Yuval Yeret

Agile PMO Role - 0 views

  • Institute an agile transition team, and have the agile PMO play a significant role on that team. If you are starting on the journey, establishing an agile transition team can be a critical factor in your success. The agile transition team plans and implements the strategy for the organization’s agile transition (using a backlog, iterations, planning meetings, retrospectives and, in general, responding to change) This group monitors and communicates results throughout the organization, and is responsible for removing organizational level impediments. The PMO representative can act as ScrumMaster for the agile transition team. Members should be leaders representing different departments and functions that are impacted by the agile transition. For example, having leaders from development, QA, product development and the PMO is an excellent practice.
  • Establish a “Meta Scrum” that is tasked with mapping projects and features to corporate strategy. As part of optimizing the whole, it is important for there to be a big picture view across products and features. In general, product managers are tasked with defining, prioritizing and communicating the vision and features for their products. When you have a program that encompasses multiple products with multiple product owners and project teams, keeping everything in line with the corporate vision can sometimes be overlooked.   Unlike the Scrum of Scrums--which is tactical, i.e. focused on execution--the Meta Scrum is focused on the strategic planning and decisions guiding the program or programs as a whole. Establishing a Meta Scrum with the PMO representative acting as ScrumMaster to plan and facilitate meetings (as well as reporting and tracking decisions and action items) can add significant value in having a program able to rapidly respond to change while staying true to the corporate strategy and objectives.
  • I like using story points to establish the velocity of individual teams. From a program point of view, however, story points are difficult to use across multiple teams. The nut there is that one team’s story point is not equivalent to another team’s story point. To crack that nut, I use agileEVM to “normalize” to standard project management metrics like the Cost Performance Index and the Schedule Performance Index, as well as the Estimate At Complete in integrated dollars. These metrics can be aggregated across teams to establish progress against the plan for the entire program.
  • ...1 more annotation...
  • Establish an agile CoachingCenter. It is important from an organizational perspective to continue to provide coaching and training to agile teams. Team development and facilitation needs continue after the initial shift to agile methods is completed. In addition, new team members are hired, new practices discovered and implemented. Establishing an agile coaching center of excellence can meet this need.   In order to be successful, the center needs to be a legitimate organization with an assigned budget, staff and objectives. The center can be a located within the agile PMO. The center can develop and manage a central agile library, produce various lunch ‘n’ learns and other programs to infuse agile values and knowledge across the organization, and provide proficient, independent facilitators to teams for various retrospectives and other needs. In addition, the center can help the team gather metrics on their agility and health so that the team can take action if the decide to.
Yuval Yeret

How Google Sold Its Engineers on Management - 0 views

  • A good manager: 1. Is a good coach 2. Empowers the team and does not micromanage (See the sidebar “How Google Defines One Key Behavior”) 3. Expresses interest in and concern for team members’ success and personal well-being 4. Is productive and results-oriented 5. Is a good communicator—listens and shares information 6. Helps with career development 7. Has a clear vision and strategy for the team 8. Has key technical skills that help him or her advise the team
  • Employees with high-scoring bosses consistently reported greater satisfaction in multiple areas, including innovation, work-life balance, and career development
  • high-scoring managers saw less turnover on their teams than the others did—and retention was related more strongly to manager quality than to seniority, performance, tenure, or promotions
  • ...1 more annotation...
  • The key behaviors primarily describe leaders of small and medium-sized groups and teams and are especially relevant to first- and second-level managers. They involve developing and motivating direct reports, as well as communicating strategy and eliminating roadblocks—all vital activities that people tend to overlook in the press of their day-to-day responsibilities.
Yuval Yeret

Ideal Training for Enterprise-Scale Agility? « Scaling Software Agility - 0 views

