Skip to main content

Home/ Open Intelligence / Energy/ Group items tagged unit 4

Rss Feed Group items tagged

D'coda Dcoda

Japan Nuclear Disaster Models From 2002 [26Aug11] - 0 views

  • A Japan Atomic Energy Institute paper from 2002 recently surfaced online. This paper was the technical estimations of what would happen if a nuclear reactor on the Pacific coast of Japan were to have a catastrophic accident. The models included radiation dispersal under a variety of scenarios and also illness and death rates under multiple scenarios. The plant for the experiment is  “1100MWe BWR5 with Mark-II type containment– One of the most common plant type in Japan“. Based on the location on the maps included in the paper the reactor used was either unit 6 at Fukushima Daiichi or one of units 1-4 at Fukushima Daini. The scenario is for one reactor failure, not 3 reactor failures plus spent fuel pools as was experienced at Fukushima Daiichi. Of the included reactor scenarios the one that closest resembles the Fukushima disaster is failure of cooling + overpressure damage. Below are two graphs, one in English, another in Japanese. They show the reactor damage scenarios, distance from the plant and mortality.
  • Some interpretations of the data in this report using the closest to Fukushima Daiichi model available. These do not mean specifically these things will happen, this is what the model shows under the scenario details they used: The model used does not differentiate between a unit 2 style containment failure and a unit 3 or Chernobyl style containment failure. A containment failure can vary greatly in how much of the nuclear fuel is released into the environment. The containment system in the model reactor is newer, technically improved and larger than the containment used in units 1-4 at Fukushima Daiichi. Unit 1 at Fukushima Daiichi has a slightly smaller containment than units 2-4. There have been concerns expressed that the smaller containment had less volume, making it more prone to failure. These slight differences in the reactors would result in changes to the amount of radiation released and would then change all these other outcomes.
  • 20 km away will cause max. 1 out of 500 deaths, an exclusion zone of 100 km will cause max. 1 out of 5000 deaths. The diagram may explain the 20 km exclusion zone. all curves go down beond 20 km away from the plant. Acute deaths = deaths for direct exposure to NPP wave radiaton + explosion deaths. The two sharply-dropping lines on the Japanese chart show acute death. Please make note that at 100 Km. distance values are not 0. Moreover X axis is logarithmic. Tokio-Fuku distance= 230 Km. Our estimate for 230 Km. death rate ~ 10*-4.Tokio Metropolis population 34,500,000 (2007)34500000/10000.  3450 deaths in Tokio only. Again, this is based on this model scenario, not exact situations currently going on. These mortality models include late onset cancers and also survivable cancers based on the details in the report.
  • ...1 more annotation...
  • There’s the MOX factor to consider too, the addition of MOX fuel is not included in the model. MOX fuel in reactor 3 may have played a role in the speed of the meltdown and adds plutonium and related isotopes into the releases different than what would be seen with uranium fuel. The report in English, includes a series of PowerPoint slides at the end. *This report also talks at length about ways radiation is absorbed by people, they may not be included in the Japanese language report.
  •  
    has charts
D'coda Dcoda

Nuclear generation rise in 2010 [15Jun11] - 0 views

  • The total amount of electricity generated by nuclear powers plants around the world increased in 2010 following three consecutive years of decline. However, a sharp drop in output is foreseen for 2011 as a result of the Fukushima accident.    Global nuclear electricity generation in 2010 totalled 2630 TWh, according to figures from the International Atomic Energy Agency (IAEA), representing a 2.8% increase from the 2558 TWh generated in 2009 and taking it close to a peak value in 2006. The energy availability factor of the plants operating in 2010 was 81%, up from 79.4% in 2009.
  • New reactors amounting to 3722 MWe net boosted the 2010 figure, including Russia's Rostov 2, India's Rajasthan 6, China's Ling Ao 3 and Qinshan II-3, and South Korea's Shin Kori 1.   Just one small reactor - France's 130 MWe Phenix prototype fast reactor - was officially shut down in 2010, although the unit actually ceased power generation in 2009.
  • Construction of 16 new reactors, with a combined capacity of 15,846 MWe net, started in 2010, according to the IAEA. Ten of these are in China (Ningde units 3 and 4, Taishan 2, Changjiang 1 and 2, Haiyang 2, Fangchenggang 1 and 2, Yangjiang 3 and Fuqing 3). In Russia, the construction of two new units also began (Leningrad II unit 2 and Rostov 4), while two more started construction in India (Kakrapar 3 and 4). In Brazil, work also started on building the Angra 3 unit. Meanwhile, the stalled construction of Japan's 1383 MWe Ohma unit also got back underway in 2010 after re-engineering work for enhanced earthquake protection.
  • ...4 more annotations...
  • Assuming about five years for construction it can be expected that reactors will be coming online around 2012 at double today's rate of five per year, with this to rise to one per month around 2015.
  • Fukushima impact
  • Despite a return to form for nuclear power in 2010, the impact of the Fukushima accident, not only in Japan but around the world, will significantly reduce the amount of electricity generated by nuclear power plants in 2011.
  • According to data released by the Japan Atomic Industry Forum (JAIF), only 17 of Japan's 54 nuclear power reactors were in operation in mid-May. They represented around 15,500 MWe, or 31%, of the country's total nuclear generating capacity.
D'coda Dcoda

Va. Power hopes to restart reactors soon [08Sep11] - 0 views

  • Dominion Virginia Power thinks it will be ready to restart its North Anna 1 nuclear reactor in two weeks and the North Anna 2 by mid-October, if federal regulators approve. But the Nuclear Regulatory Commission staff members indicated Thursday that making sure the reactors, which were shut down by the Aug. 23 earthquake nearby, are safe to begin operating again might take longer. The staff said at the meeting with utility officials that it had plenty of questions as the agency looks into the Louisa County power station's design to resist seismic damage.
  • Preliminary information from the U.S. Geological Survey indicates that the earthquake produced a shaking force in the region twice as strong as the North Anna plant was designed to handle, the NRC said. Dominion Virginia Power acknowledges that the force from the earthquake exceeded the plant's theoretical design strength. The 5.8-magnitude earthquake caused only minor damage that did not affect nuclear safety, the company said. The quake also caused 25 of the 115-ton steel casks storing highly radioactive used fuel rods to shift as much as 4½ inches out of position on their concrete storage pad.
  • No U.S. nuclear power plant has been tripped off-line by an earthquake before, the NRC said.
  • ...8 more annotations...
  • We don't have a lot of experience in this area," said Eric J. Leeds, director of the NRC's Office of Nuclear Reactor Regulation. "It looks like we'll see a lot of each other over the next few weeks — hopefully not months."
  • Dominion Virginia Power is eager to get the plant, which can generate enough electricity to power 450,000 homes, operating again. The Richmond-based company is the state's largest electric utility, serving 2.3 million customers.
  • Based on results to date, Dominion Virginia Power believes all tests and repairs will be completed on Unit 1 by Sept. 22, said Eugene Grecheck, the company's vice president for nuclear development. Unit 2 is going into a planned refueling outage, and the company hopes it could be restarted by Oct. 13. But, warned Jack Grobe, deputy director of NRC's Office of Nuclear Reactor Regulation, "We're probably going to have to have a series of meetings. I guarantee you're going to get a lot of questions." Among the questions will be the shaking force of the earthquake on the plant.
  • The earthquake appears to have produced a peak acceleration — its shaking force — of about 0.26 g approximately 24 miles from its epicenter, the NRC said. G is the unit of measurement for acceleration based on the force of gravity. North Anna's rock-based structures are designed to withstand 0.12 g. The power station is about 11 miles from the quake's epicenter. The plant experienced earthquake forces an average of 21 percent greater than it was designed for, according to Dominion Virginia Power. The strong motion passed quickly, lasting no more than 3.1 seconds and reducing its impact, the company told NRC officials Thursday.
  • North Anna can handle shaking forces higher than 0.12 g in the critical lower frequencies, Dominion Virginia Power said. Most of the plant's critical safety components can actually resist shaking of 0.3 g, the company said, and relatively less-sturdy structures can withstand 0.16 g. "Consequently, safe shutdown components are capable of surviving seismic accelerations in excess of the … design criteria," Eric Hendrixson, Dominion Virginia Power's director of nuclear engineering, told federal regulators.
  • The NRC began assessing the safety implications of increased plant earthquake hazards in 2005. According to the agency, the potential earthquake hazards for some nuclear power plants in the central and eastern U.S. may be slightly larger than previously estimated.
  • Dominion Virginia Power still does not know exactly what caused the reactors to trip off-line, officials said Thursday. "There were diverse and redundant trips coming in in milliseconds," said N. Larry Lane, Dominion Virginia Power's site vice president for the power station.
  • Knowing precisely what prompted the shutdown is critical for validating the safety of the plant's design.
D'coda Dcoda

