Using a Task Board with One Remote Team Member | Mike Cohn's Blog - Succeedin... - 0 views

  • Try to get the one person to move to where the rest of the team is.
  • Having one remote is a cost that must be borne by the full team. For the right person, it’s easily worth it. But sometimes, the person who is remote has not special skills, knowledge or experience to justify the added hassle.
  • continue to use the physical task board–it is simply too beneficial to the collocated team members to give it up in favor of a product backlog tool, especially if team members are already used to it and like it.
  • ...3 more annotations...
  • The remote person in this case could identify during the daily Scrum what he or she will work on and not need further interaction with the task board until selecting the next task. Here, the remote person doesn’t really interact with the task board at all and interacts only with the team. Not ideal as I’d like the person to see the tasks, but this can work in some situations.
  • more common is for the ScrumMaster to take on the responsibility of updating an electronic version that mirrors the physical task board
  • One good way of minimizing the time the ScrumMaster spends doing this is to mark the cards on the physical task board. The mark indicates “I’ve updated this task. Please update it in the online task board.” I like to use Post-It flags for this
Yuval Yeret

Scrum Log Jeff Sutherland: The Managers Role in Scrum - 1 views

  • managers handle 'external stuff' to the team
  • ontract negotiations and procurement.
  • he role that a line manager plays in an employee's personal and professional development, often in the form of coaching or assisting in HR-related issues
  • ...11 more annotations...
  • - (1) Provides organizational vision- (2) Removes impediments- (3) Assists with individual development- (4) Challenges team beyond mediocrity while respecting team boundaries- Helps individuals without sucking the responsibility out of the team- Balances observer and contributor roles- Gives individuals tools to be a great team member- Coaches teams through conflict resolution- Advocates for continuous improvement for teams and the organization at large- Buys things for the team (manages budget)- Provides the right environment- Manages portfolio of projects
  • 1. Providing organizational vision: Often teams flail because there is no vision 'from on high'. Having this vision is important for team members to be able to relate their daily actions.
  • manager's role in this process to remove escalated impediments from the team(s).
  • provide strategic vision, business strategy, and resources
  • 3. Assists with individual development: We all have managers who mentor us in professional and sometimes personal growth. We felt that this is an important role for the manager to continue to play. Not all scrummasters have the authority or expertise to help in this regard.
  • a manager role would be like a 'ScrumMaster on steriods'- a person whose job it is to remove all escalated impediments for the team, take care of external stuff to the team, lead the team by challenging it, and assists direct reports with individual development and other HR-related challenges.
  • CMMI Level 5 Requirement 2.4.10 Review the activities, status, and results of the Agile Methods with higher level management and resolve issues (GP2.10)
  • ensure that higher level management has appropriate visibility into the project activities.
  • The principle of self-managed teams would say "let them be; let them find their own way." A principle of leadership, however, is to challenge teams. We discussed the fine line between challenging teams and taking away their ability to self-manage.
  • Jens Ostergaard
    • Yuval Yeret
       