  • training strategy for a significant enterprise that is contemplating an “all in” (immediate and across the entire company) enterprise scale transformation approach
  • for the enterprise, a combination of team-based and role-based training that would touch every practitioner is ideal
  • all team practitioners receive a minimum of two days of agile training, (agile team training for the each team in the enterprise)
  • ...11 more annotations...
  • an additional day or so of training for specialized roles of Product Owner, Project/Release Manager, and Agile/Scrum Master
  • All other executives and managers are invited to attend an overview course on scaling software agility
  • Agile for Teams –Essential, team-based training in a two day workshop
  • philosophy, principles, and benefits of agility, agile methods, iterative and release framework, roles, agile technical practices, and agile management practices (Scrum)
  • Agile Release and Project Management at Enterprise Scale – For Project Managers, Release Managers, Program and Portfolio Managers who have responsibility for helping deliver the product(s) to the marketplace. Topics include differences between traditional and agile product management, iteration framework, multi-level release planning and tracking, the agile release train, planning and executing the release planning event, and measuring enterprise progress.
  • Agile Product Owner in the Enterprise – For team-based product owners/candidates who will become responsible for backlog management, story writing, and iteration and release planning, and who will also be involved in the planning and coordination of larger scale software systems of systems built by teams of teams.
  • The Agile Master In The Enterprise – For potential agile team leads/future Scrum Masters who will be coaching agile teams and who will interact with other teams as well. Topics include: process facilitation, enterprise agility, mastering the iteration, team roles, release planning and tracking, agile leadership, empowerment and conflict management, and integration Scrums.
  • Agile Product Manager in the Enterprise – For enterprise product managers with product, product line, portfolio and business unit responsibilities. Topics include: what’s so different about agile, backlog and prioritization, relationship to product owners, PM’s role in release planning and management, visioning and the product roadmap.
  • Scaling Software Agility – Best Practices for Large Enterprises – For executives and key stakeholders in support, distribution, quality, internal IT, HR and all others whose roles will be impacted by the substantive changes that enterprise agile engenders. Part I – overview of agility highlighting lessons learned from the most common and effective agile methods Part II – seven team best practices of agility that natively scale to the enterprise level Part III – seven organizational capabilities that companies can master to achieve the full benefits of enterprise scale agility
  • The team member doesn’t need a CSM course, but he does need to know how to work in an agile environment.
  • what are the engineering practices need to support agile development? I’ve found that if developers only have their existing tools and practices, then they will continue to specify and develop waterfall-style within the sprints.
Yuval Yeret

InfoQ: Ensuring Success for Self Organizing Teams - 0 views

  • Helicopter Managers – who step in too soon to rescue thereby depriving the team to think and solve problems together.
  • Absentee Managers – who would not step in at all irrespective of whether the team has all the necessary skills to tackle the problem.
  • If the team has sufficient skills to solve the problem then give them space else ask questions to help them get unstuck. This would help in building the skills eventually.
  • ...7 more annotations...
  • When time is not of the essence give the team time to work the issue. This would improve the team feeling and collaboration.
  • If the solution space is limited in scope and impact, or the decision is reversible, give the team space to solve the problem, even it there's a good chance they'll get it wrong the first time.
  • Tolerate mistakes and allow time for learning – management should not jump in at the first problem. They should allow the team to learn from their mistakes and take corrective action on their own.
  • Clearly define the boundaries – Without this the team is lost on how much they can manage themselves and when should they invoke management help. Without the definition of boundaries, teams err on side of caution and do not take any decision without seeking permission.
  • Keep the team challenged, yet not frustrated- The manager should be aware of the team’s skill level and limitations. He should be able to provide the team with enough challenges to keep them in a state of learning and growth.
  • emphasis on the balanced involvement of management with the team
  • It is important for the managers to be aware of the skill level of the team to step in or stay back at the right moment and act as a catalyst for the team to reach a state of self organization
Yuval Yeret

Negotiation Tactics - 0 views

  • In negotiation, there are many tactics that you may meet or use. They can be fair, foul or something in between, depending on the competitive or collaborative style of the people involved and the seriousness of the outcomes.
  • Behavior Labeling
  • Cards on the Table: State your case, clearly and completely.
  • ...3 more annotations...
  • Go For A Walk: Take time out to change.
  • Fair Criteria: Set decisions criteria such that is is perceived as fair.
  • Expanding the Pie: Ensuring there's more for everyone.
  •  
    Cards on the Table:
Yuval Yeret

