   Emergency Response Training
  • 4)   Know when to ask for help
Dan R.D.

Power Generation from Renewables Surpasses Nuclear [08Jul11] - 0 views

shared by Dan R.D. on 10 Jul 11 - No Cached
  • The latest issue of the Monthly Energy Review published by the US Energy Information Administration, electric power generation from renewable sources has surpassed production from nuclear sources, and is now "closing in on oil," says Ken Bossong Executive Director of the Sun Day Campaign.
  • In the first quarter of 2011 renewable energy sources accounted for 11.73 percent of US domestic energy production. Renewable sources include solar, wind, geothermal, hydro, biomass/biofuel. As of the first quarter of 2011, energy production from these sources was 5.65 percent more than production from nuclear.
  • As Bossing further explains from the report, renewable sources are closing the gap with generation from oil-fired sources, with renewable source equal to 77.15 percent of total oil based generation.
  • ...2 more annotations...
  • For all sectors, including transportation, thermal, and electrical generation, renewable energy production grew just over 15 percent in the first quarter of 2011 compared to the first quarter of 2010, and fully 25 percent over first quarter 2009. In a break-down of renewable sources, biomass/biofuel accounted for a bit more than 48 percent, hydro for 35.41 percent, wind for nearly 13 percent, geothermal 2.45 percent, and solar at 1.16 percent.
  • Looking at just the electrical generation sector, renewable sources, including hydro, accounted for nearly 13 percent of net US electrical generation in the first quarter of 2011, up from 10.31 percent for the same quarter last year. Non-hydro renewable sources accounted for 4.74 percent of net US production.
Dan R.D.

Carnival of Nuclear Energy 60 [09Jul11] - 0 views

  • There are plans for eight more AP1000 reactors – four in Florida, two in North Carolina, and two in South Carolina. The next two AP1000s likely to be built are to be located near Miami at the Turkey Point power station operated by Florida Power & Light. The approval of the AP1000 design is turning into a high stakes outcome with much of the future of nuclear reactor construction in the U.S. over the next two decades riding on it. No other reactor vendor comes close.
  • UK continues on path to rebuilding a complete new sets of reactors. The Finnish government said that it has sent bid documents to Areva and Toshiba for responses to build a new nuclear power station. The new plant will need to generate up to 1,700 MW and be ready to produce power by 2020 at a cost of $6-9 billion
  • U.S. Nuclear Regulatory Commission has granted 20-year license renewals to the two reactors in Salem County, New Jersey. The two pressurized water reactors have been operating since 1977 and 1981 and generate just over 1,100 MW each.
  • ...2 more annotations...
  • NuScale has been recalling some laid off employees. They have obtained “bridge funding” from an undisclosed investor group, allowing the firm to restore about 20 positions. They are trying to make a 45-MW plant which would cost a utility about $180 million.
  • Nextigfuture - Germany is set to turn back to coal, gas and imports to fill the energy chasm left by its fast-track exit of nuclear power. Germany produced 140.6 terawatt hours (TWh) of nuclear power in 2010. Germany produced 102 TWh from renewable energy in 2010, and they are targeted to add 115 TWh by 2020. Even 9 years from now Germany will still not have replaced all nuclear power with renewables. Some Uranium projects in Ukraine and Kazakhstan. The French Astrid breeder reactor.
Dan R.D.

Lessons Learned from Fukushima Part 3 - Political [08Jul11] - 0 views

  • There are several interactions to look at between corporations, regulators, and governments, nationally as well as globally. Like the technical and the corporate lessons learned, more lessons will be learned as time goes on and more information comes to light.
  • There are several interactions to look at between corporations, regulators, and governments, nationally as well as globally. Like the technical and the corporate lessons learned, more lessons will be learned as time goes on and more information comes to light.
  • NISA independence and oversight
  • ...8 more annotations...
  • Much has been made of the apparent cozy relationship of TEPCO and NISA. There are clear indications that TEPCO as the largest nuclear utility in Japan had far too much influence on NISA, including some preferred hiring practices. Every country should look closely at the relations between the regulated and the regulator in every industry that has such oversight.
  • Political Interference – domestic
  • There have been reports that Prime Minister Kan of Japan was too involved in the response to the Fukushima incident. We’ve heard that he tried to prevent seawater injection and his desire to fly over the site delayed some of the vital activities. In addition, it appears that he bypassed some of the pre-planned emergency response systems that would have assured more balanced expert advice.
  • Political Interference – International
  • One of the most egregious examples of political grandstanding was NRC Chairman Jaczko’s presentation before Congress on March 16th. He declared that the unit 4 pool was dry and likely on fire and recommended a 50 mile evacuation zone for US citizens. The Japanese government vehemently denied the allegation and was ultimately proven correct.
  • International Emergency Response
  • IAEA was quick to send people to at least provide some independent international oversight of the risk to the population and the workers on the plant site. The NRC, EPRI, and other agencies also sent personnel with expertise on these plants to provide high level advice and suggestions. Those personnel were used by the Japanese and continue to provide support.
  • Suggestions have been floated to create an international “strike team” that would be available at a moment’s notice to fly to any plant that is in trouble.
D'coda Dcoda

