Skip to main content

Home/ nuke.news/ Group items tagged regulations

Rss Feed Group items tagged

Energy Net

EnergySolutions' Utah site due trainloads of depleted uranium - Salt Lake Tribune - 0 views

  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  • ...21 more comments...
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
  •  
    More trains filled with depleted uranium are coming to Utah. Even as state regulators consider a moratorium on new shipments of the radioactive material -- which becomes more hazardous over time -- the U.S. Department of Energy plans to ship another 14,800 barrels of it to the EnergySolutions Inc. disposal site in Tooele County. Part of the $1.6 billion in federal stimulus money for the Savannah River cleanup site in South Carolina will pay for rail cars filled with depleted uranium to be buried in Utah during the next 13 months. "This is exactly the situation we were hoping to prevent by asking the state Radiation Control Board to enact a moratorium on depleted uranium," said Christopher Thomas of the Healthy Environment Alliance of Utah.
Energy Net

Deloitte Survey: Energy Regulators in a Green State of Mind - 0 views

  •  
    A majority of energy regulators agree that reducing greenhouse gas emissions will increase the costs of electricity, but that the public is willing to pay as much as 5 percent more for green energy, according to a survey from the Deloitte Center for Energy Solutions. The survey, which was completed by 60 state regulators in March and April 2009, found that 70 percent of surveyed regulators believe that the cost of electricity is likely to increase next year -- with 50 percent identifying environmental compliance as the strongest contributing factor to these increased electricity costs. In addition, more than 80 percent of surveyed regulators believe that the Obama administration's proposed cap and trade system for carbon dioxide emissions will result in higher electricity costs in their states. "For the second year in a row, our survey demonstrates that state utility regulators, while concerned about climate change, also understand the cost implications and viabilities of the various policy options," said Branko Terzic, Energy & Resources regulatory policy leader for Deloitte. Terzic is a former state regulator, a former commissioner with the Federal Energy Regulatory Commission (FERC) and a former utility executive. He went on to point out that surveyed regulators showed a continued belief in the green benefits of nuclear power: 55.2 percent of them claimed that nuclear power is "extremely effective" in reducing greenhouse gases associated with power generation in their state. The survey also revealed that more than two-thirds (71.7 percent) of responding state regulators believe that the U.S. should continue to develop Yucca Mountain, despite recent decisions by the administration to look for alternatives.
Energy Net

FR: NRC ESP for Vogtle - 0 views

  •  
    Notice of Issuance of Early Site Permit and Limited Work Authorization for the Vogtle Electric Generating Plant ESP Site AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance of Early Site Permit and Limited Work Authorization. SUPPLEMENTARY INFORMATION: [[Page 44880]] I. Introduction Pursuant to 10 CFR 2.106, the Nuclear Regulatory Commission (NRC) is providing notice of the issuance of Early Site Permit (ESP) ESP-004 to Southern Nuclear Operating Company (SNC), Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, an incorporated municipality in the State of Georgia acting by and through its Board of Water, Light and Sinking Fund Commissioners, for approval of a site located in Burke County, Georgia, 26 miles southeast of Augusta, Georgia for two nuclear power reactors; this action is separate from the filing of an application for a construction permit or combined license for such a facility. The NRC has found that the application for an early site permit (ESP), and accompanying limited work authorization (LWA), filed by Southern Nuclear Operating Company (SNC), on behalf of itself and the other four entities named above, complies with the applicable requirements of the Atomic Energy Act of 1954, as amended, and the applicable rules and regulations of the Commission. All required notifications to other agencies or bodies have been duly made. There is reasonable assurance that the permit holders will comply with the regulations in 10 CFR Chapter I and the health and safety of the public will not be endangered. There is reasonable assurance that the site is in conformity with the provisions of the Act and the Commission's regulations. SNC is technically qualified to engage in the activities authorized. Issuance of the ESP will not be inimical to the common defense and security or to the health and safety of the public. Issuance of the LWA will provide reasonable assurance of a
  •  
    Notice of Issuance of Early Site Permit and Limited Work Authorization for the Vogtle Electric Generating Plant ESP Site AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance of Early Site Permit and Limited Work Authorization. SUPPLEMENTARY INFORMATION: [[Page 44880]] I. Introduction Pursuant to 10 CFR 2.106, the Nuclear Regulatory Commission (NRC) is providing notice of the issuance of Early Site Permit (ESP) ESP-004 to Southern Nuclear Operating Company (SNC), Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, an incorporated municipality in the State of Georgia acting by and through its Board of Water, Light and Sinking Fund Commissioners, for approval of a site located in Burke County, Georgia, 26 miles southeast of Augusta, Georgia for two nuclear power reactors; this action is separate from the filing of an application for a construction permit or combined license for such a facility. The NRC has found that the application for an early site permit (ESP), and accompanying limited work authorization (LWA), filed by Southern Nuclear Operating Company (SNC), on behalf of itself and the other four entities named above, complies with the applicable requirements of the Atomic Energy Act of 1954, as amended, and the applicable rules and regulations of the Commission. All required notifications to other agencies or bodies have been duly made. There is reasonable assurance that the permit holders will comply with the regulations in 10 CFR Chapter I and the health and safety of the public will not be endangered. There is reasonable assurance that the site is in conformity with the provisions of the Act and the Commission's regulations. SNC is technically qualified to engage in the activities authorized. Issuance of the ESP will not be inimical to the common defense and security or to the health and safety of the public. Issuance of the LWA will provide reasonable assurance of a
Energy Net