95% disagree with "Beyond Nuclear". Let's make it 99% [23Oct11] - 0 views

  • 95% disagree with “Beyond Nuclear”. Let’s make it 99% by Rod Adams on October 14, 2011 in Antinuclear activist , Politics of Nuclear Energy , Unreliables , Wind energy Share0 One of the more powerful concepts that I studied in college was called “groupthink.” The curriculum developers in the history department at the US Naval Academy thought it was important for people in training to become leaders in the US Navy learn to seek counsel and advice from as broad a range of sources as possible. We were taught how to avoid the kind of bad decision making that can result by surrounding oneself with yes-men or fellow travelers. The case study I remember most was the ill fated Bay of Pigs invasion where virtually the entire Kennedy Administration cabinet thought that it would be a cakewalk . If Patricia Miller had bothered to do the fact-checking required by journalistic integrity she would have come across this video showing 30 feet of water above the fuel at Fukushima with all of the fuel bundles exactly where they’re supposed to be. Aside: Don’t we live in an amazing world? I just typed “Bay of Pigs groupthink” into my browser search box and instantly hit on exactly the link I needed to support the statement above. It even cites the book we used when I was a plebe in 1977, more than 33 years ago. End Aside. Not everyone, however, has the benefit of early leadership lessons about the danger of believing that a small group of likeminded people can provide actionable advice. Some of the people who are most likely to be victims of groupthink are those who adamantly oppose the continued safe operation of emission-free nuclear power plants. The writers who exclusively quote members of that tiny community have also fallen into the groupthink trap.   On October 8, 2011, the Berkeley Patch, a New Jersey based journal that regularly posts negative stories about Oyster Creek, featured an article titled Petitioners to NRC: Shut Down All Fukushima-Like Nuclear Plants . Here is a snapshot of the masthead, the headline and the lede. The article is a diatribe that quotes people on the short list of frequently quoted antinuclear activists including Paul Gunter, Michael Mariotte, Kevin Kamps, Deb Katz and Dale Bridenbaugh. The author faithfully reproduces some of their best attempts to spread fear, uncertainty and doubt using untruths about the actual events at Fukushima. For example, the article uses the following example of how antinuclear activists are still trying to spread the myth that the used fuel pools at Fukushima caught fire. Oyster Creek – the oldest nuclear plant in the United States – has generated over 700 tons of high-level radioactive waste, Kevin Kamps of Beyond Nuc
  • Perhaps this October 12, 2011 post titled Oyster Creek Response that was published on Clean Energy Insight has something to do with the way the results are shaping up with 1029 out of 1080 respondents (95.3%) saying that Oyster Creek should not stop operating. Here is one more example of how inbred the group of antinuclear activists has become. I am talking here about the people who are so adamantly opposed to using nuclear energy that they do not even want existing nuclear plants to keep on producing clean, emission free, low cost electricity. Michael Mariotte of NIRS makes the following extraordinary claim: Ninety-five percent of the people in the world know about Fukushima, Michael Mariotte of the Nuclear Information and Resource Service said.
  • On October 8, 2011, the Berkeley Patch, a New Jersey based journal that regularly posts negative stories about Oyster Creek, featured an article titled Petitioners to NRC: Shut Down All Fukushima-Like Nuclear Plants. Here is a snapshot of the masthead, the headline and the lede. The article is a diatribe that quotes people on the short list of frequently quoted antinuclear activists including Paul Gunter, Michael Mariotte, Kevin Kamps, Deb Katz and Dale Bridenbaugh. The author faithfully reproduces some of their best attempts to spread fear, uncertainty and doubt using untruths about the actual events at Fukushima. For example, the article uses the following example of how antinuclear activists are still trying to spread the myth that the used fuel pools at Fukushima caught fire. Oyster Creek – the oldest nuclear plant in the United States – has generated over 700 tons of high-level radioactive waste, Kevin Kamps of Beyond Nuclear said. “Granted that some of that has been moved into dry cast storage, but the pool remains full to its capacity,” Kamps said. “And this was a re-rack capacity. Much later in terms of quantity of high level radioactive waste than it was originally designed for.” This represents 125 million curies of radioactive cesium-137 and the NRC has reported that up to 100 percent of the hazardous material could be released from a pool fire, Kamps said. “I would like to point out that Fukushima Daiichi units one, two, three and four combined in terms of the inventory of high level radioactive waste in their storage pools does not match some of these reactors I mentioned in terms of how much waste is in these pools,” Kamps said. “So the risks are greater here for boil downs and the consequences of a radioactive fire in these pools.”
  • ...5 more annotations...
  • NOTHING happend to the fuel in the pools at Fukushima. I would like to see some evidence other than the word of an activist who frightens kids for a living to support Gunter’s rant about peices of fuel being ejected miles away. From the looks of that video, the fuel didn’t move an inch. There is also a poll associated with the article. The poll discloses that it is completely unscientific, since it allows anyone to vote and is not based on randomly selected participants. However, I think that the results as of 0315 this morning are pretty amusing since the antinuclear opinion piece has been posted for nearly a week.
  • 95% disagree with “Beyond Nuclear”. Let’s make it 99% by Rod Adams on October 14, 2011 in Antinuclear activist, Politics of Nuclear Energy, Unreliables, Wind energy Share0 One of the more powerful concepts that I studied in college was called “groupthink.” The curriculum developers in the history department at the US Naval Academy thought it was important for people in training to become leaders in the US Navy learn to seek counsel and advice from as broad a range of sources as possible. We were taught how to avoid the kind of bad decision making that can result by surrounding oneself with yes-men or fellow travelers. The case study I remember most was the ill fated Bay of Pigs invasion where virtually the entire Kennedy Administration cabinet thought that it would be a cakewalk. If Patricia Miller had bothered to do the fact-checking required by journalistic integrity she would have come across this video showing 30 feet of water above the fuel at Fukushima with all of the fuel bundles exactly where they’re supposed to be.Aside: Don’t we live in an amazing world? I just typed “Bay of Pigs groupthink” into my browser search box and instantly hit on exactly the link I needed to support the statement above. It even cites the book we used when I was a plebe in 1977, more than 33 years ago. End Aside. Not everyone, however, has the benefit of early leadership lessons about the danger of believing that a small group of likeminded people can provide actionable advice. Some of the people who are most likely to be victims of groupthink are those who adamantly oppose the continued safe operation of emission-free nuclear power plants. The writers who exclusively quote members of that tiny community have also fallen into the groupthink trap.  On October 8, 2011, the Berkeley Patch, a New Jersey based journal that regularly posts negative stories about Oyster Creek, featured an article titled Petitioners to NRC: Shut Down All Fukushima-Like Nuclear Plants . Here is a snapshot of the masthead, the headline and the lede. The article is a diatribe that quotes people on the short list of frequently quoted antinuclear activists including Paul Gunter, Michael Mariotte, Kevin Kamps, Deb Katz and Dale Bridenbaugh. The author faithfully reproduces some of their best attempts to spread fear, uncertainty and doubt using untruths about the actual events at Fukushima. For example, the article uses the following example of how antinuclear activists are still trying to spread the myth that the used fuel pools at Fukushima caught fire. Oyster Creek – the oldest nuclear plant in the United States – has generated over 700 tons of high-level radioactive waste, Kevin Kamps of Beyond Nuclear said. “Granted that some of that has been moved into dry cast storage, but the pool remains full to its capacity,” Kamps said. “And this was a re-rack capacity. Much later in terms of quantity of high level radioactive waste than it was originally designed for.” This represents 125 million curies of radioactive cesium-137 and the NRC has reported that up to 100 percent of the hazardous material could be released from a pool fire, Kamps said. “I would like to point out that Fukushima Daiichi units one, two, three and four combined in terms of the inventory of high level radioactive waste in their storage pools does not match some of these reactors I mentioned in terms of how much waste is in these pools,” Kamps said. “So the risks are greater here for boil downs and the consequences of a radioactive fire in these pools.” Fortunately, the people who are not a part of the antinuclear community are finally beginning to recognize their own strength and to realize that they do not have to remain silent while the lies are being spread. Here is how a knowledgable commenter responded to the above segment of the article: If Patricia Miller had bothered to do the fact-checking required by journalistic integrity she would have come across this video showing 30 feet of water above the fuel at Fukushima with all of the fuel bundles exactly where they’re supposed to be.
  • “It took a really extraordinary event for 95 percent of the people in the world to know about it,” he said. “If they know about Fukushima, they know about Mark 1 reactors exploding in the air and releasing toxic radiation across the world and they know that’s not a good thing. Something has to be done to make sure that never happens again.” I could not let that one pass without a comment; I am quite sure that Mariotte has once again fallen victim to the fact that he surrounds himself with people who echo his own prejudices. Here is my response.
  • Marriotte makes an interesting statement by he claiming that “95% of the people in the world” know about Fukushima. That statement might be true about the people in the United States, where advertiser-supported television news programs covered the events with breathless hype for several months. I am pretty sure that you would have a difficult time finding anyone in China, central Africa, the Asian subcontinent, South America or the Middle East who can even pronounce Fukushima, much less know anything about GE Mark 1 containments. Most of them would not even know that they should be worried about radiation because they have never been taught to be afraid of something that they cannot smell, feel, taste, or hear especially when it occurs at levels that have no chance of making them sick within their expected lifetime. Mariotte, Gunter, Kamps, Katz and Bridenbaugh are all members of a vocal, but tiny group of people who have been carrying the water of the fossil fuel industry for decades by opposing nuclear energy, the only real competitor it has. They are victims of groupthink who believe that their neighbors in Takoma Park are representative of the whole world.
  • Just before making this comment, I voted in the unscientific poll associated with the article. 95% say that Oyster Creek should keep on powering New Jersey homes and businesses. They are not impressed by the Beyond Nuclear FUD; they like clean electricity.
D'coda Dcoda

