What does 5D BIM mean for Cost Managers? - 0 views
-
Hitech CADD Services on 31 May 165D BIM is integrates the cost estimation ability to the BIM model in a way that any change in the design is reflects immediately in the budget. The 4D model-based project schedule integrates a series of interdisciplinary performance models which includes the structure, labor force, workflow sequence and process of the design and construction.