FR: NRC: denial of petition by state of Nevada: Yucca Mountain - 0 views

  •  
    State of Nevada; Denial of Petition for Rulemaking AGENCY: Nuclear Regulatory Commission. ACTION: Petition for Rulemaking: Denial. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or Commission) is denying a petition for rulemaking submitted by the State of Nevada (Nevada or petitioner). The petition requests that NRC modify its regulation regarding issues specified for review in a notice of hearing for the Department of Energy (DOE) application for a high-level waste (HLW) repository construction authorization at Yucca Mountain, Nevada. The petitioner asserts that the proposed regulation would ``fill a gap'' in the NRC's current regulations. Further, petitioner asserts that the proposed regulation fulfills the Commission's intent when it first required a hearing for any docketed applications for construction of a HLW repository. NRC is denying the petition because it is inconsistent with current NRC rules and inconsistent with the Commission's intent when it originally established regulations requiring an opportunity for a hearing for all docketed HLW repository construction applications.
Energy Net

NRC: Options to Revise Radiation Protection Regulations and Guidance - 0 views

  •  
    On December 18, 2008, the staff of the U.S. Nuclear Regulatory Commission (NRC) submitted a Policy Issue Notation Vote Commission Paper, SECY-08-0197, requesting approval to revise the agency's radiation protection regulations and guidance to achieve greater alignment with the 2007 Recommendations of the International Commission on Radiological Protection (ICRP Publication 103). [The NRC's Synopsis of ICRP Publication 103, which is available through the Agencywide Documents Access and Management System (ADAMS), discusses the broad implications of the new recommendations.] Specifically, the revisions proposed to achieve alignment would affect the regulatory framework provided by Title 10, Part 20, of the Code of Federal Regulations (10 CFR Part 20), "Standards for Protection Against Radiation"; 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities"; and Appendix I to 10 CFR Part 50, "Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion 'As Low as is Reasonably Achievable' for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents." The Commission subsequently accepted the staff's recommendation through the related Staff Requirements Memorandum (SRM-SECY-08-0197), dated April 2, 2009, instructing the staff to immediately begin engagement with stakeholders and interested parties to initiate development of the technical basis for possible revision of the NRC's radiation protection regulations, as appropriate and where scientifically justified, to achieve greater alignment with the 2007 ICRP recommendations. In addition, the staff will seek to identify the scope of any warranted conforming changes in other parts of the 10 CFR regulations.
Energy Net

