PEAT Research, Development and Testing - Waste to Energy System - 0 views
-
emily wilson on 21 Mar 14PEAT designed, built, operated and maintained a 150 kW pilot plasma gasification system previously located at a facility in Huntsville, Alabama since 1992. The plasma gasification system was able to process 50 to 100 KGs per hour of test materials, depending on the material characteristics.