Energy Net

FR: NRC: Energy Solutions FONSI - 0 views

  •  
    "The U.S. Nuclear Regulatory Commission (NRC) has prepared an Environmental Assessment for the issuance of an Order as authorized by Section 274f of the Atomic Energy Act that would modify an Order issued to EnergySolutions, LLC (formerly Envirocare of Utah, Inc.) on May 7, 1999 (64 FR 27826; May 21, 1999). In accordance with 10 CFR 51.33, the NRC prepared a draft Finding of No Significant Impact (FONSI) for this amendment, which was published for public review and comment on October 7, 2009 (74 FR 51622). The public comment period closed on November 6, 2009. NRC received 12 comments from 4 commenters. The Order responds to a request by EnergySolutions dated September 26, 2006, to amend the package mass limits contained in Condition 4 of their 2006 Order, and to add or revise other conditions. The May 7, 1999, Order exempted EnergySolutions from certain NRC regulations and permitted EnergySolutions, under specified conditions, to possess waste containing special nuclear material (SNM), in greater quantities than specified in 10 CFR Part 150 at its facility located in Clive, Utah, without obtaining an NRC license under 10 CFR Part 70. As discussed below, the Order has been amended four times since it was issued in 1999. "
Energy Net

FR: NRC: Westinghouse Petition - 0 views

  •  
    The Nuclear Regulatory Commission (NRC) will consider the issues raised in a petition for rulemaking (PRM) submitted by Westinghouse Electric Company LLC (petitioner) in the NRC's rulemaking process. The petition was dated November 4, 1999, and was docketed as PRM-50-69. The petitioner requested that Table 1 in 10 CFR Part 50, Appendix G, be amended by removing requirements related to the metal temperature of the closure head flange and vessel flange regions. Specifically, the petitioner requested that footnotes (2) and (6) be removed from Table 1.
Energy Net

FR: NRC: petetion on radiation safety levels - 0 views

  •  
    The Nuclear Regulatory Commission (NRC) is denying the petition for rulemaking (PRM) filed by Mr. Raymond A. Crandall on May 17, 2007, and docketed on June 22, 2007 (Docket No. PRM-50-87). In his petition, the petitioner requested that the NRC amend the regulations that govern domestic licensing of production and utilization facilities to eliminate the specific criteria related to the radiological doses for control room habitability at nuclear power plants. The petitioner stated that the current deterministic radiological dose requirements for control room habitability have resulted in several negative safety consequences, including an increased risk to public safety. He requested that the NRC delete the 5 rem whole body dose limit and the 0.05 sievert (Sv) (5 rem) total effective dose equivalent (TEDE) limit specified in the current regulations.
Energy Net

FR: FR: DOE: SPEIS ROD: Nuclear fuel cycle bombplex 2030 part II - 0 views

  •  
    Record of Decision for the Complex Transformation Supplemental Programmatic Environmental Impact Statement--Tritium Research and Development, Flight Test Operations, and Major Environmental Test Facilities AGENCY: National Nuclear Security Administration, U.S. Department of Energy. [[Page 77657]] ACTION: Record of Decision. ----------------------------------------------------------------------- SUMMARY: The National Nuclear Security Administration (NNSA), a separately organized agency within the U.S. Department of Energy (DOE), is issuing this Record of Decision (ROD) for the continued transformation of the nuclear weapons complex (Complex). This ROD is based on information and analyses contained in the Complex Transformation Supplemental Programmatic Environmental Impact Statement (SPEIS) (DOE/EIS-0236-S4) issued on October 24, 2008 (73 FR 63460); comments received on the SPEIS; and other factors, including costs, technical and security considerations, and the missions of NNSA. The SPEIS analyzes the potential environmental impacts of alternatives for transforming the nuclear weapons complex into a smaller, more efficient enterprise that can respond to changing national security challenges and ensure the long-term safety, security, and reliability of the nuclear weapons stockpile.
Energy Net

FR: DOE: SPEIS ROD: Nuclear fuel cycle bombplex 2030 part I - 0 views

  •  
    Record of Decision for the Complex Transformation Supplemental Programmatic Environmental Impact Statement--Operations Involving Plutonium, Uranium, and the Assembly and Disassembly of Nuclear Weapons AGENCY: National Nuclear Security Administration, U.S. Department of Energy. ACTION: Record of decision. ----------------------------------------------------------------------- SUMMARY: The National Nuclear Security Administration (NNSA), a separately organized agency within the U.S. Department of Energy (DOE), is issuing this Record of Decision (ROD) for the continued transformation of the nuclear weapons complex (Complex). This ROD is based on information and analyses contained in the Complex Transformation Supplemental Programmatic Environmental Impact Statement (SPEIS) (DOE/EIS-0236-S4) issued on October 24, 2008 (73 FR 63460); comments received on the SPEIS; other NEPA analyses as noted; and other factors, including cost, technical and security considerations, and the missions of NNSA. The SPEIS analyzes the potential environmental impacts of alternatives for transforming the nuclear weapons complex into a smaller, more efficient enterprise that can respond to changing national security challenges and ensure the long-term safety, security, and reliability of the nuclear weapons stockpile.
Energy Net