FR: NRC: proposed rule: emergency preparedness enhancements - 0 views

  •  
    Enhancements to Emergency Preparedness Regulations AGENCY: Nuclear Regulatory Commission. ACTION: Proposed rule. ----------------------------------------------------------------------- SUMMARY: The Nuclear Regulatory Commission (NRC or Commission) is proposing to amend certain emergency preparedness (EP) requirements in its regulations that govern domestic licensing of production and utilization facilities. A conforming provision would also be added in the regulations that govern licenses, certifications, and approvals for new nuclear power plants. The proposed amendments would codify certain voluntary protective measures contained in NRC Bulletin 2005-02, ``Emergency Preparedness and Response Actions for Security-Based Events,'' and other generically applicable requirements similar to those previously imposed by Commission orders. They would also amend other licensee emergency plan requirements based on a comprehensive review of the NRC's EP regulations and guidance. The proposed requirements would enhance the ability of licensees in preparing to take and taking certain emergency preparedness and protective measures in the event of a radiological emergency; address, in part, security issues identified after the terrorist events of September 11, 2001; clarify regulations to effect consistent emergency plan implementation among licensees; and modify certain EP requirements to be more effective and efficient.
Energy Net

Joint Regulatory Position Statement on the EPR Pressurised Water Reactor - 0 views

  •  
    The UK nuclear safety regulator (HSE's ND), the French nuclear regulator (ASN), and the Finnish nuclear regulator (STUK) are currently working to assess the EPR Pressurised Water Reactor. In carrying out individual assessments, we have all raised issues regarding the EPR Control and Instrumentation (C&I) systems, which the proposed licensees and/or the manufacturer (AREVA) are in the process of addressing. Although the EPR design being developed for each country varies slightly, the issues we raised with the current C&I system are broadly similar, our aim being to collectively obtain the highest levels of safety from the EPR. The issue is primarily around ensuring the adequacy of the safety systems (those used to maintain control of the plant if it goes outside normal conditions), and their independence from the control systems (those used to operate the plant under normal conditions).
  •  
    The UK nuclear safety regulator (HSE's ND), the French nuclear regulator (ASN), and the Finnish nuclear regulator (STUK) are currently working to assess the EPR Pressurised Water Reactor. In carrying out individual assessments, we have all raised issues regarding the EPR Control and Instrumentation (C&I) systems, which the proposed licensees and/or the manufacturer (AREVA) are in the process of addressing. Although the EPR design being developed for each country varies slightly, the issues we raised with the current C&I system are broadly similar, our aim being to collectively obtain the highest levels of safety from the EPR. The issue is primarily around ensuring the adequacy of the safety systems (those used to maintain control of the plant if it goes outside normal conditions), and their independence from the control systems (those used to operate the plant under normal conditions).
Energy Net

Government's Farewell to Nuclear Power - Bianet - 0 views

  •  
    Following the State Counil's decision, there are 12 days left to amend the government's regulations and have the nuclear power station tender approved by the Council of Ministers. Göltaş from the Electrical Engineers Chamber said this was practically impossible. The tender's dead line is 24 November. İlkbal Polat Istanbul - BİA News Center 13 November 2009, Friday Electrical Engineers Chamber (EMO) Energy Group member Cengiz Göltaş talked to bianet and summarized the State Council's decision concerning the regulations of the tender for a nuclear power plant: The dead line of the tender is 24 November. So there are 12 days in case the government wants to alter its decision or seek approval of the Council of Ministers for new regulations. This practically means a cancellation of the tender.
  •  
    Following the State Counil's decision, there are 12 days left to amend the government's regulations and have the nuclear power station tender approved by the Council of Ministers. Göltaş from the Electrical Engineers Chamber said this was practically impossible. The tender's dead line is 24 November. İlkbal Polat Istanbul - BİA News Center 13 November 2009, Friday Electrical Engineers Chamber (EMO) Energy Group member Cengiz Göltaş talked to bianet and summarized the State Council's decision concerning the regulations of the tender for a nuclear power plant: The dead line of the tender is 24 November. So there are 12 days in case the government wants to alter its decision or seek approval of the Council of Ministers for new regulations. This practically means a cancellation of the tender.
Energy Net

NRC: - NRC Seeks Public Comment on Proposed Rule on Security of Radioactive Materials - 0 views

