Skip to main content

Home/ qmstech2/ Group items tagged energy

Rss Feed Group items tagged

dpurdy

Geothermal Energy Construction: Resource Requirements and Impact Sources - 0 views

  • The construction phase involves the construction of the geothermal field(s), infrastructure, power plants, and transmission lines.
stewartlia99

Infrastructure - 0 views

    • stewartlia99
       
      infrastructure
charlesjos00

How Long Has Solar Power Been Around? | eHow - 1 views

  • August Mouchout is credited with the creation of the first active solar motor. In 1861, he developed a steam engine fueled completely by the sun.
  •  
    "Ever since ancient Romans installed glass and mica around their southern-facing door entrances, people have been finding ways to harness the power of the sun. From those origins, solar energy has slowly progressed into a viable source for powering your home. Other People Are Reading"
brownale99

How much more expensive is solar energy than fossil fuels - 0 views

  •  
    "Fossil fuel power stations typically cost about $2.1 dollars per watt to build solar stations around $7 at present. The efficiency is increasing and costs are falling. This of course does not represent the cost to the consumer. In addition it does not take into account all the various other costs and the advantages and disadvantages of each. Fuel (fossil stations), poor sunlight (solar stations). Maintenance costs are similar for single plants but solar stations do not have the capacity of fossil fuel stations."
glinbizzivic98

Geothermal Energy: Resource Exploration and Drilling Impacts - 1 views

  •  
    "Primary sources of noise associated with exploration include earth-moving equipment (related to road, well pad, and sump pit construction), vehicle traffic, seismic surveys, blasting, and drill rigoperations. Well drilling and testing activities are estimated to produce noise levels ranging from about 80 to 115 decibels at the site boundary. Air Quality Emissions generated during the exploration and drilling phase include exhaust from vehicular traffic and drill rigs, fugitive dust from traffic on paved and unpaved roads, and the release of geothermal fluid vapors (especially hydrogen sulfide, carbon dioxide, mercury, arsenic, and boron, if present in the reservoir). Initial exploration activities such as surveying and sampling would have minimal air quality impacts. Activities such as site clearing and grading, road construction, well pad development, sump pit construction, and the drilling of production and injection wells would have more intense exhaust-related emissions over a period of 1 to 5 years. Impacts would depend upon the amount, duration, location, and characteristics of the emissions and the meteorological conditions (e.g., wind speed and direction, precipitation, and relative humidity). Emissions during this phase would not have a measurable impact on climate change. State and local regulators may require permits and air monitoring programs. Cultural Resources Cultural resources could be impacted if additional roads or routes are developed across or within the historic landscape of a cultural resource. Additional roads could lead to increased surface and subsurface disturbance that could increase illegal collection and vandalism. The magnitude and extent of impacts would depend on the current state of the resources and their eligibility for the National Register of Historic Places. Drilling activities could result in long-term impacts on archeological artifacts and historic buildings or structures, if present. Surveys conducted during this phase
mcgarrdan98

Geothermal Energy: Construction Impacts - 0 views

  • Emissions generated during the construction phase include exhaust from vehicular traffic and construction equipment, fugitive dust from traffic on paved and unpaved roads, and the release of geothermal fluid vapors (especially hydrogen sulfide, carbon dioxide, mercury, arsenic, and boron, if present in the reservoir). Activities such as site clearing and grading, power plant and pipeline system construction, and transmission line construction would have more intense exhaust-related emissions over a period of 2 to 10 years. Impacts would depend upon the amount, duration, location, and characteristics of the emissions and the meteorological conditions (e.g., wind speed and direction, precipitation, and relative humidity).
  • Most impacts to ecological resources (vegetation, wildlife, aquatic biota, special status species, and their habitats) would be low to moderate and localized during the construction phase (although impacts due to noise could be high). Activities such as site clearing and grading, road construction, power plant construction, ancillary facility construction, and vehicle traffic have the potential to affect ecological resources by disturbing habitat, increasing erosion and runoff, and creating noise at the project site. Impacts to vegetation include loss of native species and species diversity; increased risk of invasive species; increased risk of topsoil erosion and seed bank depletion; increased risk of fire; and alteration of water and seed dispersal.
  • Solid and industrial waste would be generated during construction activities. Much of the solid waste would be nonhazardous, consisting of containers and packaging materials, miscellaneous wastes from equipment assembly and presence of construction crews (food wrappers and scraps), and woody vegetation. Industrial wastes would include minor amounts of paints, coatings, and spent solvents. Most of these materials would likely be transported off-site for disposal.
wellsann99

The Most Frequently Asked Questions about Wind Energy - 0 views

  • In 1997, U.S. power plants emitted 70% of the sulfur dioxide, 34% of carbon dioxide, 33% of nitrogen oxides, 28% of particulate matter and 23% of toxic heavy metals released into our nation's environment, mostly the air. These figures are currently increasing in spite of efforts to roll back air pollution through the federal Clean Air Act.
  •  
    wind power technology
behanjos99

Energy Resources: Geothermal power - 0 views

  • The big problem is that there are not many places where you can build a geothermal power station. You need hot rocks of a suitable type, at a depth where we can drill down to them. The type of rock above is also important, it must be of a type that we can easily drill through. Sometimes a geothermal site may "run out of steam", perhaps for decades. Hazardous gases and minerals may come up from underground, and can be difficult to safely dispose of.
wellsann99

Wind Energy America - FAQs - 0 views

shared by wellsann99 on 12 Mar 13 - No Cached
« First ‹ Previous 461 - 480 of 592 Next › Last »
Showing 20 items per page