Skip to main content

Home/ Politically Minded/ Group items tagged Israeli West Bank Barrier

Rss Feed Group items tagged

Muslim Academy

West Bank Barrier - A Brief Story - 0 views

  •  
    Since June 16, 2002, the Israeli Government has been constructing a West Bank Barrier in Jerusalem. The concrete wall is 750 kilometers in length and eight meters high. Thick concrete walls are equipped with trenches, barbed wire, electrified wire, watch towers, electronic sensors, video cameras, unmanned aircraft, sniper towers, and roads for patrol vehicles. The point is: there is no possibility to penetrate the wall. The barrier wall was built in a zig zag shape through ten of 11 districts; across all cities in the West Bank. Construction of the first phase started from the west to north of Jerusalem along 145 kilometers and was completed in July, 2003. The second phase is underway, ranging from eastern West Bank to southern Jerusalem. This wall needed a lot of funding, but the total cost of construction was never made public. For the barrier wall maintenance alone, Israel has to spend U.S $4.7 million/mile. So the total funds needed for the maintenance of the West Bank Barrier along the 750 kilometers is U.S. $ 3.4 billion.
1 - 1 of 1
Showing 20 items per page