  •  
    "The Nuclear Regulatory Commission seeks public comment on proposed new regulations that would codify and expand upon recent security measures the agency has imposed for certain sensitive radioactive materials. A proposed rule, to be published soon in the Federal Register, would add a new Part 37 to NRC's regulations in Title 10 of the U.S. Code of Federal Regulations (10 CFR), and make conforming changes to other parts of NRC regulations regarding radioactive materials. The proposed rule will establish security requirements for the most risk-significant radioactive materials (those in Category 1 and Category 2 of the International Atomic Energy Agency's rankings of radiation sources), as well as for shipments of small amounts of irradiated reactor fuel."
Energy Net

FR Doc: NRC: The Nuclear Regulatory Commission (NRC) is denying a petition for rulemak... - 0 views

  •  
    The Nuclear Regulatory Commission (NRC) is denying a petition for rulemaking (PRM-20-26) submitted by James Salsman (petitioner). The petitioner requested that NRC amend its regulations to modify exposure and environmental limits for heavy metal radionuclides, in particular uranium. NRC is denying the petition because current NRC regulations provide adequate protection of public health and safety. The petitioner has not presented sufficient peer-reviewed data, pertinent to the types and levels of exposures associated with the concentration values used in NRC's regulations, to provide a sufficient reason for NRC to initiate a revision of its regulations. Thus, the NRC has decided not to expend limited resources on initiating a rulemaking at this time.
Energy Net

NorthumberlandView.ca - CNSC Hearing Reveals Cracks In Radioactive Waste "Plan" - 0 views

  •  
    Question: When is a plan not a plan? Answer: When it is Atomic Energy of Canada Limited's "cleanup" proposal for the town of Port Hope, Ontario. At a packed hearing last week, Canada's nuclear regulator, the Canadian Nuclear Safety Commission, listened to presentations on the proposal from its staff, AECL, private citizens, and volunteer organizations - roughly 100 presentations in all, spanning 17 hours of hearing time. AECL is asking for a licence for a low level radioactive waste site. The site will house approximately 1.5 million cubic metres of nuclear and industrial waste, collected from the community over the course of the next decade. The proposal was approved in 2007, following a six-year environmental assessment. The ensuing licensing process should have been fairly straight forward - hash out a few technical details and get shovels in the ground.
  • ...4 more comments...
  •  
    Question: When is a plan not a plan? Answer: When it is Atomic Energy of Canada Limited's "cleanup" proposal for the town of Port Hope, Ontario. At a packed hearing last week, Canada's nuclear regulator, the Canadian Nuclear Safety Commission, listened to presentations on the proposal from its staff, AECL, private citizens, and volunteer organizations - roughly 100 presentations in all, spanning 17 hours of hearing time. AECL is asking for a licence for a low level radioactive waste site. The site will house approximately 1.5 million cubic metres of nuclear and industrial waste, collected from the community over the course of the next decade. The proposal was approved in 2007, following a six-year environmental assessment. The ensuing licensing process should have been fairly straight forward - hash out a few technical details and get shovels in the ground.
  •  