TEPCO : Press Release | Nuclide Analysis Results of Radioactive Materials in Seawater t... - 0 views

  • At around 9:30 am on April 2, 2011, we detected water containing radiation dose over 1,000 mSv/h in the pit* where power supply cables are stored near the intake channel of Unit 2. Furthermore, there was a crack of about 20 cm length on the concrete lateral of the pit, from where the water in the pit was flowing out to the ocean. At around 12:20 pm on April 2, we reaffirmed the event at the scene. We have implemented sampling of the water in the pit of Unit 2, together with the seawater in front of the bar screen near the pit of Unit 2. These samples were sent to Fukushima Daini Nuclear Power Station for analyses. At around 5:38 am on April 6, we observed stoppage of spilling of water to the ocean from the crack on the concrete lateral of the pit.
  • On May 11, 2011, responding to out-flow leakage of contaminated water from the intake canal of Unit 3, from May 12th, we additionally conducted the sampling of the seawater inside and outside of the silt fence in front of the bar screen near the pit of Unit 1, 3 and 4. (Previously announced) On September 22, 2011, we conducted sampling of the seawater near the intake canal of Units 1 to 4 of Fukushima Daiichi Nuclear Power Station and analyzed the samples. As a result, some radioactive materials were detected as described in the appendix. We informed Nuclear and Industrial Safety Agency (NISA) and the government of Fukushima Prefecture of the results above today. We will continue to conduct same kind of samplings. * Pit: vertical shaft made of concrete
D'coda Dcoda

ACPD - Abstract - Xenon-133 and caesium-137 releases into the atmosphere from the Fukus... - 0 views

  • A. Stohl1, P. Seibert2, G. Wotawa3, D. Arnold2,4, J. F. Burkhart1, S. Eckhardt1, C. Tapia5, A. Vargas4, and T. J. Yasunari61NILU – Norwegian Institute for Air Research, Kjeller, Norway2Institute of Meteorology, University of Natural Resources and Life Sciences, Vienna, Austria3Central Institute for Meteorology and Geodynamics, Vienna, Austria4Institute of Energy Technologies (INTE), Technical University of Catalonia (UPC), Barcelona, Spain5Department of Physics and Nucelar Engineering (FEN),Technical University of Catalonia (UPC), Barcelona, Spain6Universities Space Research Association, Goddard Earth Sciences and Technology and Research, Columbia, MD 21044, USAAbstract. On 11 March 2011, an earthquake occurred about 130 km off the Pacific coast of Japan's main island Honshu, followed by a large tsunami. The resulting loss of electric power at the Fukushima Dai-ichi nuclear power plant (FD-NPP) developed into a disaster causing massive release of radioactivity into the atmosphere. In this study, we determine the emissions of two isotopes, the noble gas xenon-133 (133Xe) and the aerosol-bound caesium-137 (137Cs), which have very different release characteristics as well as behavior in the atmosphere. To determine radionuclide emissions as a function of height and time until 20 April, we made a first guess of release rates based on fuel inventories and documented accident events at the site.
  • This first guess was subsequently improved by inverse modeling, which combined the first guess with the results of an atmospheric transport model, FLEXPART, and measurement data from several dozen stations in Japan, North America and other regions. We used both atmospheric activity concentration measurements as well as, for 137Cs, measurements of bulk deposition. Regarding 133Xe, we find a total release of 16.7 (uncertainty range 13.4–20.0) EBq, which is the largest radioactive noble gas release in history not associated with nuclear bomb testing. There is strong evidence that the first strong 133Xe release started very early, possibly immediately after the earthquake and the emergency shutdown on 11 March at 06:00 UTC. The entire noble gas inventory of reactor units 1–3 was set free into the atmosphere between 11 and 15 March 2011. For 137Cs, the inversion results give a total emission of 35.8 (23.3–50.1) PBq, or about 42% of the estimated Chernobyl emission. Our results indicate that 137Cs emissions peaked on 14–15 March but were generally high from 12 until 19 March, when they suddenly dropped by orders of magnitude exactly when spraying of water on the spent-fuel pool of unit 4 started. This indicates that emissions were not only coming from the damaged reactor cores, but also from the spent-fuel pool of unit 4 and confirms that the spraying was an effective countermeasure. We also explore the main dispersion and deposition patterns of the radioactive cloud, both regionally for Japan as well as for the entire Northern Hemisphere. While at first sight it seemed fortunate that westerly winds prevailed most of the time during the accident, a different picture emerges from our detailed analysis
  • Exactly during and following the period of the strongest 137Cs emissions on 14 and 15 March as well as after another period with strong emissions on 19 March, the radioactive plume was advected over Eastern Honshu Island, where precipitation deposited a large fraction of 137Cs on land surfaces. The plume was also dispersed quickly over the entire Northern Hemisphere, first reaching North America on 15 March and Europe on 22 March. In general, simulated and observed concentrations of 133Xe and 137Cs both at Japanese as well as at remote sites were in good quantitative agreement with each other. Altogether, we estimate that 6.4 TBq of 137Cs, or 19% of the total fallout until 20 April, were deposited over Japanese land areas, while most of the rest fell over the North Pacific Ocean. Only 0.7 TBq, or 2% of the total fallout were deposited on land areas other than Japan.Discussion Paper (PDF, 6457 KB)   Supplement (13 KB)   Interactive Discussion (Open, 0 Comments)   Manuscript under review for ACP   
D'coda Dcoda