FR: NRC: Callaway COL - 0 views

  •  
    Union Electric Company d/b/a Amerenue; Acceptance for Docketing of an Application for Combined License for Callaway Plant Unit 2 Nuclear Power Plant By letter dated July 28, 2008, as supplemented by letters dated September 24, 2008, November 14, 2008, and November 25, 2008, Union Electric Company d/b/a AmerenUE (AmerenUE), submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for a combined license (COL) for a single unit of the U.S. Evolutionary Power Reactor (U.S. EPR) in accordance with the requirements contained in 10 CFR Part 52, ``Licenses, Certifications and Approvals for Nuclear Power Plants.'' This reactor will be identified as Callaway Plant Unit 2 and is to be located at the current Callaway County, Missouri site of the Callaway Power Plant. A notice of receipt and availability of this application was previously published in the Federal Register (73 FR 59677) on October 9, 2008, as corrected in Federal Register (73 FR 61444 on October 16, 2008).
Energy Net

FR: NRC: Comanche Peak EIS - 0 views

  •  
    Luminant Generation Company LLC; Comanche Peak Nuclear Power Plant Units 3 and 4 Combined License Application; Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process Luminant Generation Company LLC (Luminant) has submitted an application for two combined licenses (COLs) to build Units 3 and 4 at its Comanche Peak Nuclear Power Plant (CPNPP) site, located on approximately 7,950 acres in Somervell and Hood Counties, Texas. CPNPP is located on Squaw Creek Reservoir, approximately 5.2 miles (mi) north of Glen Rose, Texas. Luminant submitted the application for the COL to the U.S. Nuclear Regulatory Commission (NRC) by letter dated September 19, 2008, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 52. A notice of receipt and availability of the application for the COLs, including the Environmental Report (ER), was published in the Federal Register on November 7, 2008 (73 FR 66276).
Energy Net

FR: NRC: decommissioning estimates - 0 views

  •  
    A requirement placed upon nuclear power reactor licensees by the NRC is that licensees must annually adjust the estimate of the cost of decommissioning their plants, in dollars of the current year, as part of the process to provide reasonable assurance that adequate funds for decommissioning will be available when needed. This report, which is revised periodically, explains the formula that is acceptable to the NRC for determining the minimum decommissioning fund requirements for nuclear power plants. The sources of information used in the formula are identified, and the values developed for the estimation of radioactive waste burial/disposition costs, by site and by year, are given.
Energy Net

FR: NRC: TMI Exelon license - 0 views

  •  
    In the Matter of AmerGen Energy Company, LLC; Exelon Generation Company, LLC (Three Mile Island Nuclear Station, Unit 1); Order Approving Transfer of License and Conforming Amendment I AmerGen Energy Company, LLC (AmerGen or licensee) is the holder of Facility Operating License No. DPR-50, which authorizes the possession, use, and operation of the Three Mile Island Nuclear Station, Unit 1 (TMI-1). AmerGen is a wholly owned subsidiary of Exelon Generation Company, LLC (EGC). The facility is located at the licensee's site in Dauphin County Pennsylvania.
Energy Net

FR: NIOSH: Worker contamination cohort for CANEL Middletown Ct - 0 views

  •  
    The Department of Health and Human Services (HHS) gives notice of a decision to designate a class of employees at the Connecticut Aircraft Nuclear Engine Laboratory in Middletown, Connecticut, as an addition to the Special Exposure Cohort (SEC) under the Energy Employees Occupational Illness Compensation Program Act of 2000. On October 24, 2008, the Secretary of HHS designated the following class of employees as an addition to the SEC: All employees of the Department of Energy (DOE), its predecessor agencies, and DOE contractors or subcontractors who worked at the Connecticut Aircraft Nuclear Engine Laboratory in Middletown, CT, from January 1, 1958 through December 31, 1965 for a number of work days aggregating at least 250 work days occurring either solely under this employment or in combination with work days within the parameters established for one or more other classes of employees in the Special Exposure Cohort.
Energy Net

FR: NRC TMI GEIS license renewal - 0 views

  •  
    Amergen Energy Company, LLC, Three Mile Island Nuclear Station, Unit 1; Notice of Availability of the Draft Supplement 37 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, and Public Meeting for the License Renewal of Three Mile Island Nuclear Station, Unit 1 Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC, Commission) has published a draft plant-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS), NUREG-1437, regarding the renewal of operating license DPR-50 for an additional 20 years of operation for Three Mile Island Nuclear Station, Unit 1 (TMI-1). TMI-1 is located in Londonderry Township in Dauphin County, Pennsylvania, on the northern end of Three Mile Island near the eastern shore of the Susquehanna River. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources.
Energy Net