Update: 3200 Becquerels/Kg Cesiuim Detected from Beef from Minami-Soma City in Fukushim... - 0 views

  • These cattle were allowed to be sold, as long as they were scrubbed clean of radioactive materials on their skin, thanks to the Ministry of Agriculture, Forestry and Fisheries, the same ministry that is pushing to have the Japanese cuisine recognized as UNESCO's "world intangible cultural heritage".According to Asahi Shinbun (link below), the Tokyo Metropolitan government tested the remaining 10 meat cows from Minami-Soma City that were processed on July 8. The highest number was 3200 becquerels/kg of cesium, and even the lowest number was 1530 becquerels/kg, more than 3 times the government's provisional safety limit for cesium in foods.The one that was tested on July 8 had 2300 becquerels/kg radioactive cesium.
  • Following the instruction from the Ministry of Agriculture, Forestry and Fisheries, the Metropolitan Shibaura Slaughterhouse doesn't conduct radiation testing at all, whether the cattle come from the 20-30 kilometer radius from Fukushima I Nuke Plant or from other areas. However, there have been 5 instances where the Ministry of Health, Labor and Welfare instructed them to test for radiation, and in those instances the radioactive materials detected were less than the provisional limit.Yomiuri Shinbun (7/9/2011) says something more disturbing:
  • According to the investigation by Fukushima Prefecture, 2924 meat cows have been shipped from the same area since the end of April.
  • ...1 more annotation...
  • At the end of April, the Ministry of Agriculture, Forestry and Fisheries issued its guidance that would allow the shipment of meat cows from this area as long as Fukushima Prefecture conducted the radiation testing on the body surface of the cows and took other measures [i.e. questionnaires]. Accordingly, the shipment resumed which had been halted after the Fukushima I Nuke Plant accident.I sort of know what will be coming shortly: a noise from the government's Nuclear Safety Commission that the current provisional safety limit is too strict, and there won't be anything that can be sold if the limit remains 500 becquerels/kg for cesium...Many cows from Fukushima have been "evacuated" from Fukushima Prefecture, with only surface radiation testing and information on how they were raised, even to far-away places like Miyazaki Prefecture in Kyushu.
D'coda Dcoda

#Fukushima I Nuke Plant Reactor 3: Humans Entered Reactor Bldg and Did What Bots Coulnd... - 0 views

  • 6 TEPCO employees and 4 TEPCO affiliate company employees went to the reactor building of the Reactor 3 on July 8 afternoon. 2 TEPCO employees entered the building, measured the radiation at the location where the nitrogen injection hose would be installed (55 millisieverts/hour), and put a temporary coupler on the metal pipe that would be used for nitrogen injection.For that 9-minute job, they received 5.34 millisieverts radiation.Here's TEPCO's handout for the press on July 9. The English explanation reads like a Google translation (maybe it is) but you get the idea. (I looked at the Japanese handout.)
  • TEPCO seems to be in a great hurry to start the nitrogen injection into the Containment Vessel of the Reactor 3. At first I thought it was just a window-dressing effort for the national government who had decided, on some inexplicable reason or unreason, it would be safe enough for people to come back to their homes in the planned evacuation zone as long as the nitrogen gas was pumped into the Reactor 3 Containment Vessel, just so that the government could tell the citizens "See what we've done for you? It's now so much safer you can go back!"Or, the Reactor 3 is actually in danger of blowing up in a hydrogen explosion.They have hardly done any work on other reactors. The Reactor 1's basement water, last seen as gushing out 4 sieverts/hour steam through to the 1st floor, hasn't been touched. That water doesn't even go to the water treatment system. I haven't heard any news of TEPCO sampling the water for analysis. There's hardly any news on the Reactor 2, after they opened the double door and supposedly drove out the radioactive materials and moisture inside. They still don't know the water level (if any) inside the Reactor 2's Pressure Vessel, because the pressure gauge and water gauge don't work. As for the Reactor 4, they've been injecting water into the Reactor well and the equipment pool from the bottom of the Reactor Pressure Vessel, which seems peculiar. Other than that, and the photo of a hot-spring-like Spent Fuel Pool on the 5th floor, there's not much information coming out.
  •  
    see article for amount of radiation they received
D'coda Dcoda

