Both technologies require room for periodic ship-borne maintenance and repair access, with subsurface equipment which could impinge on the other facility if they're too close. And if one of the turbines breaks, as happened in 2010 with an earlier tidal turbine in the Bay of Fundy, PC Landing worries it could damage the nearby cable.