    Question: When is a plan not a plan? Answer: When it is Atomic Energy of Canada Limited's "cleanup" proposal for the town of Port Hope, Ontario. At a packed hearing last week, Canada's nuclear regulator, the Canadian Nuclear Safety Commission, listened to presentations on the proposal from its staff, AECL, private citizens, and volunteer organizations - roughly 100 presentations in all, spanning 17 hours of hearing time. AECL is asking for a licence for a low level radioactive waste site. The site will house approximately 1.5 million cubic metres of nuclear and industrial waste, collected from the community over the course of the next decade. The proposal was approved in 2007, following a six-year environmental assessment. The ensuing licensing process should have been fairly straight forward - hash out a few technical details and get shovels in the ground.
  •  
    Question: When is a plan not a plan? Answer: When it is Atomic Energy of Canada Limited's "cleanup" proposal for the town of Port Hope, Ontario. At a packed hearing last week, Canada's nuclear regulator, the Canadian Nuclear Safety Commission, listened to presentations on the proposal from its staff, AECL, private citizens, and volunteer organizations - roughly 100 presentations in all, spanning 17 hours of hearing time. AECL is asking for a licence for a low level radioactive waste site. The site will house approximately 1.5 million cubic metres of nuclear and industrial waste, collected from the community over the course of the next decade. The proposal was approved in 2007, following a six-year environmental assessment. The ensuing licensing process should have been fairly straight forward - hash out a few technical details and get shovels in the ground.
  •  
    Question: When is a plan not a plan? Answer: When it is Atomic Energy of Canada Limited's "cleanup" proposal for the town of Port Hope, Ontario. At a packed hearing last week, Canada's nuclear regulator, the Canadian Nuclear Safety Commission, listened to presentations on the proposal from its staff, AECL, private citizens, and volunteer organizations - roughly 100 presentations in all, spanning 17 hours of hearing time. AECL is asking for a licence for a low level radioactive waste site. The site will house approximately 1.5 million cubic metres of nuclear and industrial waste, collected from the community over the course of the next decade. The proposal was approved in 2007, following a six-year environmental assessment. The ensuing licensing process should have been fairly straight forward - hash out a few technical details and get shovels in the ground.
  •  
    Question: When is a plan not a plan? Answer: When it is Atomic Energy of Canada Limited's "cleanup" proposal for the town of Port Hope, Ontario. At a packed hearing last week, Canada's nuclear regulator, the Canadian Nuclear Safety Commission, listened to presentations on the proposal from its staff, AECL, private citizens, and volunteer organizations - roughly 100 presentations in all, spanning 17 hours of hearing time. AECL is asking for a licence for a low level radioactive waste site. The site will house approximately 1.5 million cubic metres of nuclear and industrial waste, collected from the community over the course of the next decade. The proposal was approved in 2007, following a six-year environmental assessment. The ensuing licensing process should have been fairly straight forward - hash out a few technical details and get shovels in the ground.
  •  
    Question: When is a plan not a plan? Answer: When it is Atomic Energy of Canada Limited's "cleanup" proposal for the town of Port Hope, Ontario. At a packed hearing last week, Canada's nuclear regulator, the Canadian Nuclear Safety Commission, listened to presentations on the proposal from its staff, AECL, private citizens, and volunteer organizations - roughly 100 presentations in all, spanning 17 hours of hearing time. AECL is asking for a licence for a low level radioactive waste site. The site will house approximately 1.5 million cubic metres of nuclear and industrial waste, collected from the community over the course of the next decade. The proposal was approved in 2007, following a six-year environmental assessment. The ensuing licensing process should have been fairly straight forward - hash out a few technical details and get shovels in the ground.
Energy Net