TEPCO - Melted Core Removal May Start in 10 Years - 0 views

  • A roadmap toward decommissioning of the damaged Fukushima Daiichi nuclear power plant indicates that the removal of melted nuclear fuel rods at the plant may begin in 10 years. NHK has obtained the mid- and long-term roadmap which was presented when officials from the operator of the Fukushima plant, government officials in charge of nuclear safety, and manufacturers of nuclear reactors met last week. The draft roadmap drawn up by the government's Nuclear Safety Commission and Tokyo Electric Power Company says they tentatively set a target date to begin removing fuel rods that melted and fell to the bottom of the reactor. The work is considered to be the most important phase in the decommissioning process. The roadmap indicates that removal will start in 2021 if technology essential for the work has been developed before that. The timeline is believed to have been set based on measures taken following the 1979 Three Mile Island accident in the United States. But unlike the US case, as reactor containment vessels were damaged at the Fukushima complex, they need to be fixed and filled with water. The roadmap shows that reactor buildings could be finally demolished and cleared away after the removal of melted fuel rods is completed, and that it will possibly take dozens of years.
D'coda Dcoda

Millions of jellyfish invade nuclear reactors in Japan and Israel (PHOTOS [09Jul11] - 0 views

  • A nuclear reactor in Japan was forced to shut down due to infiltration of enormous swarms of jellyfish near the power plant. A similar incident was also reported recently in Israel when millions of jellyfish clogged down the sea-water cooling system of the power plant. Such massive invasions of the species have raised speculations and scientists are trying to figure out the reason behind such unusual growing trends. "The several [power plant incidents] that happened recently aren't enough to indicate a global pattern. They certainly could be coincidental," LiveScience quoted Monty Graham, a jellyfish biologist and senior marine scientist at the Dauphin Island Sea Lab off the Gulf Coast of Alabama stating. Recent studies have found out that jellyfish blooming occurs mostly during the summer and spring months. Check some amazing visuals of jellyfish infiltrations below:
D'coda Dcoda

American Energy Fields - Three Projects in Early Stage Uranium Exploration [08Jul11] - 0 views

  • American Energy Fields, Inc. (OTCBB:AEFI), formerly Sienna Resources, Inc. is a uranium exploration and development company based in Arizona. Their focus is uranium deposits in the United States. The Company’s three main projects (in which they have sole interest) are  the Coso and Blythe  projects in California, and Artillery Peak project in Arizona. All three properties have been previously explored and developed, and are currently in early exploration stages.  A 43-101 technical report for the Artillery Peak project is available for review on American Energy Field’s website. What we like about American Energy Fields, Inc: Over 9.2 million pounds U3O8 historic resources with 2.8 million pounds 43-101 verified More than $25 million in development work, by past operators, has been spent on AEFI’s current projects Committed to near term production of low cost U.S. Uranium
  • The Artillery Peak property consists of 1,777 acres of federal land and is located 112 miles northeast of Phoenix, Arizona. American Energy Fields’ historic records indicate 1.7 million pounds of uranium was previously identified through exploration on Artillery Peak. There has been significant exploration work completed on the property, including over 400 holes drilled by Jacquays Mining, Homestake Mining, Hecla Mining, Getty Oil, Public Service Company of Oklahoma, and Santa Fe Mining between the 1950s-1970s. A 1979 report by Central and South West Fuels, Inc. found that the northern portion of the property contains a historical resource of 1.7 million pounds U3O8 with an average grade of 0.113%. In 2007/2008 new exploration was conducted which included 34 additional drill holes to verify historic drilling and further delineate mineralization. In 1979, the Department of Energy conducted an evaluation of the Date Creek Basin and the Artillery Mountains where they estimated that the area could contain as much as 1,260,000,000 pounds of U3O8. The Company will begin a preliminary exploration program to verify the historic data reported by Central and South West Fuels Inc.
  • Coso – Inyo County – California The Coso project covers 169 federal mining claims and 800 state-owned acres and was previously developed by Western Nuclear, Pioneer Resources, Federal Resources, and Union Pacific Mining/Rocky Mountain Energy. An estimated U.S. $20,000,000.00 was spent on exploration and development of the project, including an engineered pit design, where exploration records indicate 5.5 million lbs. of uranium was identified with an average grade of 0.07 U3O8. American Energy Fields recently received its exploration permit for the 800 state-owned acres from the California Land Department and is currently developing an exploration plan to confirm the historic data with the goal of moving the project towards production. Blythe – Riverside County – California The Blythe project consists of 66 Federal mining claims in Riverside County, California covering 3 historic mines, the Safranek, the McCoy Wash, and the Little Ore Hill operated by Humbug Mining and Bokum Corporation. According to Bokum’s records during the years of 1963 to 1964, the Safranek Mine produced and shipped 1,400 tons of uranium ore averaging 0.80% U308 to the VCA mill in Salt Lake City, Utah for processing. These records also indicate the Safranek site currently contains 100 tons at 0.40% U3O8 and 4,000 tons at 0.30% U3O8 of stockpiled ore, while the McCoy Wash has 3,000 tons of stockpiled ore with a grade of 0.20% U3O8. Bokum Corporation drilled the property in the early 1970s and the results indicated approximately 153,000 lbs of U3O8 while outlining a further potential for an additional 2,000,000 lbs of U3O8. American Energy Fields aims to identify, expand, and develop the ore body with the goal of putting the past producing mines back into production. Management
D'coda Dcoda

