Hanford News: Moratorium on shipping radioactive waste to Hanford broadened - 0 views
-
Energy Net on 02 Nov 09The Department of Energy is adding another type of radioactive waste to those that won't be sent to Hanford until the vitrification plant is fully operational. Tuesday, DOE prepared a statement saying that even though its agreement with the states of Washington and Oregon did not cover greater-than-class-C low level radioactive waste, "this waste will not be imported to Hanford for the duration of the moratorium that defers the importation of waste to Hanford." Greater-than-class-C low, or GTCC, waste is more radioactive than the waste Hanford now is burying in its landfill for radioactive waste, the Environmental Restoration Disposal Facility. As part of a proposed settlement with the states over a lawsuit brought against DOE, DOE had agreed to recommend in a draft environmental study not to import certain kinds of waste to Hanford until the vit plant is operating to treat high level radioactive tank waste. That's expected to be about 2022. Federal law requires the environmental study before a final decision on the moratorium is made.
-
Energy Net on 02 Nov 09The Department of Energy is adding another type of radioactive waste to those that won't be sent to Hanford until the vitrification plant is fully operational. Tuesday, DOE prepared a statement saying that even though its agreement with the states of Washington and Oregon did not cover greater-than-class-C low level radioactive waste, "this waste will not be imported to Hanford for the duration of the moratorium that defers the importation of waste to Hanford." Greater-than-class-C low, or GTCC, waste is more radioactive than the waste Hanford now is burying in its landfill for radioactive waste, the Environmental Restoration Disposal Facility. As part of a proposed settlement with the states over a lawsuit brought against DOE, DOE had agreed to recommend in a draft environmental study not to import certain kinds of waste to Hanford until the vit plant is operating to treat high level radioactive tank waste. That's expected to be about 2022. Federal law requires the environmental study before a final decision on the moratorium is made.