      my CST...
Yuval Yeret

tips on reviving retrospectives from the retrospectives yahoo group - 0 views

  • Has the team made changes that make a difference to them as a result of the retrospective?
  • Has the team explored a variety of different topics/areas, or do they stick to pretty much the same agenda around continuous improvement? What is the balance of change/improvement work vs. working on the product?
  • For example, try looking at technical practices, teamwork, or customer relationships... choose what ever seems most relevant to bound the discussion. That might help the team dig deeper and find issues that have more significance for them (now...I'm sure the other changes were significant at the time).
  • ...14 more annotations...
  • Try a 'speed retrospective'. How quickly can the team get together and find one good, solid improvement to make? Make it exciting and use a stopwatch. I wouldn't do this all the time, but again, what harm to try it once?
  • How about one retrospective where you set yourselves the challenge of generating actions from the "What did we do well" column? In other words, find an action designed to magnify an existing positive rather than remedy an existing negative.
  • How about a 'Show and Tell' retrospective where every team member comes to the meeting with an action item and its explanation already prepared? The retrospective would really be each person presenting their idea in turn.
  • How about a retrospective wherein you challenge yourselves to come with a new approach to retrospectives that is so exciting that people would skip other work activities to attend?
  • I find it very important to revisit the outcome of the past retrospective and celebrate the things the team had been able to do differently.
  • The major thing is to make the changes visible and memorizable for everyone and not assuming that people remember what they decided on in the last retro.
  • Another thing is that I would invite team members to take turns in facilitating the retro. So not always the same person runs the retro (this typically also changes the format and techniques a bit).
  • - Heartbeat Retrospective (google for Boris Gloger)
  • - Temperature Reading
  • - Team Radar Chart
  • - Our project / team / product ship - draw a ship on a flip chart, ask the team what moved the ship forward, what blocked it
  • Just to add a totally different direction: I've made good experiences with having a *long* retrospective every few months. The short retrospectives are great to see the trees and optimize the daily work. A two or even three day retrospective helps the team to step back and watch the forrest instead.
  • It is important to get at least one item done every sprint. If you do the retro, but don't implement any of the actions, this is a tremendous demotivator. Better one thing finished that you can celebrate than 5 unfinished things in the queue.
  • Variety is the spice of life, so some variation is essential to keep the freshnees. Change the moderator, do technical focus once, then organisational, then "improving the fun factor", then go back to a general retro.
Yuval Yeret

Tailor your Message To Gain Support for your Agile Initiative | Enabling Agility - 0 views

  • Connect Agile’s Benefits to your Company’s Priorities
  • aying that Agile is “better, faster, cheaper” may not be enough to cause a company to be willing to go through the often-painful process of cultural and process change.  You could implement Agile, but you could also try Six Sigma or Lean.  Saying that Agile is a general get-better remedy puts it in line with many other get-better methods.
  • f they don’t see a meaningful update from us, at least once a quarter, we’re going to get kicked out of the game.  We’ve all acknowledged that as we’ve gotten bigger, our processes have become more cumbersome and now is the time to do something about it.  Agile will give us the ability to regain that rapid pace of delivering innovations to market that we were know for in our early days.”
  • ...21 more annotations...
  • ur last two releases have looked like me-too updates, where we are just barely keeping up with our competitors
  • We’ve been losing market share
  • If you can refer to a specific business issue and show the linkage, you are much more likely to get a receptive audience.  Here’s an example.
  • The CFO, developer and QA manager have different roles in the organization and their needs are different.  If you want to enlist their support, be sure you know who you are talking to and what they value.
  • Use Focused Messages for Key Individuals or Groups
  • certain volume of people who are enrolled in the idea of Agile before you’ll see adoption start to accelerate,
  • People have specific needs in their role and they want to understand how Agile will affect and benefit them directly.  
  • Developers, on the other hand, probably wants to know if they will have interesting work, the opportunity to learn new things and the ability to make an impact on the company’s products.
  • a QA manager is probably interested in hearing how Agile helps enrich the QA profession.
  • The focus isn’t on Agile, its on business, as it should be.
  • The easiest way to find out what interests someone is to ask them.  When you meet, leave plenty of time for talk.  Motoring through a well-rehearsed Agile presentation usually doesn’t work.  A lot of times I’ll have slides with me, but they are a backdrop for the conversation.  I’ll refer to slides when it helps move the conversation along, but otherwise don’t use them.  You might want to forget slides altogether and just draw things on a whiteboard as necessary.  This technique is particularly useful with an individual or a small group.  
  • Take it One Step Further: Collect Data to Gain Insight
  • you’ll be most effective tailoring your message if you invest some time conducting data through a series of structured interviews. 
  • First, you’ll need a small set of questions prepared for the interviews.  Here are some examples. What is working with our current methodology? What’s not working with our current methodology? How do you think Agile would help our organization? What concerns do you have about Agile?
  • Interview a wide range of people: developers, testers, business analysts, managers, product managers, senior management, project managers and someone from finance. 
  • When you conduct the interviews, it is good to have one interviewer who has the primary responsibility for talking and the other person who has the primary job of taking notes.  You can switch off roles each interview so no one person gets stuck in either role.  Here’s how I typically start off.  
  • stories that people tell about the organization and make sure you write them down
  • I put all of the information we’d gathered into a mind-mapping program (Mindjet) and grouped like things together.
  • Make sure you keep interesting stories intact.  Specifics will help you make your cases
  • When there’s numerical data, people engage with a presentation in an entirely different way than they do when there are stories.  I find stories more effective, but do what works for you.
  • As an Agile evangelist, you job is to get Agile deployed effectively.  Along the way there are many people will be willing to go out of their way to help if you effectively speak to their interests and concerns.
Yuval Yeret