Bundesrat Approves Most of Nuclear Power Exit Energy Package [08Jul11] - 0 views

  • The nuclear phase-out until 2022, which the government proposed in the wake of the Fukushima nuclear accident, and the accelerated transition into an age of renewable energy supply can almost go ahead as planned. The Bundesrat (Federal Council)  followed the Bundestag’s (Federal Parliament’s) vote of 1 July 2011 and approved the energy legislative package in its last session before the summer break. However, the Energy-Efficient Renovations of Residential Buildings Act was rejected. Hence, the laws below can enter into force after having been signed by the Federal President Christian Wulff and following promulgation in the Federal Law Gazette: 13th amendment of the Atomic Energy Act (AtG) – the actual nuclear energy exit law; Act Amending the Legal Framework for the Promotion of the Electricity Generation from Renewable Energy Sources (Gesetz zur Neuregelung des Rechtsrahmens für die Förderung der Stromerzeugung aus erneuerbaren Energien), which most importantly contains amendments of the Renewable Energy Sources Act (EEG) in Article 1; Act Amending Energy Law related Provisions (Gesetz zur Neuregelung energiewirtschaftsrechtlicher Vorschriften), most importantly of the German Energy Act (EnWG); Act on Measures Accelerating the Expansion of the Electricity Grids (Gesetz über Maßnahmen zur Beschleunigung des Netzausbaus Elektrizitätsnetze), which most importantly includes a new Grid Expansion Acceleration Act (NABEG) in Article 1, but also amends other laws; Act Amending the Energy and Climate Fund Act (Gesetz zur Änderung des Gesetzes zur Errichtung eines Sondervermögens “Energie- und Klimafonds – EKFG -ÄndG); Act Strenghtening Climate-Friendly Measures in Towns and Municipalities (Gesetz zur Stärkung der klimagerechten Entwicklung in den Städten und Gemeinden); First Act Amending Shipping Laws (Erstes Gesetz zur Änderung schifffahrtsrechtlicher Vorschriften). Approval by the Bundesrat, the legislative body that represents the federal states, had been uncertain for many of the bills contained in the package. The CDU/CSU/FDP coalition government does not hold a majority in the Bundesrat. While support for the amendment of the Atomic Energy Act (AtG) in the Bundesrat could be expected after the clear majority that the bill received in the Bundestag’s vote, this was not the case for many the other bills. To be able to decide before the summer break, the Bundesrat had shortened the consultation period for the bills. Still the expert committees of the Bundesrat prepared numerous recommendations to amend the bills.
D'coda Dcoda