How Is Kanban Different From Other Approaches? « AvailAgility - 1 views

  • Scrum places more emphasis on the project management practices. Kanban, places its emphasis on business and value flow practices.
  • its all the same elephant, but each approach has a different view of it. At the end of the day, its having the most appropriate elephant for any given context that is most important.
  • Kanban can be differentiated by identifying its Primary and Corollary Practices.
  • ...6 more annotations...
  • Map the Value Stream
  • Visualise the Work.
  • Limit Work in Progress.
  • A Kanban approach will explicitly limit work in progress. This is distinct from managing work in progress through the use if time-boxes
  • Establish a Cadence.
  • A Kanban team will almost certainly use Corollary Practices which may be considered Primary in another process. For example, a high performance Kanban team will inevitably use technical practices from XP, such as TDD and Continuous Integration.
Yuval Yeret

מועדים - 0 views

  • Design of Distrib. & Multi-Core Systems & SoftwareDuration: 2d; Start dates:21/02/2007; 04/
  • Embedded Linux BasicsDuration: 3d; Start dates:19/03/2007; 20/05/2007;
Yuval Yeret

Agile Product Manager in the Enterprise (5): Responsibility 3 - Maintain the ... - 0 views

  • The Roadmap consists of a series of planned release dates, each of which has a theme and a prioritized feature set.
  • While it is a simple thing mechanically to represent the Roadmap, figuring out the content for anything beyond the next release is another matter entirely. The topic of what else the team plans to ship and when can be a fascinating and contentious topic in agile
  • the easiest way to think about the Roadmap is that it is an output, rather than an input to the Release Planning process.
  • ...5 more annotations...
  • The dates and themes for the next release are fixed. The features are prioritized and variable.
  • The teams can commit only to the features in the next upcoming release. Releases beyond the next, represent only a best estimate.
  • The Roadmap, then, is a “plan of intent” and is subject to change as development facts, business context and customer needs change. With respect to the upcoming release, perhaps the most important guidance is this:
  • Even though the team has committed to the objectives and we have agreed that the feature set cannot be guaranteed, it is a reasonable expectation that the agile teams will: 1) meet the date 2) accomplish the theme 3) deliver most of the features, and certainly the highest priority ones, with the requisite quality.
  • Anything less would be unprofessional and belie the power, discipline and accountability of our agile enterprise model. Moreover, it will eventually threaten our own empowerment, as failure to deliver will inevitably cause the implementation of various controls to “help us”!
Yuval Yeret

Company-Wide Business Agility and the Soviets - 0 views

  • Tom Grant, a Forrester analyst who covers agile and product management, brought early results of his research on business agility to P-Camp. He has divided technology companies into An agile "vanguard" implementing first-wave improvements in their software development models, and Agile "transformation" companies making broad corporate-wide improvements in understanding customers and cross-departmental coordination.
  • "the end of Soviet-style development." He reminded us that Soviet five-year plans had little to do with the reality of hungry Russians and empty store shelves. In the same vein, technology companies with top-down command-and-control waterfalls tend to be unresponsive and overly optimistic. They often lack good market-sensing mechanisms or useful bottoms-up development metrics, so they routinely deliver unexciting products later than planned.
Yuval Yeret

Kanban development oversimplified: a simple explanation of how Kanban adds to the ever-... - 0 views