P/C Jaczko, Johnson & Tsutsui, The Ongoing Fukushima Daiichi Crisis [24Sep13] - 0 views

  •  
    At 45:00 in Gregory Jaczko, Former Chairman of the U.S. Nuclear Regulatory Commission: There's very risk significant activities happening in the next several months with the attempt to remove fuel from the Unit 4 spent fuel pool. That's a very significant activity, and it's also unprecedented. There's significant structural damage to the Unit 4 spent fuel pool. New structures had to be created. They're going to have to lift significant debris from the pools. These are all very, very unprecedented activities.
D'coda Dcoda

U.S. to restart construction of nuclear reactors [28Nov11] - 0 views

  • After 34 years, the United States is expected to resume construction of nuclear reactors by the end of the year, and Toshiba will export turbine equipment for the reactors to the U.S. early next month, it was learned Saturday. According to sources, construction will begin by year-end on the Nos. 3 and 4 reactors of the Alvin W. Vogtle Electric Generating Plant in Georgia Georgia Country Georgia /ˈdʒɔrdʒə/ (Georgian: საქართველო, sak’art’velo IPA: [sɑkʰɑrtʰvɛlɔ] ( listen)) is a sovereign state in the Caucasus region of Eurasia. Located at the crossroads of Western Asia and Eastern E... View full Dossier Latest news and the Nos. 2 and 3 reactors of the Virgil C. Summer Nuclear Generating Station in South Carolina South Carolina U.S. state South Carolina /ˌsaʊθ kærəˈlaɪnə/ is a state in the Deep South of the United States that borders Georgia to the south, North Carolina to the north, and the Atlantic Ocean to the east. Originally pa... View full Dossier Latest news .
  • The U.S. Nuclear Regulatory Commission Nuclear Regulatory Commission Government Agency (United States of America) The Nuclear Regulatory Commission (NRC) is an independent agency of the United States government that was established by the Energy Reorganization Act of 1974 from the United States Atomic Energy C... View full Dossier Latest news is expected to shortly approve the construction and operation of the reactors, which have been designed by Westinghouse, a subsidiary of Toshiba. The decision to resume construction of reactors is expected to pave the way for Japan Japan Country Japan /dʒəˈpæn/ (Japanese: 日本 Nihon or Nippon; formally 日本国  Nippon-koku or Nihon-koku, literally, the State of Japan) is an island nation in East Asia. Located in the Pacific Ocean, it lies to the... View full Dossier Latest news to export related equipment to the United States, observers said.
  • The reactors to be constructed are of the AP1000 type
D'coda Dcoda

Tepco: Recent quake caused water level drop in tank next to Spent Fuel Pool No. 4 [02Ja... - 0 views

  • UPDATE* EX-SKF has a translation of Tepco’s press release: Fukushima Reactor 4 Skimmer Surge Tank Latest: Earthquake Caused the Water to Go from SFP to Reactor Well Instead, Says TEPCO “Tepco officially admitted the decreasing water level of the tank at reactor 4 was caused by the earthquake on 1/1/2012. (Source) Tepco states the water did not flow into the tank from water cooling system but flew into the container vessel in stead. However they still have not announced they managed to fixed the broken part of the reactor.” -Fukushima Diary Mainichi Shimbun, January 2, 2012:
  • Google Translate Headline: <1 Fukushima nuclear power plant> No. 4 tank drawdown effects of earthquakes and announced …
  • TEPCO two days, the water level decreased by more than one day of the tank adjacent to the spent fuel pool of the first nuclear power plant Unit 4, Fukushima, said the cause, effects of earthquakes announced four largest intensity observed in northeastern Kanto was. TEPCO, flows into the opposite side of the reactor containment tank of radioactive contamination in pool water, and found that it caused by loss of water supply to the tank from a temporary pool. The cooling effect of the pool, he said. According to TEPCO, the tank water level is usually about 1.6 inches per hour, such as reduced natural evaporation, after the earthquake, were down by 8-9 cm per hour. Polluted water in the tank is removed from heat and dust through the filter and an external heat exchanger and returned to the pool again.
D'coda Dcoda

Major Study: Reactor No. 5 releases may explain why so much radioactive xenon... - 0 views

  • “Fortunately, due to the maintenance outage and the survival of one diesel generator, it seems that unit 5 reactor cores as well as spent fuel ponds have not suffered major fuel damage,” says the study. Though, Reactor No. 5 is mentioned again several pages later: “Total a posteriori [experienced levels] 133Xe emissions are 16.7 EBq, one third more than the a priori value [predicted levels] of 12.6 EBq (which is equal to the estimated inventory) and 2.5 times the estimated Chernobyl source term of 6.5 EBq.
  • If there was only 12.6 EBq of xenon-133 inventory that could be emitted from reactors 1-3 and spent fuel pool No. 4 — yet 16.7 EBq was experienced — where did the extra xenon come from, according to the study? “There is the possibility of additional releases from unit 5.” Another possibility is that recriticality has occurred in one of the reactor units. The study says the a priori emissions could have been overestimated, but discounts the notion that the initial 12.6 EBq figure so poorly underestimated the amount of xenon in Reactors 1-3 and SFP 4, “It is unlikely that the 133Xe inventories of the reactor units 1–3 were one third higher than estimated.”
  • ABSTRACT: ACPD – Xenon-133 and caesium-137 releases into the atmosphere from the Fukushima Dai-ichi nuclear power plant: determination of the source term, atmospheric dispersion, and deposition SOURCE: Discussion Paper See also: Report: Fukushima Reactors No. 5, 6 now in crisis — Cesium outside release points up 1,000% in recent days — Local says Hitachi engineers coming to help (VIDEO)
D'coda Dcoda

