Skip to main content

Home/ Architecture:General/ Group items tagged clash detection

Rss Feed Group items tagged

Hi-Tech iSolutions LLP

BIM for Clash Detection and Risk Analysis Streamlines the Construction Process - 0 views

  •  
    BIM has a distinctive ability to identify clashes, interventions and omissions before the construction work starts. BIM software like Navisworks simulates clash detection to allow assessment of risks, and plan mitigation strategies during the development process.
Hitech CADD Services

3 Types of 3D BIM Clash Detection: Have Their Own Importance - 0 views

  •  
    Mep Clash detection helps in detecting and solving clashes much before the actual construction begins and minimizes cost, effort and time. Read for more information.
Hi-Tech iSolutions LLP

NAVISWORKS for BIM coordination from initial model to federated BIM model - 0 views

  •  
    Achieving BIM coordination by detection of clashes in a CDE helps in improving better outcomes and the contractors and BIM leaders stay well-informed.
Hi-Tech iSolutions LLP

3D MEP Coordination: For Smooth Construction Process. - 0 views

  •  
    BIM is the digital representation of a construction process and beyond. It ensures that all the data that is crucial to run a facility smoothly is accumulated throughout the design and construction process.
Hi-Tech iSolutions LLP

How BIM will support UAEs Infrastructural competitiveness globally? - 0 views

  •  
    BIM offers coordination tools that let architects, structural and MEP engineers deal with a venture all the more viably. For instance, by working with the same model as a base, MEP specialists can format their frameworks around the structural model, enhancing coordination. A standout amongst the most valuable instruments accessible is clash detection, which is an incredible approach to diminish blunders via naturally checkingcollisions or interferences between the structural system and the ducts and plumbing systems.
Hi-Tech iSolutions LLP

Waterproofing Failures - Architects, Engineers or Contractors, who is responsible? - 0 views

  •  
    Waterproofing is expected to be strong as long as building stands. But once waterproofing is damaged, the impact in form of cost and damaged it has on the facility, is unexplainable. The cost of mending it again is twice the cost of waterproofing.
Hi-Tech iSolutions LLP

Building Information Modeling (BIM) paves path for District Information Modelling (DIM) - 0 views

  •  
    In the near future, the BIM era is likely to make way for District Information Modelling (DIM). To pave the path for others, Europe has undertaken projects involving multi-disciplinary teams from multiple nations with participants from diverse backgrounds including architecture, engineering, philosophy, politics, sociology and geography.
Hi-Tech iSolutions LLP

AEC Firms aspiring to be a Fortune 500 company should Adopt BIM - 0 views

  •  
    AEC firms aspiring to grow need to understand that growth is never by mere chances. Instead, to get in to the list of Fortune 500 companies, they will have to put in rigorous efforts in the right direction. The architectural engineering and construction industry has realized that adopting BIM can and has certainly driven a lot of AEC firms towards success.
Hi-Tech iSolutions LLP

BIM Data Sharing is for Transparency, but will it succeed? - 0 views

  •  
    BIM can contribute in bringing transparency between all stakeholders. The root of BIM is "the single source of truth", and the industry recognizes that information transparency is more than important, than ever. But the truth is that it's a collective practice, where stakeholders look at it in their own commercial interest.
Hi-Tech iSolutions LLP

Australia Should Adopt Pre-fabrication to Address their Housing Affordability Issue - 0 views

  •  
    In the midst of Australia's housing affordability issue, prefabricated homes offer a solution. Experts believe that prefab housing is likely to decrease the cost of a new habitant by at least 10 per cent (excluding the purchase cost of land). Case studies of UK show savings of up to 10% to 15% in building costs and a 40% reduction in construction timelines. Manufacturing is more efficient, and factories don't lose time due to bad weather.
1 - 10 of 10
Showing 20 items per page