  • It’s a lot easier to estimate a story that’s small — which can lead to more accurate estimates, and better predictability.
  • It’s easier to plan with smaller stories. With big stories — stories that might take weeks for a developer to implement — it becomes difficult to plan a development time-box — particularly when the iterations are only a couple of weeks. It seems that only a couple stories fit — and there’s often room for half a story — but how do you build half a story? Splitting them into smaller stories makes it easier to plan those time-boxes.
  • Shrinking stories forces earlier elaboration and decision-making. Where product owners could write their stories fairly generally and consider many of the details later, now breaking them down into smaller stories forces more thinking earlier in a planning lifecycle.
  • ...36 more annotations...
  • Managing little stories forces us to keep better track of how they fit together. Product owners are often asked to break down stories to a level where a single story becomes meaningless. To keep track of what’s meaningful to them and other stakeholders, they often need to keep track of bigger items such as the features of the product and how many stories contribute to building up that feature.
  • The result of these herniated time-box activities is a cycle that’s actually 3-4 times longer than our time-box. To get work done, we’ll use a time-box to elaborate stories, one to develop them, another to more thoroughly test them, and if there are bugs, possibly another to fix them.
  • During an ideal Agile time-box we’ll have frequent discussions between developers, testers, and those on a product owner team — like business analysts, user experience people, and business people. We’ll do this to understand what we need to build and describe what we’ll do to validate the story was really done. When time-boxes are short, there’s less time for this conversation. It’s common to move many of the conversations to detail the story and describe acceptance to the time-box before so we can be ready to really get moving with development when the time-box starts.
  • It’s difficult to fit thorough validation of the story into a short time-box as well. So, often testing slips into the time-box after. Which leaves the nasty problem of what to do with bugs� which often get piped into a subsequent time-box.
  • Anyone who’s attended an Agile planning meeting knows they can often last about an hour longer than you can stand it
  • As time-boxes shrink those on the product owner team and testers find themselves in a constant mode of getting ready for a next time-box and evaluating past time-boxes
  • work long hours, attend lots of meetings, and seem to have less time to be available to help developers with the current time-box. Since their focus is on a future or past time-box, questions about this time-box seem like interruptions. Collaboration decreases and tensions increase. Their work load is heavy, bumpy, not smooth or even.
  • Kanban cards are used to limit the amount of inventory the factory builds. It doesn’t do the Toyota factory any good to build doors faster then they can assemble cars. It just wastes money on excess doors, and parts of doors. Excess work in progress is considered to be waste in Lean manufacturing. (It’s probably waste in non-Lean manufacturing too.) In the above completely made up example, you’ll never have more than 15 finished doors hanging around. (Mudha is Japanese for waste. Learn it to impress your Lean friends.)
  • “Kan” means visual, and “ban” means card or board.
  • Kanban thinking in software development attempts to do a similar thing. We want to limit unnecessary work in progress to be no higher than it needs to be to match the throughput of the team.
  • In Kanban development: time-boxed development is out stories are larger and fewer estimation is optional or out completely velocity is replaced by cycle time
  • Exactly what’s left of Agile if we get rid of time-boxes, change the meaning of stories, and stop measuring velocity. And, exactly what do car doors and Kanban cards have to do with software development? Don’t get hung up on process. Remember, agile development isn’t a process.
  • You might have a column where business analysts spend time tracking down technical details that developers need to understand to write code.
  • These columns aren’t set. You should discuss with your team the phases that stories go through to be completed. Some organization may use columns for writing documentation, or preparing customer service people to support the feature in production.
  • The top is used for stories currently in progress in that phase. The bottom is the buffer. When work for that phase of the story is completed, it moves from “in progress” to the “buffer” where it’ll wait to be pulled into the next phase.
  • When we set limits for work in progress, we’ll set a total number for the process step that includes both “in process” and the “finished buffer” for that process step.
  • Stories must be minimal marketable features
  • To be marketable the feature needs to be large enough to be useful — probably larger than the teeny stories that take a couple days to build and seem to be best practice in Agile development today. A MMF may take weeks to build. But the important thing isn’t how long it takes to build, but that it be understandable and valuable to those who’ll receive it. To identify a MMF some folks ask the question “Would I announce it in my company’s product blog?” If it’s too tiny to mention, then it’s not a MMF.
  • To be lean, we’ll limit the number of stories we allow onto the board. A common formula is to add up all the members of the team in all roles and divide by two. All roles includes developers, analysts, user interfaced designers, testers, deployment people — anyone immediately responsible for getting features to market. For example, if team members total 20, we might limit the number of MMF-style stories on the board to 10.