Is nuclear energy different than other energy sources? [08Sep11] - 0 views

  • Nuclear power proponents claim: It has low carbon emissions. It is the peaceful face of the atom and proliferation problems are manageable. It is compact -- so little uranium, so much energy. Unlike solar and wind, it is 24/7 electricity. It reduces dependence on oil. Let's examine each argument.
  • 1. Climate. Nuclear energy has low carbon emissions. But the United States doesn't lack low-carbon energy sources: The potential of wind energy alone is about nine times total US electricity generation. Solar energy is even more plentiful. Time and money to address climate change are in short supply, not low carbon dioxide sources. Instead of the two large reactors the United States would require every three months to significantly reduce carbon dioxide emissions, all the breathless pronouncements from nuclear advocates are only yielding two reactors every five years -- if that. Even federal loan guarantees have not given this renaissance momentum. Wall Street won't fund them. (Can nuclear power even be called a commercial technology if it can't raise money on Wall Street?) Today, wind energy is far cheaper and faster than nuclear. Simply put: Nuclear fares poorly on two crucial criteria -- time and money.
  • 2. Proliferation. President Eisenhower spoke of "Atoms for Peace" at the United Nations in 1953; he thought it would be too depressing only to mention the horrors of thermonuclear weapons. It was just a fig leaf to mask the bomb: Much of the interest in nuclear power is mainly a cover for acquiring bomb-making know-how. To make a real dent in carbon dioxide emissions, about 3,000 large reactors would have to be built worldwide in the next 40 years -- creating enough plutonium annually to create 90,000 bombs, if separated. Two or three commercial uranium enrichment plants would also be needed yearly -- and it has only taken one, Iran's, to give the world a nuclear security headache.
  • ...3 more annotations...
  • 3. Production. Nuclear power does produce electricity around the clock -- until it doesn't. For instance, the 2007 earthquake near the seven-reactor Kashiwazaki Kariwa plant in Japan turned 24/7 electricity into a 0/365 shutdown in seconds. The first of those reactors was not restarted for nearly two years. Three remain shut down. Just last month, an earthquake in Virginia shut down the two North Anna reactors. It is unknown when they will reopen. As for land area and the amount of fuel needed, nuclear proponents tend to forget uranium mining and milling. Each ton of nuclear fuel creates seven tons of depleted uranium. The eight total tons of uranium have roughly 800 tons of mill tailings (assuming ore with 1 percent uranium content) and, typically, a similar amount of mine waste. Nuclear power may have a much smaller footprint than coal, but it still has an enormous waste and land footprint once uranium mining and milling are considered.
  • 4. Consistency. Solar and wind power are intermittent. But the wind often blows when the sun doesn't shine. Existing hydropower and natural gas plants can fill in the gaps. Denmark manages intermittency by relying on Norwegian hydropower and has 20 percent wind energy. Today, compressed-air energy storage is economical, and sodium sulfur batteries are perhaps a few years from being commercial. Smart grids and appliances can communicate to alleviate intermittency. For instance, the defrost cycle in one's freezer could, for the most part, be automatically deferred to wind or solar energy surplus periods. Likewise, icemakers could store coldness to provide air-conditioning during peak hot days. The United States is running on an insecure, vulnerable, 100-year-old model for the grid -- the equivalent of a punch-card-mainframe computer system in the Internet age. It's a complete failure of imagination to say wind and solar intermittency necessitates nuclear power.
  • 5. Oil. The United States uses only a tiny amount of oil in the electricity sector. But with electric vehicles, solar- and wind-generated electricity can do more for "energy independence" now than nuclear can, as renewable energy plants can be built quickly. Luckily, this is rapidly becoming a commercial reality. Parked electric vehicles or plug-in hybrids in airports, large businesses, or mall parking lots could help solve intermittency more cheaply and efficiently. Ford is already planning to sell solar panels to go with their new all-electric Ford Focus in 2012. We don't need a costly, cumbersome, water-intensive, plutonium-making, financially risky method to boil water. Germany, Italy, and Switzerland are on their way to non-nuclear, low-carbon futures. Japan is starting down that road. A new official commission in France (yes, France!) will examine nuclear and non-nuclear scenarios. So, where is the Obama administration?
  •  
    From Bulletin of the Atomic Scientists
D'coda Dcoda

Skyrocketing new reactor construction costs that just toppled Calvert Cliffs ... - 0 views

  • NIRS, Public Citizen, South Carolina Sierra Club, and former NRC Commissioner Peter Bradford have warned in a press release that the same forces -- skyrocketing new reactor construction costs, decreased demand for electricity, competition from renewables and efficiency, low natural gas prices, etc. -- which just undermined the Calvert Cliffs 3 new reactor proposal in Maryland are also battering away at the new reactor proposals in Texas (South Texas Project Units 3 and 4) and South Carolina (V.C. Summer Units 2 and 3). Calvert Cliffs, South Texas Project, and Summer were the top three federal nuclear loan guarantee finalists after Vogtle Units 3 and 4 in Georgia, which the Obama administration awarded a conditional $8.3 billion taxpayer-backed loan guarantee last February. The audio recording of the full press conference is also posted online.
D'coda Dcoda

Did Fukushima kill the nuclear renaissance No, that renaissance died right here at home... - 0 views

shared by D'coda Dcoda on 04 Nov 11 - No Cached
  • In the aftermath of the Fukushima Daiichi nuclear disaster in Japan, many wondered what the event’s impact would be on the nuclear renaissance in the United States. Those who follow the nuclear industry didn’t need eight months of hindsight to give an answer: what nuclear renaissance? The outlook for U.S. nuclear power has worsened considerably in the past five years. Where once there were plans for new reactors at more than 30 different sites, today there are only five, and even those planned reactors might disappear. Only one is actually under construction, and to credit the industry with breaking ground on a new reactor is overstating its prospects. However, none of this gloom is the result of Japan’s tsunami. On the eve of the Tohoku earthquake, U.S. nuclear power looked just as moribund as it is today. The cause of this decline is not renewed concerns about safety, or even that old red herring, waste disposal — instead, it is simple economics. Other technologies, particularly natural gas, offer much cheaper power than nuclear both today and in the foreseeable future.
  • In 2009, the MIT Future of Nuclear Power study released an update to its 2003 estimate of the costs of nuclear power. Estimating a capital cost of $4,000/kW and a fuel cost of $0.67/MMBtu, the study’s authors projected a cost of new nuclear power of 6.6 cents/kWh. Using the same modeling approach, the cost of electricity from a natural gas plant with capital costs of $850/kW and fuel costs of $5.16/MMBtu would be 4.4 cents/kWh. What’s worse, the estimate of 6.6 cents/kWh assumes that nuclear power is able to secure financing at the same interest rate as natural gas plants. In reality, credit markets assign a significant risk premium to nuclear power, bringing its total levelized cost of electricity to 8.4 cents/kWh, nearly twice the cost of natural gas power. Unless the capital costs of new nuclear power plants turn out to be significantly less than what experts expect, or natural gas prices rise considerably in the near future, there is little reason to believe that any new nuclear plants will be built without significant subsidies. This is not to say that nuclear power could not make a comeback within the next 10 to 20 years. But before nuclear can once again be considered a credible competitor to fossil fuels, four changes must happen.
  • The second problem facing nuclear power is its high borrowing costs. To some extent, this problem is a natural consequence of nuclear power plants taking a longer time to build than natural gas plants and having a much higher construction risk (the capital cost of natural gas plants is well-established relative to that of nuclear power). And likewise, to some extent, this problem might resolve itself over time, both as the completion of nuclear plants helps nail down the true capital cost of nuclear power, and as vendors add smaller, modular reactor designs to their list of offerings. But much of the reason behind the high interest rates on loans to nuclear construction is that the industry is scoring an own-goal. In the current relationship between utilities and reactor vendors, utilities are asked to absorb all of the costs of a vendor’s overruns — if a reactor ends up costing a couple billion dollars more than the vendor quotes, it’s the utility that is expected to make up the difference.
  • ...4 more annotations...
  • This is terrifying for a utility’s creditors. The largest utilities in the United States have market capitalizations in the area of $30 billion, while most hover closer to $5 billion. If a nuclear project should fail, the utility might go completely bankrupt, leaving nothing to those foolish enough to lend them money. Accordingly, nuclear projects face higher borrowing costs than other electric projects. It doesn’t have to be this way — if reactor vendors and construction companies helped share the project risks posed by nuclear plants, borrowing costs would be lower. It is also possible for the U.S. government to shoulder some of the risk — but after Solyndra, few legislators have an appetite for letting energy companies push their risks onto the taxpayer.
  • Next, the United States is going to have to adopt some form of carbon tax on electricity generation, or offer a comparable subsidy to the nuclear industry. An appropriately sized carbon tax of $20/ton CO2 would raise the cost of natural-gas-generated electricity by 0.7 cents/kWh, while having a negligible impact on nuclear power
  • And finally, the nuclear industry is just going to have to catch some luck and see natural gas prices rise. That’s a tall order, given the new resources being opened up by hydraulic fracturing and the slowed consumption of natural gas brought about by the recession. But it’s not entirely outside of the realm of possibility — the futures market for natural gas has been wrong before.
  • Nuclear power is down, but not out. With a proper R&D focus, good business practices, appropriate policy, and a little luck, the gulf that separates nuclear power from its competitors may yet be bridged.
D'coda Dcoda

TEPCO doesn't know where melted fuel is at in reactors or actual level of radioactive p... - 0 views

