Skip to main content

Home/ Electrical Power Quality/ Group items tagged philippines

Rss Feed Group items tagged

Hans De Keulenaer

Conflict in Quality Regulation of Distribution Utilities « HEAD, WIND, CANOE - 0 views

  • The conflicting objective in these regulatory documents is clear. One document, the PDC, specifies that the DUs must comply with PQ limitations per section 3.2 in all connection points.  On the other hand, the Guideline points that only 95% of those connection points must be ensured by the DU to have PQ level in accordance with the PDC section 3.2.
1 - 1 of 1
Showing 20 items per page