Permanent Link to Feature Flow - Increasing velocity using Kanban - 1 views

  • team that had some problems getting their process right
  • their velocity was decreasing and spirits were low. Luckily we managed to change our process by changing some basic Scrum practices and replacing some of them with Lean practices, inspired by the new Kanban articles and presentations. Productivity is now higher than ever and we can now focus on what really matters: product quality and customer satisfaction.
  • one major issue: getting things done. The major symptom was the frustration of management and the team with the project. The first 3-week time box (sprint) ending with about 30% (!) of all features still in progress, when, of course, they should all have been done and ready for shipment.
  • ...9 more annotations...
  • existing solution to this problem was to lower the expected velocity each sprint, so the next sprint would be on-time. But at the end of next sprint, the same problem occurred, so the velocity was going down sprint after sprint.
  • pressure of the rest of the organisation for the team to keep up their tempo. This pressure from both sides was crushing morale.
  • The way this team reacted to pressure was to work harder. Most people would have 2 or 3 tasks in progress at the same time. When a developer would finish a task, the testers were too busy testing something else, so they could give the developer direct feedback. When the tester found an issue with a new feature, the developers were already working on something else, so the tester had to wait. Simply put, there was too much focus on working long and hard, not on cooperation and the stuff that actually matters: features.
  • most dysfunctional behaviour comes from the system people are in
  • biggest struggle of this team: pressure & predictability.
  • Most Scrum masters challenge the team to reach the same (or higher) velocity each sprint. This pressure should give a team focus to perform at its best. However, it can also go haywire if the team doesn't deliver. No focus, no pride, no happy customer
  • retrospectives were dismal and planning meetings were a huge burden. The teams' productivity dropped in the days after the sprint, finding new courage to start the next one. Because they had an ineffective work-process, the only outcome of each sprint was to lower the expected velocity, to make sure we would be predictable. Estimation and predictability are only a means to an end and since they were getting in the way of fixing the root cause (and were bringing down the team's spirit) I opted to cut out the planning sessions and sprint deadlines.
  • first change we made was to set a limit of 8 tasks on the 'in progress' column
  • We spent 3 weeks bringing the numbers of open tasks from 21 to 8, without picking up any new work. Of course the team struggled with this new limit. They were used to pick up new work whenever they were blocked somehow, this wasn't allowed any more
Yuval Yeret

Engineering Higher Quality Through Agile Testing Practices The Agile Coach - 1 views

  • Maintaining quality involves a blend of exploratory and automated testing. As new features are developed, exploratory testing ensures that new code meets the quality standard in a broader sense than automated tests alone. This includes ease of use, pleasing visual design, and overall usefulness of the feature in addition to the robust protections against regressions that automated testing provides. 
  • Exploratory testing is a risk-based, critical thinking approach to testing that enables the person testing to use their knowledge of risks, implementation details, and the customers' needs.
  • On our development teams, QA team members pair with developers in exploratory testing, a valuable practice during development for fending off more serious bugs. Much like code review, we’ve seen testing knowledge transfer across the development team because of this. When developers become better testers, better code is delivered the first time.
Yuval Yeret

Continuous Integration - 0 views

  • On the whole I think the greatest and most wide ranging benefit of Continuous Integration is reduced risk. My mind still floats back to that early software project I mentioned in my first paragraph. There they were at the end (they hoped) of a long project, yet with no real idea of how long it would be before they were done.
Yuval Yeret

