BSOP330 Week 6 Lab

started by mariabrogersm on 15 May 14
  • mariabrogersm
     
    BSOP330 Week 6 Lab report is like any other lab report and one has to be very strict about the guidelines and instructions to prepare a well documented lab report.

    Some of the basic questions that will help your report to be more illustrated one are:

    You have developed the following simple product structure of items needed for your gift bag for a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume that there is no inventory on hand of any of the items. Explode the bill of material.

    The next question is as follows:Image

    The demand of subassembly S is 100 units in week 7. Each unit of S requires 1 unit of T and 2 units of U. Each of unit of T requires 1 unit of V, 2 units of W, and 1 unit of X. Finally, each unit of U requires 2 units of Y and 3 units of Z. One firm manufactures all items. It takes 2 weeks to make X, 2 weeks to make Y, and 1 week to make Z.

    a) Construct a product structure. Identify all levels, parents and components.

    b) Prepare a time-phased product structure.

    As the production planner for Gerry Cook Products, Inc. you have been given a bill of material for a bracket that is made up of a base and one casting. Each housing has two bearings and one shaft. There is no inventory on hand. Your boss at Gerry Cook Products, Inc. has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week 10. The lead times for the components are bracket (1 week), base (1 week) etc. In what week do you need to start the castings?

    These instructions will surely help one prepare a very versatile report.