  • Fukushima Reactors Status of Reactors Reactor No. 1 Reactor No. 2 Reactor No. 3 Spent Fuel Pools Spent Fuel Pool No. 1 Spent Fuel Pool No. 2 Spent Fuel Pool No. 3 Spent Fuel Pool No. 4 Common Spent Fuel Pool Radiation Releases Plutonium Uranium Chernobyl Comparisons Criticality Japan Tokyo Area Outside Tokyo U.S. & Canada West Coast California Los Angeles San Francisco Bay Area Hawaii Seattle Canada Midwest East Coast Florida US Nuclear Facilities Pacific Radiation Facts Internal Emitters Health Children Testing Food Water Air Rain Soil Milk Longterm Strange Coverups? Video Home Terms About Contact     Cooling system for reactors and spent fuel pools stopped working three times over 16-day period at Alabama nuke plant » NHK: TEPCO doesn’t know where melted fuel is at in reactors or actual level of radioactive particles still being released — About to start checking July 29th, 2011 at 06:43 AM POSITION: relative; BORDER-BOTTOM-STYLE: none; PADDING-BOTTOM: 0px; BORDER-RIGHT-STYLE: none; MARGIN: 0px; PADDING-LEFT: 0px; WIDTH: 336px; PADDING-RIGHT: 0px; DISPLAY: inline-table; BORDER-TOP-STYLE: none; HEIGHT: 280px; VISIBILITY: visible; BORDER
  • The operator of the Fukushima Daiichi nuclear power plant says it will extract air from troubled reactors at the plant to measure the amount of radioactive substances. [...] The operation is intended to obtain accurate data on what kind of radioactive substances are being released and in what quantity. The air extraction is expected to begin later on Friday for the No.1 reactor and in early August for the No.2 unit. No plans have been decided for the No.3 reactor due to high radiation levels in part of its building.
  • that TEPCO doesn’t know where the melted fuel is or the actual level of radioactive particles still being released: TEPCO hopes the findings may also help the company grasp the extent of leakage of nuclear fuels into the containment vessels. Up to around one billion becquerels of radioactive substances arebelieved to be released every hour from reactors No.1, 2 and 3. It isnot known how accurate this figure is because it was worked out bytaking readings of the air on the plant’s premises.
D'coda Dcoda

San Onofre nuclear power plant unit shut down after potential leak [30Jan12] - 0 views

  • Officials at the San Onofre nuclear power plant shut down one of the facility's two units Tuesday evening after a sensor detected a possible leak in a steam generator tube.The potential leak was detected about 4:30 p.m., and the unit was completely shut down about an hour later, Southern California Edison said. "The potential leak poses no imminent danger to the plant workers or the public," utility spokeswoman Jennifer Manfre told The Times. She said there were no evacuations and that crews were assessing the situation to determine if a leak had occurred.
D'coda Dcoda

Energy Forecast: Fracking in China, Nuclear Uncertain, CO2 Up [09Nov11] - 0 views

  • This year’s World Energy Outlook report has been published by the International Energy Agency, and says wealthy and industrializing countries are stuck on policies that threaten to lock in “an insecure, inefficient and high-carbon energy system.”You can read worldwide coverage of the report here. Fiona Harvey of the Guardian has a piece on the report that focuses on the inexorable trajectories for carbon dioxide, driven by soaring energy demand in Asia.A variety of graphs and slides can be reviewed here:
  • According to the report, Russia will long remain the world’s leading producer of natural gas, but exploitation of shale deposits in the United States, and increasingly in China, will greatly boost production in those countries (which will be in second and third place for gas production in 2035).Last month, in an interview with James Kanter of The Times and International Herald Tribune, the new head of the energy agency, Maria van der Hoeven, discussed one point made in the report today — that concerns raised by the damage to the Fukushima Daiichi power plant could continue to dampen expansion of nuclear power and add to the challenge of avoiding a big accumulation of carbon dioxide, saying: “Such a reduction would certainly make it more difficult for the world to meet the goal of stabilizing the rise in temperature to 2 degrees Centigrade.”
  • Short-term pressures on oil markets are easing with the economic slowdown and the expected return of Libyan supply. But the average oil price remains high, approaching $120/barrel (in year-2010 dollars) in 2035. Reliance grows on a small number of producers: the increase in output from Middle East and North Africa (MENA) is over 90% of the required growth in world oil output to 2035. If, between 2011 and 2015, investment in the MENA region runs one-third lower than the $100 billion per year required, consumers could face a near-term rise in the oil price to $150/barrel.Oil demand rises from 87 million barrels per day (mb/d) in 2010 to 99 mb/d in 2035, with all the net growth coming from the transport sector in emerging economies. The passenger vehicle fleet doubles to almost 1.7 billion in 2035. Alternative technologies, such as hybrid and electric vehicles that use oil more efficiently or not at all, continue to advance but they take time to penetrate markets.
  • ...5 more annotations...
  • In the WEO’s central New Policies Scenario, which assumes that recent government commitments are implemented in a cautious manner, primary energy demand increases by one-third between 2010 and 2035, with 90% of the growth in non-OECD economies. China consolidates its position as the world’s largest energy consumer: it consumes nearly 70% more energy than the United States by 2035, even though, by then, per capita demand in China is still less than half the level in the United States. The share of fossil fuels in global primary energy consumption falls from around 81% today to 75% in 2035. Renewables increase from 13% of the mix today to 18% in 2035; the growth in renewables is underpinned by subsidies that rise from $64 billion in 2010 to $250 billion in 2035, support that in some cases cannot be taken for granted in this age of fiscal austerity. By contrast, subsidies for fossil fuels amounted to $409 billion in 2010.
  • Here’s the summary of the main points, released today by the agency: “Growth, prosperity and rising population will inevitably push up energy needs over the coming decades. But we cannot continue to rely on insecure and environmentally unsustainable uses of energy,” said IEA Executive Director Maria van der Hoeven. “Governments need to introduce stronger measures to drive investment in efficient and low-carbon technologies. The Fukushima nuclear accident, the turmoil in parts of the Middle East and North Africa and a sharp rebound in energy demand in 2010 which pushed CO2 emissions to a record high, highlight the urgency and the scale of the challenge.”
  • The use of coal – which met almost half of the increase in global energy demand over the last decade – rises 65% by 2035. Prospects for coal are especially sensitive to energy policies – notably in China, which today accounts for almost half of global demand. More efficient power plants and carbon capture and storage (CCS) technology could boost prospects for coal, but the latter still faces significant regulatory, policy and technical barriers that make its deployment uncertain.Fukushima Daiichi has raised questions about the future role of nuclear power. In the New Policies Scenario, nuclear output rises by over 70% by 2035, only slightly less than projected last year, as most countries with nuclear programmes have reaffirmed their commitment to them. But given the increased uncertainty, that could change. A special Low Nuclear Case examines what would happen if the anticipated contribution of nuclear to future energy supply were to be halved. While providing a boost to renewables, such a slowdown would increase import bills, heighten energy security concerns and make it harder and more expensive to combat climate change.
  • The future for natural gas is more certain: its share in the energy mix rises and gas use almost catches up with coal consumption, underscoring key findings from a recent WEO Special Report which examined whether the world is entering a “Golden Age of Gas”. One country set to benefit from increased demand for gas is Russia, which is the subject of a special in-depth study in WEO-2011. Key challenges for Russia are to finance a new generation of higher-cost oil and gas fields and to improve its energy efficiency. While Russia remains an important supplier to its traditional markets in Europe, a shift in its fossil fuel exports towards China and the Asia-Pacific gathers momentum. If Russia improved its energy efficiency to the levels of comparable OECD countries, it could reduce its primary energy use by almost one-third, an amount similar to the consumption of the United Kingdom. Potential savings of natural gas alone, at 180 bcm, are close to Russia’s net exports in 2010.
  • In the New Policies Scenario, cumulative CO2 emissions over the next 25 years amount to three-quarters of the total from the past 110 years, leading to a long-term average temperature rise of 3.5°C. China’s per-capita emissions match the OECD average in 2035. Were the new policies not implemented, we are on an even more dangerous track, to an increase of 6°C.“As each year passes without clear signals to drive investment in clean energy, the “lock-in” of high-carbon infrastructure is making it harder and more expensive to meet our energy security and climate goals,” said Fatih Birol, IEA Chief Economist. The WEO presents a 450 Scenario, which traces an energy path consistent with meeting the globally agreed goal of limiting the temperature rise to 2°C. Four-fifths of the total energy-related CO2 emissions permitted to 2035 in the 450 Scenario are already locked-in by existing capital stock, including power stations, buildings and factories. Without further action by 2017, the energy-related infrastructure then in place would generate all the CO2 emissions allowed in the 450 Scenario up to 2035. Delaying action is a false economy: for every $1 of investment in cleaner technology that is avoided in the power sector before 2020, an additional $4.30 would need to be spent after 2020 to compensate for the increased emissions.
D'coda Dcoda

