Terminal machine maintenance is divided into routine maintenance and second-class maintenance. Here let’s take a brief look at the method of its routine maintenance. 1.Usually terminal machine stamping guide rails need lubrication oil per 1-2 hours with filling hole. Each refueling do not drop