How Google Sold Its Engineers on Management - 0 views

  • A good manager: 1. Is a good coach 2. Empowers the team and does not micromanage (See the sidebar “How Google Defines One Key Behavior”) 3. Expresses interest in and concern for team members’ success and personal well-being 4. Is productive and results-oriented 5. Is a good communicator—listens and shares information 6. Helps with career development 7. Has a clear vision and strategy for the team 8. Has key technical skills that help him or her advise the team
  • Employees with high-scoring bosses consistently reported greater satisfaction in multiple areas, including innovation, work-life balance, and career development
  • high-scoring managers saw less turnover on their teams than the others did—and retention was related more strongly to manager quality than to seniority, performance, tenure, or promotions
  • ...1 more annotation...
  • The key behaviors primarily describe leaders of small and medium-sized groups and teams and are especially relevant to first- and second-level managers. They involve developing and motivating direct reports, as well as communicating strategy and eliminating roadblocks—all vital activities that people tend to overlook in the press of their day-to-day responsibilities.
Yuval Yeret

From the Agile Transformation Trenches: Culture Change with Pigs, not Chickens - 0 views

  • Identify the technical leaders within projects; those that are “self-driven to produce quality results on time … combine technical ability with enough people skills …are trusted and respected by both their managers and fellow developers, are determined to make the team succeed, and usually live the work.” (Chief programmers, Chapter 2:  A Practical Guide to FDD).
  • Sell them the vision: if you cannot sell these people on the benefits to them, their colleagues and the organization of the new way of working then something is wrong
  • Provide in-depth training and on-going coaching. It is better to have a single lead person trained in-depth who can coach his teammates through the basics than to have the whole team trained on the basics with no-one on the team to turn to when the basics are not enough.
  • ...3 more annotations...
  • Providing initial training is simply not enough. When the pressure is on, the temptation to return to previous ways of doing things is often too strong to resist. If technical leads are to work for you, they need on-going support and coaching, and a means by which they can support each other.  Good external coaches (expert chickens?) can help here.
  • Let the technical leads continue working on their projects. Some fail at the final hurdle by doing 1-3 above and then assigning or scheduling the technical leads to coach other projects, effectively turning them from pigs into chickens.
  • To summarize, if you can produce a change in the behavior of the lead pigs, the other pigs will, by definition, follow. However, pigs will not follow chickens for long because chickens are simply not pigs.
  •  
    Last month David Anderson wrote a two-part article on why agile transformation initiatives fail. David's suggestion to concentrate on cultural change reminded me of one of my favorite bits on process initiatives. From Peter Coad's book, Java Modeling in Color...
Yuval Yeret

Social, Agile, and Transformation: The ScrumMaster - A role or responsibility? - 0 views

  • So if they needed the ScrumMaster role filled, then this was something they were prepared to train and assign to either a project manager or possibly a technical lead. The consensus of this team was, if you found a project manager skilled enough to have a real technical dialog with the development team, then this person could be trained and perform the ScrumMaster role.
  • The Scrum Alliance published a survey that has some supporting evidence. Over 60% of the 1100 people that responded to the survey had nine or more years of industry experience, 15% of them had twenty or more years of experience, and 35% had Masters degrees. Also, of the people who responded, 22% were project managers and another 21% were either Managers or Directors. So my simple translation is that practicing ScrumMasters are managers (project or other) with significant (10+) years of proven experience. Training and assigning this role to experienced project managers or software development managers seems like a viable approach to have the responsibility filled and having a dedicated ScrumMaster separate from these roles may not be necessary.
Yuval Yeret