CPS must die [24Oct07} - 0 views

  • Collectively, Texas eats more energy than any other state, according to the U.S. Department of Energy. We’re fifth in the country when it comes to our per-capita energy intake — about 532 million British Thermal Units per year. A British Thermal Unit, or Btu, is like a little “bite” of energy. Imagine a wooden match burning and you’ve got a Btu on a stick. Of course, the consumption is with reason. Texas, home to a quarter of the U.S. domestic oil reserves, is also bulging with the second-highest population and a serious petrochemical industry. In recent years, we managed to turn ourselves into the country’s top producer of wind energy. Despite all the chest-thumping that goes on in these parts about those West Texas wind farms (hoist that foam finger!), we are still among the worst in how we use that energy. Though not technically “Southern,” Texans guzzle energy like true rednecks. Each of our homes use, on average, about 14,400 kilowatt hours per year, according to the U.S. Energy Information Administration. It doesn’t all have to do with the A/C, either. Arizonans, generally agreed to be sharing the heat, typically use about 12,000 kWh a year; New Mexicans cruise in at an annual 7,200 kWh. Don’t even get me started on California’s mere 6,000 kWh/year figure.
  • Let’s break down that kilowatt-hour thing. A watt is the energy of one candle burning down. (You didn’t put those matches away, did you?) A kilowatt is a thousand burnin’ candles. And a kilowatt hour? I think you can take it from there. We’re wide about the middle in Bexar, too. The average CPS customer used 1,538 kilowatt hours this June when the state average was 1,149 kWh, according to ERCOT. Compare that with Austin residents’ 1,175 kWh and San Marcos residents’ 1,130 kWh, and you start to see something is wrong. So, we’re wasteful. So what? For one, we can’t afford to be. Maybe back when James Dean was lusting under a fountain of crude we had if not reason, an excuse. But in the 1990s Texas became a net importer of energy for the first time. It’s become a habit, putting us behind the curve when it comes to preparing for that tightening energy crush. We all know what happens when growing demand meets an increasingly scarce resource … costs go up. As the pressure drop hits San Anto, there are exactly two ways forward. One is to build another massively expensive power plant. The other is to transform the whole frickin’ city into a de-facto power plant, where energy is used as efficiently as possible and blackouts simply don’t occur.
  • Consider, South Texas Project Plants 1&2, which send us almost 40 percent of our power, were supposed to cost $974 million. The final cost on that pair ended up at $5.5 billion. If the planned STP expansion follows the same inflationary trajectory, the price tag would wind up over $30 billion. Applications for the Matagorda County plants were first filed with the Atomic Energy Commission in 1974. Building began two years later. However, in 1983 there was still no plant, and Austin, a minority partner in the project, sued Houston Power & Lighting for mismanagement in an attempt to get out of the deal. (Though they tried to sell their share several years ago, the city of Austin remains a 16-percent partner, though they have chosen not to commit to current expansion plans).
  • ...17 more annotations...
  • CPS didn’t just pull nukes out of a hat when it went looking for energy options. CEO Milton Lee may be intellectually lazy, but he’s not stupid. Seeking to fulfill the cheap power mandate in San Antonio and beyond (CPS territory covers 1,566 square miles, reaching past Bexar County into Atascosa, Bandera, Comal, Guadalupe, Kendall, Medina, and Wilson counties), staff laid natural gas, coal, renewables and conservation, and nuclear side-by-side and proclaimed nukes triumphant. Coal is cheap upfront, but it’s helplessly foul; natural gas, approaching the price of whiskey, is out; and green solutions just aren’t ready, we’re told. The 42-member Nuclear Expansion Analysis Team, or NEAT, proclaimed “nuclear is the lowest overall risk considering possible costs and risks associated with it as compared to the alternatives.” Hear those crickets chirping?
  • NEAT members would hold more than a half-dozen closed-door meetings before the San Antonio City Council got a private briefing in September. When the CPS board assembled October 1 to vote the NRG partnership up or down, CPS executives had already joined the application pending with the U.S. Nuclear Regulatory Commission. A Supplemental Participation Agreement allowed NRG to move quickly in hopes of cashing in on federal incentives while giving San Antonio time to gather its thoughts. That proved not too difficult. Staff spoke of “overwhelming support” from the Citizen’s Advisory Board and easy relations with City staff. “So far, we haven’t seen any fatal flaws in our analysis,” said Mike Kotera, executive vice president of energy development for CPS. With boardmember and Mayor Phil Hardberger still in China inspecting things presumably Chinese, the vote was reset for October 29.
  • No one at the meeting asked about cost, though the board did request a month-by-month analysis of the fiasco that has been the South Texas Project 1&2 to be delivered at Monday’s meeting. When asked privately about cost, several CPS officers said they did not know what the plants would run, and the figure — if it were known — would not be public since it is the subject of contract negotiations. “We don’t know yet,” said Bob McCullough, director of CPS’s corporate communications. “We are not making the commitment to build the plant. We’re not sure at this point we really understand what it’s going to cost.” The $206 million outlay the board will consider on Monday is not to build the pair of 1,300-megawatt, Westinghouse Advanced Boiling Water Reactors. It is also not a contract to purchase power, McCullough said. It is merely to hold a place in line for that power.
  • It’s likely that we would come on a recurring basis back to the board to keep them apprised of where we are and also the decision of whether or not we think it makes sense for us to go forward,” said Larry Blaylock, director of CPS’s Nuclear Oversight & Development. So, at what point will the total cost of the new plants become transparent to taxpayers? CPS doesn’t have that answer. “At this point, it looks like in order to meet our load growth, nuclear looks like our lowest-risk choice and we think it’s worth spending some money to make sure we hold that place in line,” said Mark Werner, director of Energy Market Operations.
  • Another $10 million request for “other new nuclear project opportunities” will also come to the board Monday. That request summons to mind a March meeting between CPS officials and Exelon Energy reps, followed by a Spurs playoff game. Chicago-based Exelon, currently being sued in Illinois for allegedly releasing millions of gallons of radioactive wastewater beneath an Illinois plant, has its own nuclear ambitions for Texas. South Texas Project The White House champions nuclear, and strong tax breaks and subsidies await those early applicants. Whether CPS qualifies for those millions remains to be seen. We can only hope.
  • CPS has opted for the Super Honkin’ Utility model. Not only that — quivering on the brink of what could be a substantial efficiency program, CPS took a leap into our unflattering past when it announced it hopes to double our nuclear “portfolio” by building two new nuke plants in Matagorda County. The utility joined New Jersey-based NRG Energy in a permit application that could fracture an almost 30-year moratorium on nuclear power plant creation in the U.S.
  • After Unit 1 came online in 1988, it had to be shut down after water-pump shaft seared off in May, showering debris “all over the place,” according to Nucleonics Week. The next month two breakers failed during a test of backup power, leading to an explosion that sheared off a steam-generator pump and shot the shaft into the station yard. After the second unit went online the next year, there were a series of fires and failures leading to a half-million-dollar federal fine in 1993 against Houston Power. Then the plant went offline for 14 months. Not the glorious launch the partnership had hoped for. Today, CPS officials still do not know how much STP has cost the city, though they insist overall it has been a boon worth billions. “It’s not a cut-and-dried analysis. We’re doing what we can to try to put that in terms that someone could share and that’s a chore,” said spokesman McCollough. CPS has appealed numerous Open Records requests by the Current to the state Attorney General. The utility argues that despite being owned by the City they are not required to reveal, for instance, how much it may cost to build a plant or even how much pollution a plant generates, since the electricity market is a competitive field.
