“I am interested in heat generation, this place is about cement—no match!” he told me (through an interpreter) at the factory in Zibo. He spent nearly the next 20 years of his career in a long effort to make the dirty, wasteful, fast-growing cement industry less environmentally destructive.
The heart of his idea—easy to describe, tricky to implement—is capturing the enormous amount of heat normally wasted in cement making and using it to run turbines that generate electric power. This power can then be fed back into the factory, doing work that would otherwise require burning even more coal. The reduction of dust is a visible indicator of the more fundamental reduction of waste. Over the course of a long day, I heard about the many, many refinements Tang had made to this “co-generation” system since he first started working on it, in the mid-1980s. The punch line is that it now works well enough to cut the energy (mainly from coal) required to make clinker by 60 percent, and the overall power demands of the cement production line by 30 percent.
散步后让我们集体过马路 - 0 views
看看真正的汉奸 - 0 views
某人与中石油彭州千万吨炼油厂环境评价联络人的通话 | 自曲新闻 - 0 views
China's Ongoing Water Woes.. and Power Woes Too??? | All Roads Lead To China - 0 views
1More