FR: NRC Detroit Edison Col for Fermi 3 - 0 views

  •  
    Detroit Edison Company Fermi Nuclear Power Plant, Unit 3 Combined License Application Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process Detroit Edison Company (Detroit Edison) has submitted an application for a combined license (COL) to build the Fermi Nuclear Power Plant, Unit 3 (Fermi 3) at its Enrico Fermi Atomic Power Plant (Fermi) site, located on approximately 1,260 acres in Monroe County, Michigan, on Lake Erie, approximately 25 miles northeast of Toledo, Ohio and 30 miles southwest of Detroit, Michigan.
Energy Net

FR: NIOSH: Worker's Cohort petition Canonsburg Pa - 0 views

  •  
    The Department of Health and Human Services (HHS) gives notice as required by 42 CFR 83.12(e) of a decision to evaluate a petition to designate a class of employees at the Vitro Manufacturing in Canonsburg, Pennsylvania, to be included in the Special Exposure Cohort under the Energy Employees Occupational Illness Compensation Program Act of 2000. The initial proposed definition for the class being evaluated, subject to revision as warranted by the evaluation, is as follows: Facility: Vitro Manufacturing. Location: Canonsburg, Pennsylvania. Job Titles and/or Job Duties: All Atomic Weapons Employer employees. Period of Employment: August 13, 1942 through December 31, 1957.
Energy Net

FRz: NIOSH: Worikers Cohort petition Chicago Il - 0 views

  •  
    The Department of Health and Human Services (HHS) gives notice as required by 42 CFR 83.12(e) of a decision to evaluate a petition to designate a class of employees at the Metallurgical Laboratory in Chicago, Illinois, to be included in the Special Exposure Cohort under the Energy Employees Occupational Illness Compensation Program Act of 2000. The initial proposed definition for the class being evaluated, subject to revision as warranted by the evaluation, is as follows: Facility: Metallurgical Laboratory. Location: Chicago, Illinois. Job Titles and/or Job Duties: All Atomic Weapons Employer employees. Period of Employment: August 13, 1942 through June 30, 1946.
Energy Net

FR: NIOSH: Worker's Cohort petition St Louis Mo - 0 views

  •  
    The Department of Health and Human Services (HHS) gives notice as required by 42 CFR 83.12(e) of a decision to evaluate a petition to designate a class of employees at the Mallinckrodt Chemical Co., Destrehan Street Plant in St. Louis, Missouri, to be included in the Special Exposure Cohort under the Energy Employees Occupational Illness Compensation Program Act of 2000. The initial proposed definition for the class being evaluated, subject to revision as warranted by the evaluation, is as follows: Facility: Mallinckrodt Chemical Co., Destrehan Street Plant. Location: St. Louis, Missouri. Job Titles and/or Job Duties: All employees who worked with uranium. Period of Employment: January 1, 1958 to December 31, 1958.
Energy Net

FR: DOE: Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stew... - 0 views

  •  
    Notice of Availability of the Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center AGENCY: Department of Energy. ACTION: Notice of availability. ----------------------------------------------------------------------- SUMMARY: The U.S. Department of Energy (DOE) announces the availability of the Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226-D [Revised]) (referred to as the ``Draft Decommissioning and/or Long-Term Stewardship EIS'' or ``Draft EIS''). This Draft EIS revises the Draft Environmental Impact Statement for Completion of the West Valley Demonstration Project and Closure or Long-Term Management of Facilities at the Western New York Nuclear Service Center (DOE/EIS-0226-D) issued for public comment in January 1996 (referred to as the ``1996 Cleanup and Closure Draft EIS'').
Energy Net

FR: NRC: San Onofre 3 FONSI - 0 views

  •  
    Southern California Edison Company; San Onofre Nuclear Generating Station, Unit 3, Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 74, Section 74.19(c), for Facility Operating License No. NPF-15, issued to Southern California Edison Company (SCE, the licensee), for operation of the San Onofre Nuclear Generating Station (SONGS), Unit 3, located in San Diego County, California. Therefore, as required by 10 CFR 51.21, the NRC is issuing this environmental assessment and finding of no significant impact.
Energy Net

FR: NRC: GEIS vogtle license renewal - 0 views

  •  
    Southern Nuclear Operating Company, Inc.; Notice of Availability of the Final Supplement 34 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding the License Renewal of Vogtle Electric Generating Plant, Units 1 and 2
Energy Net

FR: NRC: FONSI for Ft Calhoun - 0 views

  •  
    Omaha Public Power District; Fort Calhoun Station, Unit No. 1; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption from the requirements of Section III.G.1.b of Appendix R to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, for Facility Operating License No. DPR-40, issued to Omaha Public Power District (OPPD, the licensee), for operation of the Fort Calhoun Station, Unit No. 1, located in Washington County, Nebraska. Therefore, as required by 10 CFR 51.21, the NRC is issuing this environmental assessment and finding of no significant impact.
Energy Net

FR: NRC: GEIS: Indian Point License renewal - 0 views

  •  
    Indian Point Nuclear Generating Unit Nos. 2 and 3; Notice of Availability of the Draft Supplement 38 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meeting for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3