  • How do we usher in this new utopia of decentralized power? First, we have to kill CPS and bury it — or the model it is run on, anyway. What we resurrect in its place must have sustainability as its cornerstone, meaning that the efficiency standards the City and the utility have been reaching for must be rapidly eclipsed. Not only are new plants not the solution, they actively misdirect needed dollars away from the answer. Whether we commit $500 million to build a new-fangled “clean-coal” power plant or choose to feed multiple billions into a nuclear quagmire, we’re eliminating the most plausible option we have: rapid decentralization.
  • A 2003 study at the Massachusetts Institute of Technology estimates the cost of nuclear power to exceed that of both coal and natural gas. A U.S. Energy Information Administration report last year found that will still be the case when and if new plants come online in the next decade. If ratepayers don’t pay going in with nuclear, they can bet on paying on the way out, when virtually the entire power plant must be disposed of as costly radioactive waste. The federal government’s inability to develop a repository for the tens of thousands of tons of nuclear waste means reactors across the country are storing spent fuel in onsite holding ponds. It is unclear if the waste’s lethality and tens of thousands of years of radioactivity were factored into NEAT’s glowing analysis.
  • The federal dump choice, Nevada’s Yucca Mountain, is expected to cost taxpayers more than $60 billion. If it opens, Yucca will be full by the time STP 3&4 are finished, requiring another federal dump and another trainload of greenbacks. Just the cost of Yucca’s fence would set you back. Add the price of replacing a chain-link fence around, let’s say, a 100-acre waste site. Now figure you’re gonna do that every 50 years for 10,000 years or more. Security guards cost extra. That is not to say that the city should skip back to the coal mine. Thankfully, we don’t need nukes or coal, according to the American Council for an Energy-Efficient Economy, a D.C.-based non-profit that champions energy efficiency. A collection of reports released this year argue that a combination of ramped-up efficiency programs, construction of numerous “combined heat and power” facilities, and installation of on-site renewable energy resources would allow the state to avoid building new power plants. Texas could save $73 billion in electric generation costs by spending $50 billion between now and 2023 on such programs, according to the research group. The group also claims the efficiency revolution would even be good for the economy, creating 38,300 jobs. If ACEEE is even mostly right, plans to start siphoning millions into a nuclear reservoir look none too inspired.
  • To jump tracks will take a major conversion experience inside CPS and City Hall, a turning from the traditional model of towering plants, reels of transmission line, and jillions of dependent consumers. CPS must “decentralize” itself, as cities as close as Austin and as far away as Seattle are doing. It’s not only economically responsible and environmentally sound, but it is the best way to protect our communities entering what is sure to be a harrowing century. Greening CPS CPS is grudgingly going greener. In 2004, a team of consultants, including Wisconsin-based KEMA Inc., hired to review CPS operations pegged the utility as a “a company in transition.” Executives interviewed didn’t understand efficiency as a business model. Even some managers tapped to implement conservation programs said such programs were about “appearing” concerned, according to KEMA’s findings.
  • While the review exposed some philosophical shortcomings, it also revealed for the first time how efficiency could transform San Antonio. It was technically possible, for instance, for CPS to cut electricity demand by 1,935 megawatts in 10 years through efficiency alone. While that would be accompanied with significant economic strain, a less-stressful scenario could still cut 1,220 megawatts in that period — eliminating 36 percent of 2014’s projected energy use. CPS’s current plans call for investing $96 million to achieve a 225-megawatt reduction by 2016. The utility plans to spend more than four times that much by 2012 upgrading pollution controls at the coal-fired J.T. Deely power plant.
  • In hopes of avoiding the construction of Spruce 2 (now being built, a marvel of cleanliness, we are assured), Citizen Oversight Committee members asked KEMA if it were possible to eliminate 500 megawatts from future demand through energy efficiency alone. KEMA reported back that, yes, indeed it was possible, but would represent an “extreme” operation and may have “unintended consequences.” Such an effort would require $620 million and include covering 90 percent of the cost of efficiency products for customers. But an interesting thing happens under such a model — the savings don’t end in 2012. They stretch on into the future. The 504 megawatts that never had to be generated in 2012 end up saving 62 new megawatts of generation in 2013 and another 53 megawatts in 2014. With a few tweaks on the efficiency model, not only can we avoid new plants, but a metaphorical flip of the switch can turn the entire city into one great big decentralized power generator.
  • Even without good financial data, the Citizen’s Advisory Board has gone along with the plan for expansion. The board would be “pennywise and pound foolish” not to, since the city is already tied to STP 1&2, said at-large member Jeannie O’Sullivan. “Yes, in the past the board of CPS had been a little bit not as for taking on a [greater] percentage of nuclear power. I don’t know what their reasons were, I think probably they didn’t have a dialogue with a lot of different people,” O’Sullivan said.
  • For this, having a City-owned utility offers an amazing opportunity and gives us the flexibility to make most of the needed changes without state or federal backing. “Really, when you start looking, there is a lot more you can do at the local level,” said Neil Elliott of the ACEEE, “because you control building codes. You control zoning. You can control siting. You can make stuff happen at the local level that the state really doesn’t have that much control of.” One of the most empowering options for homeowners is homemade energy provided by a technology like solar. While CPS has expanded into the solar incentives field this year, making it only the second utility in the state to offer rebates on solar water heaters and rooftop panels, the incentives for those programs are limited. Likewise, the $400,000 CPS is investing at the Pearl Brewery in a joint solar “project” is nice as a white tiger at a truck stop, but what is truly needed is to heavily subsidize solar across the city to help kickstart a viable solar industry in the state. The tools of energy generation, as well as the efficient use of that energy, must be spread among the home and business owners.
  • Joel Serface, with bulb-polished pate and heavy gaze, refers to himself as a “product of the oil shock” who first discovered renewables at Texas Tech’s summer “geek camp.” The possibilities stayed with him through his days as a venture capitalist in Silicon Valley and eventually led him to Austin to head the nation’s first clean-energy incubation center. Serface made his pitch at a recent Solar San Antonio breakfast by contrasting Texas with those sun-worshipping Californians. Energy prices, he says, are “going up. They’re not going down again.” That fact makes alternative energies like solar, just starting to crack the 10-cent-per-killowatt barrier, financially viable. “The question we have to solve as an economy is, ‘Do we want to be a leader in that, or do we want to allow other countries [to outpace us] and buy this back from them?’” he asked.
  • To remain an energy leader, Texas must rapidly exploit solar. Already, we are fourth down the list when it comes not only to solar generation, but also patents issued and federal research awards. Not surprisingly, California is kicking silicon dust in our face.
D'coda Dcoda

Hydraulic testing at Kalinin 4, Russia [11Jul11] - 0 views

  • Russia's Kalinin 4 has moved a step nearer to startup with the commencement of hydraulic testing of the primary circuit of the VVER-1000 unit. Dummy fuel was loaded into the unit in May. The hydraulic tests will involve raising the pressure in the circuit to its maximum level to enable its strength and integrity to be verified. The circulation system will also be flushed through to ensure the system is clean before reactor fuel is loaded. Tests will also be carried out to confirm the availability of related equipment including electrical devices and the automated process control system. The unit is scheduled to start up in September 2011.
1 - 20 of 81 Next › Last »
Showing 20 items per page