EIA - Press Releases - EIA Assesses Impact of Economic Growth, Oil Prices, and Future P... - 0 views

  • The U.S. Energy Information Administration (EIA) today released the complete version of the Annual Energy Outlook 2010 (AEO2010), which includes 38 sensitivity cases that show how different assumptions regarding market and policy drivers affect the Reference case projections that EIA previously released in December, 2009. In addition to considering alternative scenarios for oil prices, economic growth, and the uptake of more energy-efficient technologies, the AEO2010 includes cases that examine the impact of changes in selected policies, such as the extension of existing policies that are currently scheduled to sunset as well as the sensitivity of natural gas shale production to variations in drilling activity and the size of the resource base.
Colin Bennett

EIA: U.S. electric system interconnections - 2 views

  •  
    "In the United States, the power system consists of more than 7,300 power plants, nearly 160,000 miles of high-voltage power lines, and millions of low-voltage power lines and distribution transformers, which connect 145 million customers."
Colin Bennett

EIA Annual Energy Outlook Report 2012 - 0 views

  • The 252-page Annual Energy Outlook 2012, prepared by the U.S. Energy Information Administration, presents long-termprojections of energy supply, demand and prices through 2035, based on results from EIA’s National Energy Modeling System.
James Wright

Chile - Colada Continua Chilena plans to increase copper wire output by 40,000t - 0 views

  •  
    Colada Continua Chilena, the Chilean copper wire producer, plans to expand the production capacity of its Continua plant by 40,000t to 115,000t/y through the construction of two new production lines. The company anticipates that the first production line will commence operations by mid-2012, while the second is likely to follow 2-3 years later. Proposals have yet to be evaluated by the environment ministry but suggest that the cost of the project will be US$8M.