Hanford News: Email Story Print Story AddThis tool name close tool goes here Report... - 0 views

  •  
    The federal agency that regulates the transport of explosives, toxic chemicals, fireworks and other hazardous materials has for years quietly waived safety regulations because of its cozy relationship with industry, according to a congressional report. The Pipeline and Hazardous Materials Safety Administration, which regulates shipment of potentially dangerous cargo by land, sea and air, also has ignored whether shippers have been involved in accidents or cited for violating regulations before granting or renewing the waivers, the report said. The report was based on an investigation by the House Transportation and Infrastructure Committee, which has scheduled a hearing for Thursday on whether PHMSA is doing its job. The chief witness scheduled to testify at the hearing is Transportation Department Inspector General Calvin Scovel, who warned administration officials in late July that a separate investigation by his office had uncovered significant concerns.
Energy Net

NRC Finalizes New Jersey Agreement To Regulate Certain Radioactive Materials - Nuclear ... - 0 views

  •  
    Nuclear Power Industry New is a blog about utilities, companies, suppliers in the nuclear energy market. NRC Finalizes New Jersey Agreement To Regulate Certain Radioactive Materials NRC will transfer an estimated 500 licenses for radioactive material to New Jersey's jurisdiction The Nuclear Regulatory Commission has completed an agreement with New Jersey, under which the state will assume NRC's regulatory authority over certain radioactive materials. New Jersey becomes the 37th NRC Agreement State, effective Sept. 30. Under the agreement, the NRC will transfer to New Jersey the responsibility for licensing, rulemaking, inspection and enforcement activities for: (1) radioactive materials produced as byproducts from the production or utilization of special nuclear material (SNM - enriched uranium or plutonium); (2) naturally occurring or accelerator-produced byproduct material (NARM); (3) source material (uranium and thorium); (4) SNM in quantities not sufficient to support a nuclear chain reaction; and (5) the regulation of the land disposal of source, byproduct, and SNM received from other persons.
  •  
    Nuclear Power Industry New is a blog about utilities, companies, suppliers in the nuclear energy market. NRC Finalizes New Jersey Agreement To Regulate Certain Radioactive Materials NRC will transfer an estimated 500 licenses for radioactive material to New Jersey's jurisdiction The Nuclear Regulatory Commission has completed an agreement with New Jersey, under which the state will assume NRC's regulatory authority over certain radioactive materials. New Jersey becomes the 37th NRC Agreement State, effective Sept. 30. Under the agreement, the NRC will transfer to New Jersey the responsibility for licensing, rulemaking, inspection and enforcement activities for: (1) radioactive materials produced as byproducts from the production or utilization of special nuclear material (SNM - enriched uranium or plutonium); (2) naturally occurring or accelerator-produced byproduct material (NARM); (3) source material (uranium and thorium); (4) SNM in quantities not sufficient to support a nuclear chain reaction; and (5) the regulation of the land disposal of source, byproduct, and SNM received from other persons.
Energy Net

NRC: The Browns Ferry Nuclear Plant Fire of 1975 and the History of NRC Fire Regulation... - 0 views

  •  
    Fire events provide a unique source of historical data, but only when the lessons learned provide advancements in safety. When these lessons are learned but not preserved, they are often repeated. The PURPOSE of this brochure and DVD is to preserve the history and impact of the fire at the Browns Ferry Nuclear (BFN) Power Plant on regulations and to educate future generations of safety professionals. Fire protection in commercial nuclear power plants (NPPs) has been a longstanding challenge since operations began. In the 1960s and 1970s, when most of today's nuclear power reactors were being constructed, the U.S. Nuclear Regulatory Commission's (NRC's) predecessor-the Atomic Energy Commission-began adopting rules and regulations to ensure fire safety. The first adopted fire protection regulation was General Design Criterion (GDC) 3, "Fire Protection," as Appendix A of 10 CFR Part 50 in February 1971. The GDC 3, in part, states that:
Energy Net

NRC: NRC Seeks Public Comment on Potential Changes to Radiation Protection Regulations - 0 views

  •  
    The Nuclear Regulatory Commission is seeking public comment on regulatory issues and options for potential changes to the agency's radiation protection regulations, to achieve greater alignment between the regulations and the 2007 recommendations of the International Commission on Radiological Protection (ICRP). The NRC believes that the agency's current regulations continue to provide adequate protection of health and safety of workers, the public and the environment. The ICRP recommendations, contained in ICRP Publication 103, propose measures that go beyond what is needed to provide adequate protection. In a Staff Requirements Memorandum dated April 2, the Commission directed the staff to engage stakeholders and interested parties on the benefits and burdens of any potential regulatory changes based on the ICRP recommendations.
Energy Net

NRC - NRC Extends Comment Period on Proposed Rule Revisions to Environmental Protection... - 0 views

