#Fukushima I Nuke Plant Reactor 1 Balloon Survey of 5th Floor Was Unsuccessful |[08Aug12] - 0 views
-
According to TEPCO's press release on 8/8/2012, the balloon couldn't pop out onto the operating floor (5th floor) because it was stopped by a cable on the 4th floor. The balloon did take photographs of the 4th floor. The purpose of the survey (not fulfilled by this project) was to see what the 5th floor was like, in order to prepare for the future removal of fuel assemblies from the Spent Fuel Pool. (See my post from July 23, 2012.)
-
5 TEPCO employees and 14 affiliate company workers did the work, for about 35 minutes, receiving maximum 1.54 millisievert for the shortened work.
-
Purpose The investigation was conducted to understand the current condition of Unit 1 operating floor (5th floor) and provide inputs to the consideration of fuel removal from the spent fuel pool.