Kanban development oversimplified: a simple explanation of how Kanban adds to the ever-... - 0 views

  • It’s a lot easier to estimate a story that’s small — which can lead to more accurate estimates, and better predictability.
  • It’s easier to plan with smaller stories. With big stories — stories that might take weeks for a developer to implement — it becomes difficult to plan a development time-box — particularly when the iterations are only a couple of weeks. It seems that only a couple stories fit — and there’s often room for half a story — but how do you build half a story? Splitting them into smaller stories makes it easier to plan those time-boxes.
  • Shrinking stories forces earlier elaboration and decision-making. Where product owners could write their stories fairly generally and consider many of the details later, now breaking them down into smaller stories forces more thinking earlier in a planning lifecycle.
  • ...36 more annotations...
  • Managing little stories forces us to keep better track of how they fit together. Product owners are often asked to break down stories to a level where a single story becomes meaningless. To keep track of what’s meaningful to them and other stakeholders, they often need to keep track of bigger items such as the features of the product and how many stories contribute to building up that feature.
  • The result of these herniated time-box activities is a cycle that’s actually 3-4 times longer than our time-box. To get work done, we’ll use a time-box to elaborate stories, one to develop them, another to more thoroughly test them, and if there are bugs, possibly another to fix them.
  • During an ideal Agile time-box we’ll have frequent discussions between developers, testers, and those on a product owner team — like business analysts, user experience people, and business people. We’ll do this to understand what we need to build and describe what we’ll do to validate the story was really done. When time-boxes are short, there’s less time for this conversation. It’s common to move many of the conversations to detail the story and describe acceptance to the time-box before so we can be ready to really get moving with development when the time-box starts.
  • It’s difficult to fit thorough validation of the story into a short time-box as well. So, often testing slips into the time-box after. Which leaves the nasty problem of what to do with bugs� which often get piped into a subsequent time-box.
  • Anyone who’s attended an Agile planning meeting knows they can often last about an hour longer than you can stand it
  • As time-boxes shrink those on the product owner team and testers find themselves in a constant mode of getting ready for a next time-box and evaluating past time-boxes
  • work long hours, attend lots of meetings, and seem to have less time to be available to help developers with the current time-box. Since their focus is on a future or past time-box, questions about this time-box seem like interruptions. Collaboration decreases and tensions increase. Their work load is heavy, bumpy, not smooth or even.
  • Kanban cards are used to limit the amount of inventory the factory builds. It doesn’t do the Toyota factory any good to build doors faster then they can assemble cars. It just wastes money on excess doors, and parts of doors. Excess work in progress is considered to be waste in Lean manufacturing. (It’s probably waste in non-Lean manufacturing too.) In the above completely made up example, you’ll never have more than 15 finished doors hanging around. (Mudha is Japanese for waste. Learn it to impress your Lean friends.)
  • “Kan” means visual, and “ban” means card or board.
  • Kanban thinking in software development attempts to do a similar thing. We want to limit unnecessary work in progress to be no higher than it needs to be to match the throughput of the team.
  • In Kanban development: time-boxed development is out stories are larger and fewer estimation is optional or out completely velocity is replaced by cycle time
  • Exactly what’s left of Agile if we get rid of time-boxes, change the meaning of stories, and stop measuring velocity. And, exactly what do car doors and Kanban cards have to do with software development? Don’t get hung up on process. Remember, agile development isn’t a process.
  • You might have a column where business analysts spend time tracking down technical details that developers need to understand to write code.
  • These columns aren’t set. You should discuss with your team the phases that stories go through to be completed. Some organization may use columns for writing documentation, or preparing customer service people to support the feature in production.
  • The top is used for stories currently in progress in that phase. The bottom is the buffer. When work for that phase of the story is completed, it moves from “in progress” to the “buffer” where it’ll wait to be pulled into the next phase.
  • When we set limits for work in progress, we’ll set a total number for the process step that includes both “in process” and the “finished buffer” for that process step.
  • Stories must be minimal marketable features
  • To be marketable the feature needs to be large enough to be useful — probably larger than the teeny stories that take a couple days to build and seem to be best practice in Agile development today. A MMF may take weeks to build. But the important thing isn’t how long it takes to build, but that it be understandable and valuable to those who’ll receive it. To identify a MMF some folks ask the question “Would I announce it in my company’s product blog?” If it’s too tiny to mention, then it’s not a MMF.
  • To be lean, we’ll limit the number of stories we allow onto the board. A common formula is to add up all the members of the team in all roles and divide by two. All roles includes developers, analysts, user interfaced designers, testers, deployment people — anyone immediately responsible for getting features to market. For example, if team members total 20, we might limit the number of MMF-style stories on the board to 10.