  • Today developers have finished a story, and s they walk to the Kanban board to move it out of development, they notice their single buffer slot is full — and the “testing in progress” column is filled to its limit. What now? The developers talk to the testers. “We’re really struggling to keep up here. It’ll be till tomorrow morning before we can get some of these stories moved out.” “Hmm�” says a developer “Can we help test?” “Of course you can!” says the tester. “With your help we can get these cleared out by the end of the day.“ The tester grins “I just don’t want you validating a story you implemented.”
  • For the limits of the story process steps, the limit is often half the number of people that can perform the work for that phase of development. For instance if you have 6 developers, you might limit the development in progress column to 3. Now, this will force developers to work together on stories. I do find in practice that this may not work out for all teams — so I often see limits that equal the number of developers (or those that can perform the process step) or often 1.5 * the number of people in a role. Of course if you do this, it’ll raise the overall work in progress — and as you might expect, items will take longer to finish.
  • When a column in a Kanban board is full, we know that group is at capacity. We also know that if this keeps happening that that process step is likely where a bottleneck is.
  • If you’ve ever waited in line for the Pirates of the Caribbean in Disneyland you might remember signs along the way that say “Your wait time from here is 30 minutes” — something like that. Now you can post your own wait times on your Kanban board. At the bottom of your story queue post the average cycle time with wait time. It’ll say something like “Your wait time for a story here is approximately 18 days.” At the top of the queue post the average working cycle time. It might say “your wait time from here is 14 days.”
  • When you place focus on how quickly you can get functionality done, and have the ability to measure just that, then the estimates don’t much matter. In fact, many using a Kanban approach have simply stopped estimating at all. Yes story sizes vary, but being able to give a wait time plus or minus a few days is sufficient for many organizations’ concerns.
  • But, since there’s no development time-box in Kanban development, we’ll measure story-by-story how long they took to complete — the “cycle time” of the story.
  • Some do still estimate stories. Then use those estimates in conjunction with cycle time. Using a spreadsheet we can calculate the average cycle time for stories with a given estimate. If you do this, consider placing a handy chart next to your Kanban board showing estimate in one column, and wait times in adjacent columns. With this you’re answering the real question stakeholders are asking for when they get estimates: “when am I going to see this functionality in the software?”
  • If your stakeholders are like mine, they don’t want to know when they’re going to get this functionality, the want to know when they’re going to get all this functionality. I find that if I place stories into a spreadsheet with start and end dates, and calculate cycle time, if I select an arbitrary time period — say a two or three week time period — I can see how many stories where completed during this time period. For instance I might see the team finished 22 stories in 3 weeks — that’s about 7.3 stories per week. Given a backlog of 100 stories I can reasonably infer that it’ll take between 13 and 14 weeks (100/7.3). That’s yesterday’s weather for Kanban — at least the way I calculate it.
  • If I know that during three week time period there where 15 working days and that 5 developers worked the entire time, that’s 75 developer days. Knowing that lets me calculate the average number of developer days per story: 3.4 (75/22) — Which is darn close to pi — which makes me believe it has to be right. ;-) This number, 3.4, is what XP practitioners referred to as load factor.
  • Evaluation cycles, not development time-boxes
  • The only difference is the cycles aren’t used to plan and commit to stories any longer.
  • The daily standup or daily scrum meeting occurs as normal, but now it occurs in front of the Kanban board. Instead of the regular meeting ritual of checking in with each person to find out what they worked on yesterday and will work on today, the discussion revolves around the Kanban board and what will likely move on and off the board today, where “traffic” seems the heaviest, and what we could do to clear bottlenecks.
  • Reflect every few weeks
  • Lean practices help teams increase throughput. They don’t make developers type faster, rather they draw attention to bottlenecks that slow things down, help you see them and respond to them quicker. Using a Kanban board lets you easily visualize work in progress across different roles and lets you see when someone is taking on too much work simultaneously.
  • Demonstrate every few weeks
  • A task board as it’s commonly used in an agile approach can give you the visualization too. But, widening the task board to separate testing from development from acceptance or other process steps helps me better visualize where things are clogging up — helps me better diagnose problems. And, setting hard limits for process steps and respecting them really makes me deal with the problem in a way that dropping a pile of stories into a sprint or iteration didn’t. But, maybe it’s just me who’s lazy and avoids dealing with tough problems. I’m sure you’d never run into a situation where you and your team let lots of finished development work pile up waiting to be tested.
  • There’s no one as zealous as the newly converted There’s a lot of folks pretty excited about Kanban out there. I am too. Sometimes that zeal takes the form of telling people practicing common agile time-boxed development that they’re wrong. But, I guess I’m crusty enough to know that there’s lots of right ways to succeed and anyone who believes they’ve found the best ways is likely wrong. Don’t let those voicing opinions strongly for, or against, Kanban approaches stop you for digging in deeper and understanding the ideas behind it.
  •  
    one of the best articles about Kanban and its relation to Agile I've encountered so far - focusing on Feature development (not maintenance)
Yuval Yeret

