Skip to main content

Home/ nuke.news/ Group items matching "ignalina" in title, tags, annotations or url

Group items matching
in title, tags, annotations or url

Sort By: Relevance | Date Filter: All | Bookmarks | Topics Simple Middle
Energy Net

Ignalina nuclear power plant asks permission to increase price on electricity :: The Baltic Course - 0 views

  •  
    At present, Ignalina nuclear power plant buys the nuclear fuel for about 80% higher price than over the previous year. Network distribution companies are also preparing plans for raising prices. Ignalina nuclear power plant intends to present the request to the State Control Commission for Prices and Energy until October 2008 on the increase of the sale price for the produced electricity.
Energy Net

balticbusinessnews.com - Estonia close to pulling the plug on nuclear power project - 0 views

  •  
    Estonian leaders seem to have made a principle decision that Estonia would distance itself from the Ignalina Nuclear Power Plant project. Postimees writes that both Prime Minister Andrus Ansip and Eesti Energia CEO Sandor Liive said on Friday that if Estonia decided to opt for nuclear power, the priority should be in building its own nuclear power plant. This marks a new shift in thinking since it is the first time in the last two years when the government and Eesti Energia have been promoting the Ignalina project as the answer to Estonia's energy problems.
Energy Net

Reuters - Lithuania wants EU aid or will keep nuclear plant - 0 views

  •  
    Lithuania may have to defy the European Union and keep its Ignalina nuclear power plant open beyond 2009 if the EU cannot help it assure energy supplies, the prime minister and economy minister said on Thursday. Lithuania agreed under its EU entry treaty to close Ignalina, which has the same kind of reactors as at Chernobyl in Ukraine, where the world's worst nuclear disaster happened in 1986.
Energy Net

balticbusinessnews.com - Experts doubt capacity of the new Ignalina Nuclear Power Plant - 0 views

  •  
    It is not yet clear whether the planned Ignalina Nuclear Power Plant will have sufficient capacity to meet the needs of all four partner countries. Eesti Päevaleht writes that the limiting factor is the opposition of local residents to the project and the volume of cooling water that can be extracted from Lake Druksiai.
Energy Net

AREVA TA Wins a Contract to Design a Low and Medium Level Waste Disposal Center in Lithuania | Reuters - 0 views

  •  
    ollowing an international tendering process, the team of companies headed up by AREVA TA (Paris:CEI) was awarded a contract to design a near surface repository for low and medium level waste on the Ignalina nuclear power plant site in Lithuania. The project, funded primarily by the EBRD, includes the design studies for the repository and on-site support during construction. The repository will receive low and medium level operational waste recovered from the dismantling of the Lithuanian power plant. As part of AREVA's Reactors and Services division, AREVA TA has extensive experience in the design of such facilities for radioactive waste, or in providing support to projects for their design and construction. Other team members include the French national radioactive waste management agency ANDRA, which will provide its expertise in this field, the Lithuanian Energy Institute (LEI), which brings experience in safety an environmental assessment, and knowledge on national regulations, the company Specialus Montazas-NTP (SM-NTP), which contributes skills in geology, civil engineering, seismic design and mechanical design, and the company Pramprojektas (PP), which brings infrastructure know-how.
  •  
    ollowing an international tendering process, the team of companies headed up by AREVA TA (Paris:CEI) was awarded a contract to design a near surface repository for low and medium level waste on the Ignalina nuclear power plant site in Lithuania. The project, funded primarily by the EBRD, includes the design studies for the repository and on-site support during construction. The repository will receive low and medium level operational waste recovered from the dismantling of the Lithuanian power plant. As part of AREVA's Reactors and Services division, AREVA TA has extensive experience in the design of such facilities for radioactive waste, or in providing support to projects for their design and construction. Other team members include the French national radioactive waste management agency ANDRA, which will provide its expertise in this field, the Lithuanian Energy Institute (LEI), which brings experience in safety an environmental assessment, and knowledge on national regulations, the company Specialus Montazas-NTP (SM-NTP), which contributes skills in geology, civil engineering, seismic design and mechanical design, and the company Pramprojektas (PP), which brings infrastructure know-how.
Energy Net

Lithuanian hope for nuclear extension dashed by EU - Forbes.com - 0 views

  •  
    Lithuania's hopes of being allowed to extend the life of its Ignalina nuclear power plant were dashed on Wednesday by the European Commission. In its treaty on joining the European Union in 2004, Lithuania promised to shut by the end of 2009 the second reactor at the plant, which is similar to Ukraine's Chernobyl facility where the world's worst nuclear disaster struck in 1986.
Energy Net

Europe.view | Lithuania split by the atom | Economist.com - 0 views

  •  
    As part of the deal to join the European Union, Lithuania agreed to close its perfectly serviceable nuclear-power station at Ignalina. No engineering or safety case for this was ever made: the requirement was a political one, sprouting from a neurotic strand of greenery in western Europe.
Energy Net

Probe into alleged use of stolen parts in Lithuanian nuclear plant : Europe World - 0 views

  •  
    "A senior parliamentarian in Lithuania has launched an investigation into allegations that stolen parts were installed in the country's only nuclear power plant, the Baltic News Service and other local media reported Tuesday. Rokas Zilinskas, chairman of the Baltic state's parliamentary nuclear energy commission, has asked prosecutors to look into claims that equipment stolen from Russia's Leningrad nuclear power plant was later installed in Lithuania's Ignalina facility. A company called Energetikos Tiekimo Baze allegedly shipped equipment stolen from Russia to Lithuania under false papers in 2003- 2004, media reports claimed. The equipment, described as servo drives used to lower graphite rods into the nuclear reactor, was allegedly later installed at Ingnalina. "If it is found out that the law and order institutions failed to take any (necessary) measures ... this will raise serious doubts as to their competence and ability to safeguard the interests of national security," Zilinskas said in a statement."
1 - 9 of 9
Showing 20 items per page