  • Today developers have finished a story, and s they walk to the Kanban board to move it out of development, they notice their single buffer slot is full — and the “testing in progress” column is filled to its limit. What now? The developers talk to the testers. “We’re really struggling to keep up here. It’ll be till tomorrow morning before we can get some of these stories moved out.” “Hmm�” says a developer “Can we help test?” “Of course you can!” says the tester. “With your help we can get these cleared out by the end of the day.“ The tester grins “I just don’t want you validating a story you implemented.”
  • For the limits of the story process steps, the limit is often half the number of people that can perform the work for that phase of development. For instance if you have 6 developers, you might limit the development in progress column to 3. Now, this will force developers to work together on stories. I do find in practice that this may not work out for all teams — so I often see limits that equal the number of developers (or those that can perform the process step) or often 1.5 * the number of people in a role. Of course if you do this, it’ll raise the overall work in progress — and as you might expect, items will take longer to finish.
  • When a column in a Kanban board is full, we know that group is at capacity. We also know that if this keeps happening that that process step is likely where a bottleneck is.
  • If you’ve ever waited in line for the Pirates of the Caribbean in Disneyland you might remember signs along the way that say “Your wait time from here is 30 minutes” — something like that. Now you can post your own wait times on your Kanban board. At the bottom of your story queue post the average cycle time with wait time. It’ll say something like “Your wait time for a story here is approximately 18 days.” At the top of the queue post the average working cycle time. It might say “your wait time from here is 14 days.”
  • When you place focus on how quickly you can get functionality done, and have the ability to measure just that, then the estimates don’t much matter. In fact, many using a Kanban approach have simply stopped estimating at all. Yes story sizes vary, but being able to give a wait time plus or minus a few days is sufficient for many organizations’ concerns.
  • But, since there’s no development time-box in Kanban development, we’ll measure story-by-story how long they took to complete — the “cycle time” of the story.
  • Some do still estimate stories. Then use those estimates in conjunction with cycle time. Using a spreadsheet we can calculate the average cycle time for stories with a given estimate. If you do this, consider placing a handy chart next to your Kanban board showing estimate in one column, and wait times in adjacent columns. With this you’re answering the real question stakeholders are asking for when they get estimates: “when am I going to see this functionality in the software?”
  • If your stakeholders are like mine, they don’t want to know when they’re going to get this functionality, the want to know when they’re going to get all this functionality. I find that if I place stories into a spreadsheet with start and end dates, and calculate cycle time, if I select an arbitrary time period — say a two or three week time period — I can see how many stories where completed during this time period. For instance I might see the team finished 22 stories in 3 weeks — that’s about 7.3 stories per week. Given a backlog of 100 stories I can reasonably infer that it’ll take between 13 and 14 weeks (100/7.3). That’s yesterday’s weather for Kanban — at least the way I calculate it.
  • If I know that during three week time period there where 15 working days and that 5 developers worked the entire time, that’s 75 developer days. Knowing that lets me calculate the average number of developer days per story: 3.4 (75/22) — Which is darn close to pi — which makes me believe it has to be right. ;-) This number, 3.4, is what XP practitioners referred to as load factor.
  • Evaluation cycles, not development time-boxes
  • The only difference is the cycles aren’t used to plan and commit to stories any longer.
  • The daily standup or daily scrum meeting occurs as normal, but now it occurs in front of the Kanban board. Instead of the regular meeting ritual of checking in with each person to find out what they worked on yesterday and will work on today, the discussion revolves around the Kanban board and what will likely move on and off the board today, where “traffic” seems the heaviest, and what we could do to clear bottlenecks.
  • Reflect every few weeks
  • Lean practices help teams increase throughput. They don’t make developers type faster, rather they draw attention to bottlenecks that slow things down, help you see them and respond to them quicker. Using a Kanban board lets you easily visualize work in progress across different roles and lets you see when someone is taking on too much work simultaneously.
  • Demonstrate every few weeks
  • A task board as it’s commonly used in an agile approach can give you the visualization too. But, widening the task board to separate testing from development from acceptance or other process steps helps me better visualize where things are clogging up — helps me better diagnose problems. And, setting hard limits for process steps and respecting them really makes me deal with the problem in a way that dropping a pile of stories into a sprint or iteration didn’t. But, maybe it’s just me who’s lazy and avoids dealing with tough problems. I’m sure you’d never run into a situation where you and your team let lots of finished development work pile up waiting to be tested.
  • There’s no one as zealous as the newly converted There’s a lot of folks pretty excited about Kanban out there. I am too. Sometimes that zeal takes the form of telling people practicing common agile time-boxed development that they’re wrong. But, I guess I’m crusty enough to know that there’s lots of right ways to succeed and anyone who believes they’ve found the best ways is likely wrong. Don’t let those voicing opinions strongly for, or against, Kanban approaches stop you for digging in deeper and understanding the ideas behind it.
  •  
    one of the best articles about Kanban and its relation to Agile I've encountered so far - focusing on Feature development (not maintenance)
Yuval Yeret

