Conflict in Quality Regulation of Distribution Utilities « HEAD, WIND, CANOE - 0 views
-
The conflicting objective in these regulatory documents is clear. One document, the PDC, specifies that the DUs must comply with PQ limitations per section 3.2 in all connection points. On the other hand, the Guideline points that only 95% of those connection points must be ensured by the DU to have PQ level in accordance with the PDC section 3.2.