tips on reviving retrospectives from the retrospectives yahoo group - 0 views

  • Has the team made changes that make a difference to them as a result of the retrospective?
  • Has the team explored a variety of different topics/areas, or do they stick to pretty much the same agenda around continuous improvement? What is the balance of change/improvement work vs. working on the product?
  • For example, try looking at technical practices, teamwork, or customer relationships... choose what ever seems most relevant to bound the discussion. That might help the team dig deeper and find issues that have more significance for them (now...I'm sure the other changes were significant at the time).
  • ...14 more annotations...
  • Try a 'speed retrospective'. How quickly can the team get together and find one good, solid improvement to make? Make it exciting and use a stopwatch. I wouldn't do this all the time, but again, what harm to try it once?
  • How about one retrospective where you set yourselves the challenge of generating actions from the "What did we do well" column? In other words, find an action designed to magnify an existing positive rather than remedy an existing negative.
  • How about a 'Show and Tell' retrospective where every team member comes to the meeting with an action item and its explanation already prepared? The retrospective would really be each person presenting their idea in turn.
  • How about a retrospective wherein you challenge yourselves to come with a new approach to retrospectives that is so exciting that people would skip other work activities to attend?
  • I find it very important to revisit the outcome of the past retrospective and celebrate the things the team had been able to do differently.
  • The major thing is to make the changes visible and memorizable for everyone and not assuming that people remember what they decided on in the last retro.
  • Another thing is that I would invite team members to take turns in facilitating the retro. So not always the same person runs the retro (this typically also changes the format and techniques a bit).
  • - Heartbeat Retrospective (google for Boris Gloger)
  • - Temperature Reading
  • - Team Radar Chart
  • - Our project / team / product ship - draw a ship on a flip chart, ask the team what moved the ship forward, what blocked it
  • Just to add a totally different direction: I've made good experiences with having a *long* retrospective every few months. The short retrospectives are great to see the trees and optimize the daily work. A two or even three day retrospective helps the team to step back and watch the forrest instead.
  • It is important to get at least one item done every sprint. If you do the retro, but don't implement any of the actions, this is a tremendous demotivator. Better one thing finished that you can celebrate than 5 unfinished things in the queue.
  • Variety is the spice of life, so some variation is essential to keep the freshnees. Change the moderator, do technical focus once, then organisational, then "improving the fun factor", then go back to a general retro.
Yuval Yeret

From the Agile Transformation Trenches: Culture Change with Pigs, not Chickens - 0 views

  • Identify the technical leaders within projects; those that are “self-driven to produce quality results on time … combine technical ability with enough people skills …are trusted and respected by both their managers and fellow developers, are determined to make the team succeed, and usually live the work.” (Chief programmers, Chapter 2:  A Practical Guide to FDD).
  • Sell them the vision: if you cannot sell these people on the benefits to them, their colleagues and the organization of the new way of working then something is wrong
  • Provide in-depth training and on-going coaching. It is better to have a single lead person trained in-depth who can coach his teammates through the basics than to have the whole team trained on the basics with no-one on the team to turn to when the basics are not enough.
  • ...3 more annotations...
  • Providing initial training is simply not enough. When the pressure is on, the temptation to return to previous ways of doing things is often too strong to resist. If technical leads are to work for you, they need on-going support and coaching, and a means by which they can support each other.  Good external coaches (expert chickens?) can help here.
  • Let the technical leads continue working on their projects. Some fail at the final hurdle by doing 1-3 above and then assigning or scheduling the technical leads to coach other projects, effectively turning them from pigs into chickens.
  • To summarize, if you can produce a change in the behavior of the lead pigs, the other pigs will, by definition, follow. However, pigs will not follow chickens for long because chickens are simply not pigs.
  •  
    Last month David Anderson wrote a two-part article on why agile transformation initiatives fail. David's suggestion to concentrate on cultural change reminded me of one of my favorite bits on process initiatives. From Peter Coad's book, Java Modeling in Color...
Yuval Yeret

Social, Agile, and Transformation: The ScrumMaster - A role or responsibility? - 0 views

  • So if they needed the ScrumMaster role filled, then this was something they were prepared to train and assign to either a project manager or possibly a technical lead. The consensus of this team was, if you found a project manager skilled enough to have a real technical dialog with the development team, then this person could be trained and perform the ScrumMaster role.
  • The Scrum Alliance published a survey that has some supporting evidence. Over 60% of the 1100 people that responded to the survey had nine or more years of industry experience, 15% of them had twenty or more years of experience, and 35% had Masters degrees. Also, of the people who responded, 22% were project managers and another 21% were either Managers or Directors. So my simple translation is that practicing ScrumMasters are managers (project or other) with significant (10+) years of proven experience. Training and assigning this role to experienced project managers or software development managers seems like a viable approach to have the responsibility filled and having a dedicated ScrumMaster separate from these roles may not be necessary.
Yuval Yeret