Engineering Higher Quality Through Agile Testing Practices The Agile Coach - 1 views

  • Maintaining quality involves a blend of exploratory and automated testing. As new features are developed, exploratory testing ensures that new code meets the quality standard in a broader sense than automated tests alone. This includes ease of use, pleasing visual design, and overall usefulness of the feature in addition to the robust protections against regressions that automated testing provides. 
  • Exploratory testing is a risk-based, critical thinking approach to testing that enables the person testing to use their knowledge of risks, implementation details, and the customers' needs.
  • On our development teams, QA team members pair with developers in exploratory testing, a valuable practice during development for fending off more serious bugs. Much like code review, we’ve seen testing knowledge transfer across the development team because of this. When developers become better testers, better code is delivered the first time.
Yuval Yeret

Why agile transitions initiatives might fail : Jeffrey Palermo (.com) - 1 views

  • The executive makes a “vendor” or external “coach” responsible for the transition If you have handled the first risk and have defined success and success metrics, you likely will not find a vendor who will base his payment on your metrics.  After all, the metrics likely call for less project failure rate, faster response times, etc.  You probably can’t measure these things in less than a year if you really want objective metrics and not one optimized for short-term results at the expense of the longer term.  A vendor might want: # of people trained % of teams using an “agile” project management tool # of teams with an embedded “agile champion” # of successful iterations It is really easy to accomplish the above metrics and still not make any material change in the organization.  I have worked with a client that did something similar to the above.  Most of the teams starting using some new Scrummy project management web application for project tracking.  They declared that monthly status meetings were now iterations.  They declared a member of the team to be the Scrummaster (and sent that person to training).  Overall, the same organizational problems persisted.  Vendors cannot produce real change in an organization unless the organizations executive leadership alters the culture in a meaningful way.