France Commits to Nuclear Future [07Jul11] - 0 views

  • As a long time proponent of nuclear power, last week France announced that it will invest $1.4 billion in its nuclear energy program, diverging from contentious deliberation from neighboring states on nuclear energy policy after the earthquake and tsunami in Japan that damaged the Fukushima Daiichi plant in March. The President of France, Nicholas Sarkozy, issued a strong commitment announcing the energy funding package by declaring there is “no alternative to nuclear energy today.” With the capital used to fund fourth generation nuclear power plant technology, focusing research development in nuclear safety, the announcement validates many decades of energy infrastructure and legacy expansion. France currently operates the second largest nuclear fleet in the world with 58 reactors, responsible for supplying more than 74 percent of domestic electricity demand supplied to the world’s fifth largest economy last year. At the end of last month, French uranium producer, Areva Group (EPA:AREVA), and Katko announced plans to increase production to 4,000 tonnes of uranium next year.  Katco is a joint venture for Areva, the world’s largest builder of nuclear power plants, and Kazatomprom the national operator for uranium prospecting, exploration and production for Kazakhstan.
  • German closure The pronouncement to maintain the nuclear prominence in France provides a strong counterweight to other countries in the region. Germany recently announced the phased shutdown of its 17 nuclear power stations by 2022.  Last week, Germany’s federal parliament voted overwhelmingly to close its remaining nine active plants according to a preset 11 year schedule. A Federal Network Agency, which oversees German energy markets, will decide by the end of September whether one of the eight nuclear plants already closed in recent months should be kept ready on a “cold reserve” basis, to facilitate the transition for national energy supply. The German commitment to an energy policy transition indicates that the national power mix towards renewable sources will have to double from its present range of 17 percent to an ambitious 35 percent. Subsidies for hydro electric and geothermal energy will increase; however, financial support for biomass, solar, and wind energy will be reduced. German Chancellor Angela Merkel has said she would prefer for utility suppliers not to make up any electrical shortfalls after 2022 by obtaining nuclear power from neighboring countries like France. Germany will require an expansive supergrid to effectively distribute electricity from the north to growing industrial urban centers like Munich, in the south. In order to execute this plan the new laws call for the addition of some 3,600 kilometers of high capacity power lines. Germany’s strategy will partially include the expansion of wind turbines on the North Sea, enabling some 25,000 megawatts’ worth of new offshore wind power which will have to be developed by 2030. Nuclear persistence in the United Kingdom Last month, the government in the United Kingdom maintained its strong commitment to nuclear energy, confirming a series of potential locations for new nuclear builds.  The national policy statements on energy said renewables, nuclear and fossil fuels with carbon capture and storage “all have a part to play in delivering the United Kingdom’s decarbonisation objectives,” and confirmed eight sites around the country as suitable for building new nuclear stations by 2025. The statements, which are to be debated in Parliament, include a commitment for an additional 33,000 megawatts of renewable energy capacity, while the government said more than $160 billion will be required to replace around 25 percent of the country’s generating capacity, due to close by 2020. The Scottish government has also softened its tough opposition to nuclear power, following recognition by the energy minister of a “rational case” to extend operations at Scotland’s two nuclear plants. Additional Eurozone participation In June, Italian voters rejected a government proposal to reintroduce nuclear power. The plan by Prime Minister Silvio Berlusconi to restart Italy’s nuclear energy program abandoned during the 1980s, was rejected by 94 percent of voters in the referendum. Another regional stakeholder, the Swiss government has decided not to replace the four nuclear power plants that supply about 40 percent of the country’s electricity. The last of Switzerland’s power nuclear plants is expected to end production by 2034, leaving time for the country to develop alternative power sources. Although the country is home to the oldest nuclear reactor presently in operation, the Swiss Energy Foundation has stated an objective to work for “an ecological, equitable and sustainable energy policy”. Its “2000 watt society” promotes energy solutions which employ renewable energy resources other than fossil fuels or nuclear power.
D'coda Dcoda