Agile Resources: Velocity | VersionOne - 0 views

  • Does maximum velocity mean maximum productivity? Absolutely not. In an attempt to maximize velocity, a team may in fact achieve the opposite. If asked to maximize velocity, a team may skimp on unit or acceptance testing, reduce customer collaboration, skip fixing bugs, minimize refactoring, or many other key benefits of the various Agile development practices. While potentially offering short-term improvement (if you can call it that), there will be a negative long-term impact. The goal is not maximized velocity, but rather optimal velocity over time, which takes into account many factors including the quality of the end product.
Yuval Yeret

InfoQ: Automated Acceptance Tests - Theoretical or Practical - 0 views

  •  
    especially for you elad ;-)
Yuval Yeret

James Shore: The Art of Agile Development: Simple Design - 0 views

  • Simple Design AudienceProgrammers Our design is easy to modify and maintain
  • Perfection is achieved, not when there is nothing more to add, but when there is nothing left to take away. —Antoine de Saint-Exupéry Any intelligent fool can make things bigger, more complex and more violent. It takes a touch of genius and a lot of courage to move in the opposite direction. —Albert Einstein
  • When writing code, agile developers often stop to ask themselves, "What is the simplest thing that could possibly work?" They seem to be obssessed with simplicity. Rather than anticipating changes and providing extensibility hooks and plug-in points, they create a simple design that anticipates as little as possible, as cleanly as possible. Unintuitively, this results in designs that are ready for any change, anticipated or not.
  • ...10 more annotations...
  • I don't think XP and patterns are conflicting. It's how you use patterns. The XP guys have patterns in their toolbox, it's just that they refactor to the patterns once they need the flexibility
  • You Aren't Gonna Need It (YAGNI) This pithy XP saying sums up an important aspect of simple design: avoid speculative coding. Whenever you're tempted to add something to your design, ask yourself if it supports the stories and features you're currently delivering. If not, well... you aren't gonna need it. Your design could change. Your customers' minds could change.
  • We do this because excess code makes change difficult. Speculative design, added to make specific changes easy, often turns out to be wrong in some way, which actually makes changes more difficult. It's usually easier to add to a design than to fix a design that's wrong. The incorrect design has code that depends on it, sometimes locking bad decisions in place.
  • Once and Only Once
  • avoid duplication. "Once and only once" is the Extreme Programming phrase. The authors of The Pragmatic Programmer [Hunt & Thomas] use "don't repeat yourself," or the DRY principle.
  • Self-Documenting Code Simplicity is in the eye of the beholder. It doesn't matter much if you think the design is simple; if the rest of your team or future maintainers of your software find it too complicated, then it is.
  • What if we know we're going to need a feature? Shouldn't we put in a design hook for it? In XP, the plan can change every week. Unless you're implementing the feature that very week, don't put the hook in. The plan could change, leaving you stuck with unneeded code.
  • Results When you create simple designs, you avoid adding support for any features other than the ones you're working on in the current iteration. You finish work more quickly as a result. When you use simple design well, your design supports arbitrary changes easily. Although new features might require a lot of new code, changes to existing code are localized and straightforward.
  • Simple design requires continuous improvement through refactoring and incremental design and architecture. Without it, your design will fail to evolve with your requirements. Don't use simple design as an excuse for poor design. Simplicity requires careful thought. As the Einstein quote at the beginning of this section says, it's a lot easier to create complex designs than simple ones. Don't pretend "simple" means "fastest" or "easiest.
  • Until recently, the accepted best practice in design followed the advice Erich Gamma now disavows: "The key to maximizing reuse lies in anticipating new requirements and changes to existing requirements, and in designing your systems so they can evolve accordingly."