James Shore: The Art of Agile Development: Incremental Design and Architecture - 1 views

  • when you first create a design element—whether it's a new method, a new class, or a new architecture—be completely specific. Create a simple design that solves only the problem you face at the moment, no matter how easy it may seem to solve more general problems
  • Waiting to create abstractions will enable you to create designs that are simple and powerful.
  • The second time you work with a design element, modify the design to make it more general—but only general enough to solve the two problems it needs to solve. Next, review the design and make improvements. Simplify and clarify the code. The third time you work with a design element, generalize it further—but again, just enough to solve the three problems at hand. A small tweak to the design is usually enough. It will be pretty general at this point. Again, review the design, simplify, and clarify. Continue this pattern. By the fourth or fifth time you work with a design element—be it a method, a class, or something bigger—you'll typically find that its abstraction is perfect for your needs. Best of all, because you allowed practical needs to drive your design, it will be simple yet powerful.
  • ...12 more annotations...
  • This is difficult! Experienced programmers think in abstractions. In fact, the ability to think in abstractions is often a sign of a good programmer. Coding for one specific scenario will seem strange, even unprofessional.
  • Continuous Design Incremental design initially creates every design element—method, class, namespace, or even architecture—to solve a specific problem. Additional customer requests guide the incremental evolution of the design. This requires continuous attention to the design, albeit at different time-scales. Methods evolve in minutes; architectures evolve over months. No matter what level of design you're looking at, the design tends to improve in bursts. Typically, you'll implement code into the existing design for several cycles, making minor changes as you go. Then something will give you an idea for a new design approach, requiring a series of refactorings to support it. [Evans] calls this a breakthrough (see Figure). Breakthroughs happen at all levels of the design, from methods to architectures.
  • Don't let design discussions turn into long, drawn-out disagreements. Follow the ten-minute rule: if you disagree on a design direction for ten minutes, try one and see how it works in practice. If you have a particularly strong disagreement, split up and try both as spike solutions. Nothing clarifies a design issue like working code.
  • Risk-Driven Architecture Architecture may seem too essential not to design up front. Some problems do seem too expensive to solve incrementally, but I've found that nearly everything is easy to change if you eliminate duplication and embrace simplicity. Common thought is that distributed processing, persistence, internationalization, security, and transaction structure are so complex that you must consider them from the start of your project. I disagree; I've dealt with all of them incrementally [Shore 2004a]. Two issues that remain difficult to change are choice of programming language and platform. I wouldn't want to make those decisions incrementally!
    • Yuval Yeret
       
      Possible exercise - Try to come up with various things that are risky to YAGNI. And then order them according to level of risk. Use the examples here to seed the list
  • Limit your efforts to improving your existing design
  • To apply risk-driven architecture, consider what it is about your design that concerns you and eliminate duplication around those concepts
  • Your power lies in your ability to chooose which refactorings to work on. Although it would be inappropriate to implement features your customers haven't asked for, you can direct your refactoring efforts towards reducing risk. Anything that improves the current design is okay—so choose improvements that also reduce future risk.
  • design is so important in XP that we do it all the time
  • Don't try to use incremental design without a commitment to continuous daily improvement (in XP terms, merciless refactoring.) This requires self-discipline and a strong desire for high-quality code from at least one team member. Because nobody can do that all the time, pair programming, collective code ownership, energized work, and slack are important support mechanisms.
  • Test-driven development is also important for incremental design. Its explicit refactoring step, repeated every few minutes, gives pairs continual opportunities to stop and make design improvements. Pair programming helps in this area, too, by making sure that half of the team's programmers—as navigators—always have an opportunity to consider design improvements.
  • Alternatives If you are uncomfortable with XP's approach to incremental design, you can hedge your bets by combining it with up-front design. Start with an up-front design stage and then commit completely to XP-style incremental design. Although it will delay the start of your first iteration (and may require some up-front requirements work, too), this approach has the advantage of providing a safety net without incurring too much risk.