Nuclear Twilight in Europe [07Jul11] - 0 views

  • The triple whammy against nuclear power beginning with the 1979 partial meltdown at Three Mile Island, followed by 1986′s Chernobyl  disaster and now Fukushima, effectively present a “three strikes and you’re out” call against civilian nuclear energy power generation for the foreseeable future.That said, with the trillions of dollars already invested in 436 nuclear power plants (NNP) worldwide, according to the International Atomic energy Agency (IAEA),  the industry has begun to push back, and “ground zero” is emerging as Europe, not Japan, with the lawyers circling.
  • In the wake of Fukushima, German Chancellor Angela Merkel announced on 30 May that Germany, the world’s fourth-largest economy and Europe’s biggest, would shut down all of its 17 would abandon nuclear energy completely between 2015 and 2022, an extraordinary commitment, given that Germany’s 17 NPPS Germany produce about 28 percent of the country’s electricity.If Berlin’s announcement sent nuclear power proponents seating, worse was to follow, as Switzerland is examining a proposal to phase out the country’s five nuclear plants by 2034.Finally, if any doubts existed about Europe’s commitment of nuclear energy, on 12-13 June in a referendum in which 56 percent of Italian voters participated, an eye-watering 94 percent voted against nuclear power.  Following the 1987 Chernobyl disaster, Italy decided to shut down its four NPPs and the last operating plant closed in 1990. Three years ago Prime Minister Silvio Berlusconi reversed this decision but after Fukushima Berlusconi announced a one-year moratorium on his plans for new nuclear power plants, intending to restart Italy’s nuclear energy program in 2014. Berlusconi spent the days leading up to the polls challenging the nuclear power measure in court, declaring he wouldn’t vote and suggesting his fellow Italians stay at home too. They didn’t, and Berlusconi’s electoral defeat has ended nuclear possibilities for Italy for the foreseeable future. In 2010, 22.2 percent of Italy’s power came from renewable energy sources. 64.8 percent were from fossil fuels, and 13 percent were imported sources, including French nuclear power. The stinging defeat at the polls is a boon for Italy’s nascent renewable energy industry.
  • The German nuclear industry has begun to fight back, insisting that its shutdown would cause major damage to the country’s industrial base. Utilities E.ON AG and Vattenfall Europe AG have already announced that they will seek billions of euros in compensation, and RWE AG and EnBW Energie Baden-Wuerttemberg AG are expected to follow soon. Germany’s four nuclear operators have already announced they will stop paying into a government renewables fund, which was set up in September 2010 as compensation for longer nuclear life-spans.In such an environment, the only nuclear energy growth field currently is lawyers’ fees.
D'coda Dcoda

Sun and wind as alternative to nuclear energy : Voice of Russia [04Jul11] - 0 views

  • Scared by the nuclear disaster at the Japanese Fukushima-1 Nuclear power plant, Germany, Italy and Switzerland have decided to abandon nuclear energy towards alternative sources of energy. How safe are these alternatives?  Today ecologists and scientists are trying to answer this question.Nature protection activists call alternative sources of energy “green” sources. However after a more detailed study these sources can hardly be regarded as “environmentally friendly”. Silicon solar arrays Europeans want to see on the roofs of their houses turn to be unsafe right at the stage of their production. The production of one ton of photo elements leads to the emission up to 4 tons of silicon tetrachloride, a highly toxic substance, which combinations may cause different diseases. Besides poisonous gallium, lead and arsenic the photo elements also contain cadmium. If cadmium enters a human body it can cause tumors and affect the nervous system.
  • As for wind turbines, their noise is dangerous for health and it is impossible to recycle the worn blades. Though green energy sources are not completely safe it is the question of choosing the lesser of two evils, Igor Shkradyuk, the coordinator of the program on the greening of industrial activities at the Center of Wild Life Protection, says."Absolutely environmentally clean energy does not exist.  All its types have stronger of weaker impact on the environment. A solar battery requires a huge amount of unhealthy silicon. Engineers hope that silicon-free materials for solar batteries will be produced in 10-20 years. The solar battery, if you don’t break it, of course, poses no danger. As for wind turbines, the first one was put into operation in mid 1970-s in Germany. But the residents complained about its strong vibration and noise and a local court ruled to stop it. Since then many things have changed and modern powerful wind turbines are unheard already at a distance of 200 meters. But they are the main source of danger for migrating birds which are almost asleep as they fly to their wintering grounds and back."
  • Vladimir Chuprov, the head of the energy department of Russia’s Greenpeace agrees that all sources of energy cause environmental damage.  But the alternative sources have advantages anyway, he says."Of course, we are negative towards any pollution and here the problem of choice comes up. For example, silicon production requires chlorine which is hazardous. But now the gradual transition to chorine-free methods of silicon production has already begun.  Besides that we see the gradual transition to thin-film photoconverters in particular arsenic based converters. And after all, nobody says that solar batteries will be thrown to a dump site. It is necessary to ensure their proper utilization." 
  • ...1 more annotation...
  • The nuclear energy industry also faces serious upgrading. Russia has the project of constructing a nuclear power plant certified by the EU. This project takes into account all the tragic lessons of Fukushima. In particular such a plant will be capable to withstand the crash of an aircraft.Another problem of choice is the price. The energy from solar batteries and wind turbines is 2-5 times more expensive than that from nuclear energy. And while Germany is rejecting the use nuclear energy, France is proposing it to export its electricity produced by the French nuclear plants and China is ready to employ German experts in nuclear energy.  