  •  
    The U.S. Nuclear Regulatory Commission has extended the public comment period on the proposed rule revisions to the environmental protection regulations, specifically the Summary of Findings on National Environmental Policy Act (NEPA) Issues for License Renewal of Nuclear Power Plants and the draft revision of Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, originally published in 1996. The submittal deadline is extended from Oct. 14 to Jan. 12, 2010. The public can view the NRC's original notice on the proposed rule revisions in the Federal Register at: http://edocket.access.gpo.gov/2009/pdf/E9-24153.pdf exit icon PDF Iconand the original press release at: http://www.nrc.gov/reading-rm/doc-collections/news/2009/09-130.html. The NRC has held public meetings to obtain comments in Georgia, Massachusetts, Illinois and Maryland; the California meetings will be held in October and have been announced separately. Comments on the proposed rule, draft revised GEIS and associated documents may be submitted via the federal e-Rulemaking Portal at http://www.regulations.gov exit icon (Docket I.D. NRC-2008-0608); by e-mail to Rulemaking.Comments@nrc.gov ; by mail to Secretary, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, ATTN: Rulemakings and Adjudications Staff; or by fax to 301-492-3466. Written comments on the draft revised GEIS should be sent to: Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, Mailstop TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001.
  •  
    The U.S. Nuclear Regulatory Commission has extended the public comment period on the proposed rule revisions to the environmental protection regulations, specifically the Summary of Findings on National Environmental Policy Act (NEPA) Issues for License Renewal of Nuclear Power Plants and the draft revision of Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, originally published in 1996. The submittal deadline is extended from Oct. 14 to Jan. 12, 2010. The public can view the NRC's original notice on the proposed rule revisions in the Federal Register at: http://edocket.access.gpo.gov/2009/pdf/E9-24153.pdf exit icon PDF Iconand the original press release at: http://www.nrc.gov/reading-rm/doc-collections/news/2009/09-130.html. The NRC has held public meetings to obtain comments in Georgia, Massachusetts, Illinois and Maryland; the California meetings will be held in October and have been announced separately. Comments on the proposed rule, draft revised GEIS and associated documents may be submitted via the federal e-Rulemaking Portal at http://www.regulations.gov exit icon (Docket I.D. NRC-2008-0608); by e-mail to Rulemaking.Comments@nrc.gov ; by mail to Secretary, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, ATTN: Rulemakings and Adjudications Staff; or by fax to 301-492-3466. Written comments on the draft revised GEIS should be sent to: Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, Mailstop TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001.
Energy Net

Brief on recurring leakage past control rod seals at Palisades (07/16/2010) | Union of ... - 0 views

  •  
    "Download: Palisades Recurring Leakage (07/16/10) The Nuclear Regulatory Commission's (NRC) regulations (specifically Appendix B to 10 CFR Part 50) require that plant owners find and fix safety problems. At the Palisades nuclear plant in Michigan, there have been recurring leaks of reactor cooling water past the seals on the control rod drives. Such a leak forced operators to shut down the reactor on June 24, 2010, for yet another repair attempt. Workers have replaced the seals numerous times, trying different designs and materials. Workers have also modified and re-modified the ventilation system for the area where the control rod drive seals are located in attempts to prevent seal damage from high temperatures. As our brief describes, the Palisades' owner found it cannot fix this safety problem. This is where an effective regulator would step in. Safety regulations require safety problems to be found and fixed. The NRC must stop monitoring the repetitive failures at Palisades and take the steps necessary to ensue that the proper fix is finally found. "
Energy Net

Huntsman chides feds on foreign N-waste; challenger says Guv asleep at wheel - Salt Lak... - 0 views

  •  
    Gov. Jon Huntsman Jr. said Tuesday that federal regulators failed Utah by letting radioactive waste from foreign countries be disposed of in the EnergySolutions landfill. "Shame on the United States for doing that," Huntsman said during a gubernatorial debate. "The United States government did not inform our regulators and did not inform the Northwest Compact," the regional body that regulates radioactive waste, Huntsman said. "Shame on them."
Energy Net

Under the radar: Canada's, Mexico's radioactive waste comes into Utah - Salt Lake Tribune - 0 views

  •  
    Federal regulators gave their blessing to low-level radioactive waste from Canada and Mexico that is now buried in Utah. But Utah never got the memo. Nor did the regional radioactive waste oversight organization Utah belongs to. That foreign waste could be imported into Utah without the knowledge of state and regional officials might seem hard to believe in such a highly regulated business as radioactive waste. But federal regulators saw no reason to keep Utah in the loop on such small shipments.
Energy Net

Under the radar: Canada's, Mexico's radioactive waste comes into Utah - Salt Lake Tribune - 0 views

  •  
    Federal regulators gave their blessing to low-level radioactive waste from Canada and Mexico that is now buried in Utah. But Utah never got the memo. Nor did the regional radioactive waste oversight organization Utah belongs to. That foreign waste could be imported into Utah without the knowledge of state and regional officials might seem hard to believe in such a highly regulated business as radioactive waste. But federal regulators saw no reason to keep Utah in the loop on such small shipments.
1 - 20 of 695 Next › Last »
Showing 20 items per page